V8 Pikes Peak Twin Turbo Monster Installation Guide
- June 27, 2024
- PEAK
Table of Contents
V8 Pikes Peak Twin Turbo Monster
“`html
Product Specifications
- Manufacturer: Peak Products Corporation
- Fasteners Supplied:
- 12 mm Pan head self-drilling screw
- 19 mm Pan head self-drilling screw
- 19 mm Flat head screw
- 25 mm Flat head screw
- 38 mm Pan head screw
- 50 mm Coach screw with washer
- 80 mm Coach screw with washer
- 45 mm Connector bolt and nut
- 35 mm Hinge bolt assembly
Product Usage Instructions
Anchoring Fasteners for Australia
Deck Structure – POST BASE Typical Anchoring Fasteners
Fasteners Required: Minimum End and Edge Distance
- JD3 Timber e.g. Seasoned, Mixed Australia Hardwood
- 100 mm End of Joist: 50 mm Edge of Joist: 40 mm
Deck Structure – BASE RAIL SUPPORT Typical Anchoring
Fasteners
Fasteners Required: Minimum End and Edge Distance
-
JD3, J3, JD4, J4 Timber e.g. Seasoned/Unseasoned Mixed
Australian Hardwood, Mixed Softwood, Pine, Radiata, Australia -
2 x 10g x 38 mm Screw (provided with product)
-
34 mm End of Stud: 49 mm Edge of Stud: 25 mm
Deck Structure – WALL BRACKET Typical Anchoring Fasteners
Fasteners Required: Minimum End and Edge Distance
-
JD3, J3, JD4, J4 Timber e.g. Seasoned/Unseasoned Mixed
Australian Hardwood, Mixed Softwood, Pine, Radiata, Australia -
60 mm Concrete, Minimum strength 25 MPa
-
4 x RamsetTM WERCS AnkascrewTM or RamsetTM AnkascrewTM, M6 x 50
mm -
39 mm Minimum End and Edge Distance: End of Stud: 48 mm Edge of
Stud: 24 mm
Anchoring Fasteners for New Zealand
Deck Structure – POST BASE Typical Anchoring Fasteners
Fasteners Required: Minimum End and Edge Distance
-
J1 Timber – 60 mm End of Joist: 50 mm Edge of Joist: 40 mm
-
J2 Timber – 75 mm End of Joist: 50 mm Edge of Joist: 40 mm
-
J3 Timber – 100 mm End of Joist: 50 mm Edge of Joist: 40
mm -
J4 Timber e.g. Unseasoned, Pine, Radiata, Australia – 145 mm
End of Joist: 50 mm Edge of Joist: 40 mm -
J5 Timber e.g. Radiata Pine, Rimu, Douglas Fir, Larch – 215 mm
End of Joist: 50 mm Edge of Joist: 40 mm -
Concrete, Minimum strength 25 MPa – 4 x RamsetTM WERCS
AnkascrewTM or RamsetTM AnkascrewTM, M10 x 100 mm
Frequently Asked Questions (FAQ)
Q: What should I do if I encounter issues during
installation?
A: If you encounter any issues during installation, please
contact our customer support for assistance.
Q: Is there a warranty for this product?
A: Peak Products Corporation does not provide a warranty for
improper installation or use of the product. Please refer to the
Australian Consumer Law in Australia or the Consumer Guarantees Act
in New Zealand for further information.
“`
Installation Guide
Tools and Materials Needed
· Mitre saw (recommended) or hacksaw with non-ferrous metal cutting blade
· Spirit level · Measuring tape · Drill · Drill bits for timber: 10 mm · Drill
bits for metal: 3 mm, 5.5 mm
· Philips #1, #2, #3 driver bits · Socket or nutsetter:
8 mm, 17 mm · Adjustable spanner · Clamps · Painter’s masking tape · Dish soap
(for glass panels)
· Non-corrosive exterior silicone caulking
· Anchoring fasteners (see pages 3-4)
Fasteners Supplied
12 mm Pan head self-drilling screw
19 mm Pan head self-drilling screw
19 mm Flat head screw
25 mm Flat head screw
38 mm Pan head screw
50 mm Coach screw with washer
80 mm Coach screw with washer
45 mm Connector bolt and nut
35 mm Hinge bolt assembly
See our helpful installation videos on our website: peakbalustrade.com.au · peakbalustrade.com.nz
Dear Customer,
We’d like to take a moment to say “thank you and congratulations” for choosing
our products. At Peak® your satisfaction is very important to us. That is why
we work very hard to provide you with products of exceptional quality, value,
and beauty. And that is also why we want to hear from you.
Please contact us with your comments or suggestions at:
support@peakproducts.com.au · support@peakproducts.co.nz
Finally, we’d like to remind you to always work safely. Then, take pride,
relax with your family and experience years of enjoyment with Peak® products.
Peak Products Corporation
IMPORTANT INFORMATION
· Before beginning work, read this installation guide in its entirety including all warnings and important information.
· This installation guide is updated occasionally. Please refer to the latest version at https://peakproducts.com/en-au/peak-aluminium-balustrade /installation-videos-guides/ https://peakproducts.com/en-nz/peak-aluminium- balustrade/installation-videos-guide/
· Maximum post spacing: decks: 1.80 m stairs: 1.75 m
· For commercial use including multi-residential housing, please contact Peak
Customer Service at:
Australia: 1300 734 714 · support@peakproducts.com.au New Zealand: 0800 800
040 · support@peakproducts.co.nz
· Complies with: Australian/New Zealand Standard AS/NZS 1170.0:2002
Structural design actions Conditions apply. For details visit:
https://peakproducts.com/en-au/peak-aluminium-balustrade/compliance/
https://peakproducts.com/en-nz/peak-aluminium-balustrade/compliance/ Complete
Peak® Aluminium Balustrade system required.
· Always understand and comply with your local building codes.
· To prevent timber splitting and rot, drill pilot holes and coat fastener screw threads with non-corrosive exterior silicone caulking.
· Ensure that the opening between each of the following is less than 100 mm:
– balusters
– glass panels
– balusters and posts
– glass panels and posts
– balusters and walls
– glass panels and walls
– balusters and glass panels – base rail and deck surface
WARNING No representation or warranty is given that your particular
application of these products
complies with relevant building codes or that the fasteners provided or used
are appropriate for your application. Consult with professionals and local
building officials before beginning work: (i) to ensure compliance with
relevant building codes for your application and for your proposed use of
fasteners; (ii) to ensure the integrity of the structural components in
connection with which these products are to be used; (iii) to identify
appropriate safety gear that is to be used during installation such as a
safety harness when working above ground; (iv) to ensure that the work area is
free from utilities, services and hazards; and (v) to clarify any instructions
or warnings that may not be clear. Work in a safe manner wearing protective
gear such as gloves, eyewear, headwear, footwear and clothing. When using
tools comply with operation manuals and instructions. Metal and glass may have
sharp edges and could fragment or splinter during or as a result of handling
or cutting. Do not use these products in connection with any substance that is
or may be harmful or corrosive to the products. Inspect and maintain these
products and the structural components that they are used in connection with
on a regular basis, using professionals when appropriate.
Peak Products Corporation shall not be liable for any loss or damage resulting
from the improper installation or improper use of this product, subject to any
contrary provision of the Australian Consumer Law in Australia or the Consumer
Guarantees Act in New Zealand. Peak products and associated materials are
protected by patents, designs, copyrights and/or trademarks used under license
from Peak Innovations Inc.
II01PB_InstallGuide_V8
2
ANCHORING FASTENERS FOR AUSTRALIA
WARNING Engineering design has determined appropriate fasteners for the
attachment of the post base, wall bracket, and base rail support to concrete
or timber structures designed by others. While the types of material are
defined in the table below, the ability of the supporting structure to provide
adequate support to Peak® Aluminium Balustrade system and its fasteners must
be independently verified for each installation. To meet certain balustrade
load requirements within AS/NZS 1170.1:2002, use the fasteners specified in
the tables below. Building codes may vary. Always understand and comply with
your local building codes.
For further information visit: https://peakproducts.com/en-au/peak-aluminium-
balustrade/compliance/
Deck Structure
POST BASE Typical Anchoring Fasteners
Fasteners Required
Minimum Embedment¹
Minimum End and Edge Distance
JD3 Timber e.g. Seasoned, Mixed Australia Hardwood
4 x M10 Coach Screw²
100 mm
End of Joist: 50 mm Edge of Joist: 40 mm
J3 Timber e.g. Unseasoned, Mixed Australian Hardwood
JD4 Timber e.g. Seasoned, Mixed Softwood Species
J4 Timber e.g. Unseasoned, Pine, Radiata, Australia
Concrete, Minimum strength 25 MPa
4 x M10 Coach Screw²
4 x M10 Coach Screw²
4 x M10 Coach Screw² 4 x RamsetTM WERCS AnkascrewTM or RamsetTM AnkascrewTM,
M10 x 100 mm
125 mm 145 mm 185 mm 72 mm
End of Joist: 50 mm Edge of Joist: 40 mm
End of Joist: 50 mm Edge of Joist: 40 mm
End of Joist: 50 mm Edge of Joist: 40 mm
70 mm
BASE RAIL SUPPORT Typical Anchoring Fasteners
Deck Structure
Fasteners Required
Minimum Embedment¹
Minimum End and Edge Distance
JD3, J3, JD4, J4 Timber e.g. Seasoned/Unseasoned Mixed Australian Hardwood, Mixed Softwood, Pine, Radiata, Australia
2 x 10g x 38 mm Screw (provided with product)
34 mm
End of Stud: 49 mm Edge of Stud: 25 mm
Concrete, Minimum strength 25 MPa
2 x RamsetTM AnkascrewTM M5 x 30 mm
27 mm
40 mm
WALL BRACKET Typical Anchoring Fasteners
Deck Structure
Fasteners Required
Minimum Embedment¹
JD3, J3, JD4, J4 Timber e.g. Seasoned/Unseasoned Mixed Australian Hardwood, Mixed Softwood, Pine, Radiata, Australia
4 x 14g Type 17 Screw³ or 4 x M6 Coach Screw² (provided with product)
60 mm
Concrete, Minimum strength 25 MPa
4 x RamsetTM WERCS AnkascrewTM or RamsetTM AnkascrewTM, M6 x 50 mm
39 mm
Minimum End and Edge Distance
End of Stud: 48 mm Edge of Stud: 24 mm
50 mm
¹ Depth of the threaded portion of the screw into the innermost member. ²
Material of steel coach screws shall be given in AS/NZS 4291.1, for property
classes 4.6 and 4.8. ³ Material of 14g Type 17 screws shall be given in AS
3566.
3
ANCHORING FASTENERS FOR NEW ZEALAND
WARNING Engineering design has determined appropriate fasteners for the
attachment of the post base, wall bracket, and base rail support to concrete
or timber structures designed by others. While the types of material are
defined in the table below, the ability of the supporting structure to provide
adequate support to Peak® Aluminium Balustrade system and its fasteners must
be independently verified for each installation. To meet certain balustrade
load requirements within AS/NZS 1170.1:2002, use the fasteners specified in
the tables below. Building codes may vary. Always understand and comply with
your local building codes. For further information and more anchoring
recommendations, visit: https://peakproducts.com/en-nz/peak-aluminium-
balustrade/compliance/
POST BASE Typical Anchoring Fasteners
Deck Structure
Fasteners Required
Minimum
Minimum End and
Embedment¹
Edge Distance
J1 Timber
4 x M10 Coach Screw²
60 mm
End of Joist: 50 mm Edge of Joist: 40 mm
J2 Timber
4 x M10 Coach Screw²
75 mm
End of Joist: 50 mm Edge of Joist: 40 mm
J3 Timber
4 x M10 Coach Screw²
100 mm
End of Joist: 50 mm Edge of Joist: 40 mm
J4 Timber e.g. Unseasoned, Pine, Radiata, Australia
4 x M10 Coach Screw²
145 mm
End of Joist: 50 mm Edge of Joist: 40 mm
J5 Timber e.g. Radiata Pine, Rimu, Douglas Fir, Larch
4 x M10 Coach Screw²
215 mm
End of Joist: 50 mm Edge of Joist: 40 mm
Concrete, Minimum strength 25 MPa
4 x RamsetTM WERCS AnkascrewTM or RamsetTM AnkascrewTM, M10 x 100 mm
72 mm
70 mm
BASE RAIL SUPPORT Typical Anchoring Fasteners
Deck Structure
Fasteners Required
Minimum Embedment¹
Minimum End and Edge Distance
J1, J2, J3, J4, J5 Timber e.g. Seasoned/ Unseasoned, Pine, Radiata, Australia,
Rimu, Douglas Fir, Larch
2 x 10g x 38 mm Screw (provided with product)
34 mm
End of Stud: 49 mm Edge of Stud: 25 mm
Concrete, Minimum strength 25 MPa
2 x RamsetTM AnkascrewTM M5 x 30 mm
27 mm
40 mm
WALL BRACKET Typical Anchoring Fasteners
Deck Structure
Fasteners Required
Minimum Minimum End and
Embedment¹
Edge Distance
J1, J2, J3, J4, J5 Timber e.g. Seasoned/ Unseasoned, Pine, Radiata, Australia,
Rimu, Douglas Fir, Larch
4 x 14g Type 17 Screw³ or 4 x M6 Coach Screw² (provided with product)
40 mm
End of Stud: 60 mm Edge of Stud: 30 mm
Concrete, Minimum strength 25 MPa
4 x RamsetTM WERCS AnkascrewTM or RamsetTM AnkascrewTM, M6 x 50 mm
39 mm
50 mm
¹ Depth of the threaded portion of the screw into the innermost member. ²
Material of steel coach screws shall be given in AS/NZS 4291.1, for property
classes 4.6 and 4.8. ³ Material of 14g Type 17 screws shall be given in AS
3566.
4
WALL BRACKET INSTALLATION
This symbol indicates important information.
1
Measure and mark the position of all brackets on the wall.
Maximum wall bracket spacing of 1.80 m.
1005 mm
2
For timber attachment, secure hand and base rail brackets to wall using four M6 coach
screws with washers.
To prevent timber rot, coat fastener screw threads with non-corrosive exterior silicone caulking.
For concrete attachment, refer to pages 3-4 for anchoring fastener recommendations.
60 mm
3 Follow the Baluster, Glass Panel, or Sectional Glass installation process as
shown on pages 6-11.
HORIZONTAL ANGLE BRACKET INSTALLATION
This symbol indicates important information.
1
Measure and mark the hole positions of all brackets on the post.
Maximum post spacing of 1.80 m.
938 mm 46 mm
2
A: Drill 5.5 mm pilot holes at the marked locations.
A
B
B: Attach the hand and base rail
brackets to the post using four
25 mm flat head screws.
Then assemble the base rail bracket
using the connector bolt.
3 Follow the Baluster, Glass Panel, or
Sectional Glass installation process as shown on pages 6-11.
5
BALUSTER INSTALLATION
This symbol indicates important information.
For wall bracket or horizontal angle bracket installation, please see page 5.
1 Measure and mark the position of all posts and space equally.
Maximum post spacing of 1.80 m. Put the first post in position. For timber
attachment, secure post to deck using four M10 coach screws (refer to pages
3-4 for required length) through each corner of the post base. Ensure that the
post is plumb.
To prevent splitting of deck boards, drill four 10 mm holes through deck
boards (but not into deck structure). To prevent timber rot, coat fastener
screw threads with non-corrosive exterior silicon caulking. For concrete
attachment, refer to pages 3-4 for anchoring fastener recommendations.
2
Temporarily position the second post but do NOT secure it yet. Cut the hand and base rails and
plastic baluster gaskets to fit between the posts.
3
A: Install the base rail support into the bottom channel of the base rail.
A
To ensure that the balusters remain engaged in the rails, you must install one base rail support for each balustrade section.
B: Install all but the last four spacers into each rail.
A
4
Insert the rails (fitted with plastic baluster gaskets) into the first post. Then insert the
rails into the second post as a temporary
support but do not secure it yet.
A: Secure the handrail to the first post with
19 mm pan head self-drilling screws.
B: Secure the base rail to the first post with
19 mm pan head self-drilling screws.
B
C: Slide the first spacer in each rail against
the first post.
D: Insert a baluster into the base rail and
swing the top of the baluster into the
handrail. Repeat until you can no longer
swing balusters into position.
The opening between balusters, and
between a baluster and a post, must
C
not exceed 100 mm.
B D
6
5
A: Remove the second post to install the last few balusters and spacers.
B: Cut the last spacers flush with the ends
of the rails.
To ensure equal baluster spacing at each post, cut the first and the last spacers in the hand and base rails to equal lengths.
6
A: Insert the rails into the second post. B: Position and fasten the second post
in place, ensuring that the post is
plumb (see step 1 for full details).
B A
A B
7
A: Secure the handrail to the second post with 19 mm pan head self-
drilling screws.
B: Secure the base rail to the second
post with 19 mm pan head self-
drilling screws.
C: Slide the base rail support to the
centre position.
D: For timber attachment, fasten the
base rail support to the deck using
two 38 mm pan head screws.
For concrete attachment, refer to pages 3-4 for anchoring fastener recommendations.
To ensure that the balusters remain engaged in the rails, you must install one base rail support for each balustrade section.
C D
8 Repeat all steps for remaining sections.
Optional: Install post base covers.
A B
7
GLASS PANEL INSTALLATION
This symbol indicates important information.
Always use two people to handle glass panels. Always lift a glass panel by its
sides. Toughened glass is extremely fragile do not bump the edges. Always
use protective gear including eyewear and gloves when handling glass panels.
For wall bracket or horizontal angle bracket installation, please see page 5.
1 Measure and mark the position of all posts and space equally.
Maximum glass width of 1025 mm and maximum post spacing: 1.80 m for sections
with a glass panel and balusters. 1.20 m for sections with a glass panel only.
Put the first post in position. For timber attachment, secure post to deck
using four M10 coach screws (refer to pages 3-4 for required length) through
each corner of the post base. Ensure that the post is plumb.
To prevent splitting of deck boards, drill four 10 mm holes through deck
boards (but not into deck structure). To prevent timber rot, coat fastener
screw threads with non-corrosive exterior silicon caulking. For concrete
attachment, refer to pages 3-4 for anchoring fastener recommendations.
A
B
2
A: Remove the plastic baluster gaskets from both rails.
B: Temporarily position the second
post but do NOT secure it yet.
Cut the hand and base rails to
fit between the posts.
3
A: Cut the glass gaskets the same length as the rails.
A
B
B: Drill 3 mm holes into the base rail
glass gasket (the smaller gasket)
every 300 mm for water drainage.
4 A: Press the glass gaskets into the rails.
The smaller of the two glass
A
B
gaskets goes into the base rail.
B: Install the base rail support into the bottom channel of the base rail.
To ensure that the glass panel remains engaged in the rails, you must install
one base rail support for each balustrade section.
8
5
A: Insert the rails into the posts. B: Position and fasten the second post
A
in place, ensuring that the post is
B
plumb (see step 1 for full details).
C: Slide the base rail support to the
centre position.
D: For timber attachment, fasten the
base rail support to the deck using
two 38 mm pan head screws.
For concrete attachment, refer to pages 3-4 for anchoring fastener
C
recommendations.
To ensure the glass panel remains
engaged in the rails, you must
D
install one base rail support for
each balustrade section.
6
Secure the rails to both posts with 19 mm pan head self-drilling screws.
7 Install the glass panel by inserting it
into the handrail gasket then lowering it into the base rail gasket.
Ensure that the glass gaskets and the top and bottom edges of the glass panel
are well lubricated with liquid soap before installing the glass panel. Ensure
that the glass is fully seated in the gaskets. Wash away excess soap with
clean water. The opening between a glass panel and a post must not exceed 100
mm. Maximum of one glass panel between posts.
8 Repeat all steps for remaining sections.
Optional: Install post base covers.
9
SECTIONAL GLASS KIT INSTALLATION
This symbol indicates important information. Always lift a glass panel by its
sides. Toughened glass is extremely fragile do not bump the edges. Always
use protective gear including eyewear and gloves when handling glass panels.
For wall bracket or horizontal angle bracket installation, please see page 5.
1 Measure and mark the position of all posts and space equally.
Maximum post spacing of 1.80 m.
Put the first post in position. For timber attachment, secure post to deck
using four M10 coach screws (refer to pages 3-4 for required length) through
each corner of the post base. Ensure that the post is plumb.
To prevent splitting of deck boards, drill four 10 mm holes through deck
boards (but not into deck structure).
To prevent timber rot, coat fastener screw threads with non-corrosive exterior
silicon caulking.
For concrete attachment, refer to pages 3-4 for anchoring fastener
recommendations.
B
2
A: Remove the plastic baluster gaskets from both rails.
A
B: Temporarily position the second post
but do NOT secure it yet. Cut the hand
and base rails to fit between the posts.
This kit was designed to fit into a 1.80 m balustrade section. If your balustrade section is shorter than 1.80 m, you will need to cut the spacers or remove the glass panel(s) accordingly.
3
A: Install the base rail support into the bottom channel of the base rail.
A
B
To ensure that the glass panels remain engaged in the rails, you must install one base rail support for each balustrade section.
B: Install the first pair of spacers in the hand and base rails.
4
Insert the rails into the first post. Then insert the rails into the second post as a temporary
A
B
support but do not secure it yet.
A: Secure the handrail to the first post using
19 mm pan head self-drilling screws.
B: Secure the base rail to the first post with
19 mm pan head self-drilling screws.
C: Slide the first spacer in each rail against
the first post.
A
5
Remove the second post. A: Attach the glass fittings to the top and bottom
of each glass panel.
B: Slide a glass panel with fittings attached into the
rails until touching the first pair of spacers. Then
slide the second pair of spacers into the hand
and base rails. Repeat to complete the section.
The opening between glass panels, and between a glass panel and a post, must not exceed 100 mm.
C B
10
6
Cut the last spacers flush with the ends of the rails.
To ensure equal glass panel spacing at each post, cut the first and the last spacers in the hand and base rails to equal lengths.
7
A: Insert the rails into the second post. B: Position and fasten the second post in
place, ensuring that the post is plumb
(see step 1 for full details).
A B
8
A: Secure the handrail to the second post with 19 mm pan
head self-drilling screws.
B: Secure the base rail to the
second post with 19 mm pan
head self-drilling screws.
C: Slide the base rail support to
the centre position.
D: For timber attachment, fasten
the base rail support to the
deck using two 38 mm pan
head screws. C
For concrete attachment,
refer to pages 3-4 for
anchoring fastener recommendations.
D
To ensure that the glass panels remain engaged in the rails, you must install one base rail support for each balustrade section.
9 Repeat all steps for remaining sections.
Optional: Install post base covers.
A B
11
STAIR BALUSTER INSTALLATION
This symbol indicates important information.
1 Measure and mark the position of all posts and space equally.
Maximum post spacing of 1.75 m. Put the first post in position. For timber
attachment, secure post to deck using four M10 coach screws (refer to pages
3-4 for required length) through each corner of the post base. Ensure that the
post is plumb.
To prevent splitting of deck boards, drill four 10 mm holes through deck
boards (but not into deck structure). To prevent timber rot, coat fastener
screw threads with non-corrosive exterior silicon caulking. For concrete
attachment, refer to pages 3-4 for anchoring fastener recommendations.
2 A: Remove the screw covers from
the rails.
B: Insert a baluster through the
A
B
first and last square slots at each
end of the base rail (ensure
the screw holes in the rails and
balusters are facing up). Align
the screw hole in each baluster
with the screw hole in the base
rail, then fasten each baluster to
the rail using 12 mm pan head
self-drilling screws.
3
Insert the balusters into each end of the handrail (ensure the screw holes in
the rail are facing up). Align the screw
hole in each baluster with the screw
hole in the handrail, then fasten each
baluster to the rail using 12 mm pan
head self-drilling screws.
4
A: Insert the next baluster through the square slot in the base rail.
A
B
B: Insert baluster into the handrail
and align the screw holes with
the screw holes in the rails. Fasten
baluster to the rails using 12 mm
pan head self-drilling screws.
Repeat to complete the panel.
5 A: Install the handrail screw cover.
A
B
B: Install the base rail screw cover.
Secure the screw covers to the rails with painter’s masking tape to prevent them from sliding during the remainder of the installation.
12
6
Put the balustrade panel and bottom post into position and clamp the posts and rails
together but do not secure the bottom post
yet. Ensure equal baluster spacing at each
post, and that the bottom post is plumb. To
allow space for the brackets, mark a vertical
line 10 mm away from each post and cut
the rails along the marked line.
Always understand and comply with your local building codes for stair rail height, size of openings under the base rail, between balusters, and between a baluster and a post.
10 mm
10 mm 10 mm
7
A: Reposition the balustrade panel in between the posts at the required
height above the noses of the treads.
Place and mark positions of each
base rail bracket. Then remove the
panel in order to mark hole positions
for each bracket on the posts.
B: Drill 5.5 mm pilot holes through
the post at the marked positions.
C: Fasten the base rail brackets to
the posts, using four 25 mm flat
head screws.
D: Position and fasten the bottom
post in place, ensuring that the
post is plumb (see step 1 for
full details).
A
B
D
C
8
A: Temporarily position the balustrade panel in the base
rail brackets and mark the
position of the bracket and
hole positions of each
handrail bracket on the posts.
B: Drill 5.5 mm pilot holes
through the post at the
marked positions.
C: Fasten the handrail
brackets to the posts,
using four 25 mm flat
head screws.
A
B
C
9
A: Reposition the balustrade panel, then drill 3 mm pilot holes through
A
B
C
the rails at the screw positions.
B: Attach the balustrade panel to the
brackets and secure with 19 mm
flat head screws.
C: Slide a screw cover over each
bracket.
10 Repeat all steps for remaining sections.
Optional: Install post base covers.
13
GATE INSTALLATION
B This symbol indicates important information.
Before beginning work, measure and ensure the Gate Opening (W) does not exceed
1150 mm. Then please carefully follow the steps below to ensure the gate is
not cut too short for your project.
1
A: Remove latch side of gate frame.
A
B: With latch side of
gate frame removed,
cut top and bottom
gate rails 190 mm
shorter than gate
opening W.
W (1150 mm max.) W minus 190 mm
2
Attach the latch side of the gate frame using
the 19 mm pan head
self-drilling screws.
A
3
A: Align the top of the gate with the top of the post and mark the hole
positions for the hinges on the post.
B: Drill 5.5 mm pilot holes at the
marked positions.
C: Install the top 50 mm coach screw
on each hinge.
D: Install the bottom 50 mm coach
C
screw on each hinge by releasing
the bolt and nut (HINT: do not
completely disassemble hinge).
4
Use 19 mm pan head self drilling screws for these steps:
A
A: Secure the retainer to
the gate at the marked
position.
B: Insert the latch through
the retainer.
C: Secure the latch to the
gate at the marked
position.
B
D: Check and mark the
position for the latch
plate on the post.
Secure the latch plate to
the post.
14
B D
D C