CHERY LIFE 0171 Retractable Pergola Installation Guide

July 7, 2024
CHERY LIFE

CHERY LIFE 0171 Retractable Pergola

Specifications

  • Dimensions: L=90x90x1760mm
  • Material: Steel
  • Weight: Varies based on configuration

Product Usage Instructions

Pre-assembly:

  1. Ensure you have at least two people for assembly.
  2. Prepare one or more stepladders for access.
  3. Wear protective gloves during assembly.
  4. Consider using a safety hat for added protection.
  5. Have a Phillips screwdriver ready for use.
  6. If needed, use a drill for easier construction.
  7. Consider using safety goggles for eye protection.
  8. Do not fully tighten screws until complete assembly.

Assembly Instructions:

  • Step 1:
    Connect part A1 and part A, part A2 and part A on the side of the wall using screws 1# and part B1 as shown in the diagram. Then, connect part A2 and part A, A1 and part A on the other side using screws 1# and part B.

  • Step 2:
    Use screws 1# to connect part C and C1, and also connect part C2 and C3 together. At the same time, connect five sliders (part S2) on each side as shown in the figure.

  • Step 3:
    Link part D and part D1, part D and part D2 using screws 1#. Also, link part E and part E1, part E and part E2 using screws 1#.

  • Step 4:
    Link part F and F1, part G and G1 using screws 1#. Connect the sliders (part S1 and part S) and then hang part R on the outside slider of part G1.

  • Step 5:
    Connect part D2 with A1, D1 with A2 using screws 2#. Also, connect part E1 with A2, E2 with A1 using screws 2#.

  • Step 6:
    Connect part C2 with A1, C3 with A2 using screws 2#. Also, connect part C with A2, C1 with A1 using screws 2#.

  • Step 7:
    Use screws 5# to connect part F with beams (part D1 & D2), and also connect part F1 with beams (part E1 & E2). Connect part G and G1 with beams (part D & E) in the same way.

  • Step 8:
    Insert part J & J1 into the pocket of top roof (part M) and then insert part H & H1 into the pocket of top roof in turn.

  • Step 9:
    Insert part L & K, L1 & K1 into the part M1 using part N.

  • Step 10:
    Secure the part M1 to the top using appropriate screws.

  • Step 11:
    Connect part J and part D1 according to the diagram provided in the manual.

Warning & Attention:

  1. Try to assemble on flat ground for ease of assembly.
  2. Consider assembling with three or more people for efficiency.
  3. After assembly, ensure all screws are tightened to prevent parts from falling apart.

Frequently Asked Questions (FAQ)

  • How many people are recommended for assembly?
    Two or more people are required for assembly.

  • What tools are recommended for assembly?
    You will need a Phillips screwdriver, possibly a drill for ease, and safety equipment like gloves and goggles.

  • Should I fully tighten screws before complete assembly?
    No, do not fully tighten screws until complete assembly to allow for adjustments.

Pre-assembly

  1. Two or more people are required for assembly.
  2. You will need one or more stepladders.
  3. Wearing protective gloves is recommended.
  4. You may need a safety hat.
  5. Please use a Phillips screw driver.
  6. For ease of construction, you may need a drill.
  7. You may need a safety goggle.
  8. Do not fully tighten screws prior to complete assembly.

Warning & Attention

  • Try to assemble this product on the flat ground, otherwise it is difficult to carry out;
  • It would be much easier to assemble the product with three or more people;
  • After assembly, please check whether all screws are tightened, to prevent parts from falling apart.

Part list

ASEEMBLY INSTRUCTION

  • Step 1: Connect part A1 and part A, part A2 and part A on the side of the wall using screws 1# and part B1 as shown in diagram.
    Then connect part A2 and part A, A1 and part A on the other side using screws 1# and part B.

  • Step 2: As shown in the figure, use screws 1# to connect part C and C1, and also connect part C2 and C3 together. At the same time, connect five sliders (part S2) on each side.

  • Step 3: Link part D and part D1, part D and part D2 using screws 1# as shown in diagram1# as shown in diagram. And link part E and part E1, part E and part E2 using screws 1# as shown in diagram.

  • Step 4: Link part F and F1, part G and G1 using screws 1# as shown in diagram. And connect the sliders(part S1 and part S). Then hang part R on the outside slider of part G1.

  • Step 5: Connect part D2 with A1, D1 with A2 using screws 2# as shown in diagram. Also, connect part E1 with A2, E2 with A1 using screws 2# as shown in diagram.

  • Step 6: Connect part C2 with A1, C3 with A2 using screws 2# as shown in diagram. Also, connect part C with A2, C1 with A1 using screws 2# as shown in diagram.

  • Step 7: As shown in the figure, use screws 5# to connect part F with beams (part D1&D2), and also connect part F1 with beams (part E1&E2). Then connect part G and G1 with beams (part D&E) in the same way.

  • Step 8: Insert part J&J1 into the pocket of top roof(part M) as shown in diagram, then insert part H&H1 into the of top roof in turn.

  • Step 9: Insert part L&K, L1&K1 into the part M1 using part N.

  • Step 10: Secure the part M1 to the top.

  • Step 11: Connect part J and part D1 and connect part H and part H1.

  • Step 12: When the canopy is folded, hang the other end of string (part R) into the hole on the inside of beam (part E) to secure the top roof.

  • Step 13: Insert stakes (part P) through the hole of stand plate (part B) into the ground, to stabilize the tent.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals