Elkay MFWS210 Bottle Filling Station Instruction Manual
- June 29, 2024
- ELKAY
Table of Contents
Elkay MFWS210 Bottle Filling Station
Specifications
- Model: MFWS210 / MFWS230
- Dimensions: 37 1/2″ W x 52 1/8″ H x 4 1/2″ D
- Electrical Requirements: Standard 120 Volts, 60 Hz, single phase
- Weight Capacity: Up to 150 lbs static load
Product Usage Instructions
Wall Opening Preparation
Cut a square rectangular wall opening according to dimensions provided in the
manual. Reinforce the opening on all sides to support the water fountain..
Wiring Instructions:
For wiring parts, contact your local distributor or visit Elkay or Halsey
Taylor websites for assistance.
FAQ
Q: What are the electrical requirements for the product?
A: The product operates on standard 120 Volts, 60 Hz, single phase electrical
supply.
MFWS210 / MFWS230 MOUNTING FRAME INSTRUCTIONS
-
Cut a square rectangular wall opening 37 1/2” (953mm) W x 52 1/8” (1324mm) H and 4 1/2” (114mm) above the floor line. These dimensions are required to obtain proper rim and bubbler heights for compliance with ANSI standard A117.1.
-
Reinforce the wall opening on all sides so that it will adequately support the water fountain. This reinforcement must support up to 150 lbs static load and provide a means for securing the frame assembly in place.
NOTE: Building construction must allow for adequate air flow on both sides and top of remote chiller unit. Minimum of 4” (102mm) is required. -
Install plumbing and electrical rough-ins. A junction box for a (3) wire, 10 amp branch circuit is provided on the inside of the chiller. (Standard 120 Volts, 60 Hz and single phase)
-
Remove frame assembly and related hardware from packaging. Attach the two frames together thru the upright supports with
(4) 5/16” x 3/4” (19mm) long bolts and nuts (provided). Tighten securely. -
Install the frame assembly squarely in wall opening with frame upright support edges flush with the finished wall face. Secure the frame to the wall thru holes with (12) 5/16” bolts or screws (not provided). Tighten securely.
NOTE: Be sure that frame is squared in location. Do not use less than required screw quantity and size. -
Attach the chiller shelf support rods to the right side frame uprights at the second set of holes counting from the bottom and to the shelf at the (2) side holes. Line up the other shelf holes with the frame bottom holes and fasten the assembly to the wall using appropriately sized screws or bolts and nuts (not provided).
-
Mounting Frame Wiring Instructions:
- Turn off electrical supply to installation location circuit.
- Remove Junction Box Cover to gain access to electrical box.
- Connect electrical supply using conduit, wiring, and connectors per local and national codes.
- Connect ground wire to ground screw (provided).
- Connect black wire to ”hot” power supply line 120V 60Hz, 1 phase.
- Connect white wire to Neutral line.
- Replace Junction Box Cover.
- Connect electrical power to installation location circuit.
Patent zurn-elkay.com/patents
WARNING: Cancer and Reproductive Harm –
www.P65Warnings.ca.gov
FOR PARTS, CONTACT YOUR LOCAL DISTRIBUTOR OR CALL 1.800.834.4816
Elkay – www.elkay.com
Halsey Taylor – www.halseytaylor.com
References
- Berl's Commercial Supply | Water Fountains, Hand Dryers & Commercial Fixtures
- P65Warnings.ca.gov
- Patents | Zurn Industries LLC's products
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>