EAGLE PEAK GHPC36V2-GRN-AZ Outdoor Walk-in Hobby Greenhouse Instruction Manual

October 30, 2023
EAGLE PEAK

GHPC36V2-GRN-AZ Outdoor Walk-in Hobby Greenhouse

Product Information

The Eagle Peak PC Greenhouse is a 6 ft x 6 ft x 7 ft structure
designed for outdoor use. It comes with a base assembly, corner
stakes, and other hardware required for setup. The greenhouse is
made of durable materials that can withstand various weather
conditions. This product is not suitable for indoor use.

Product Usage Instructions

Important Safety Instructions

  • Read all safety instructions before assembling and using the
    greenhouse.

  • Check with your local governing authority/local municipal codes
    regarding installation of structures before assembly.

  • Do not place the product underneath or near electrical
    lines.

  • Keep children away during assembly.

  • This product contains small parts which can be swallowed by
    children.

  • Keep fingers away from the places where they can be
    pinched.

  • Do not attempt to assemble the greenhouse if any parts are
    missing.

Assembly Instructions

Assemble the foundation frame using (4) 27-1 Beams, (4) 28
Corner Brackets, (4) 29 Base Hooks, and (16) 3 Screws, Nuts and
Washers. Use (4) 30 Corner Stakes if the greenhouse will be
anchored directly to the ground. Follow these steps:

Step 1: Base Assembly

  1. Place the four 27-1 beams on the ground in a square shape.

  2. Attach the four 28 corner brackets to the beams using screws,
    nuts, and washers.

  3. Attach the four 29 base hooks to the beams using screws, nuts,
    and washers.

  4. Secure the beams together using screws, nuts, and washers.

  5. If the greenhouse will be anchored to the ground, use the four
    30 corner stakes to secure the foundation frame into the soil.

Step 2: Assembly on Ground

  1. Excavate the site by removing the top 3 inches of grass or soil
    and level the base, allowing a 6-inch perimeter around the
    foundation.

  2. Place the foundation frame onto the leveled base.

Step 3: Assembly on Wood or Concrete Pad

  1. Place the foundation frame onto the wood or concrete pad.

After completing the base assembly, follow the remaining
instructions in the user manual to complete the greenhouse
assembly.

INSTRUCTION MANUAL
EAGLE PEAK PC GREENHOUSE 6 FT x 6 FT x 7 FT
Thank you for choosing Eagle Peak !

CONTENTS
1. lmportant Read Before Assermbly ……………………………………………………………………………………………………………….. 1 2. Dimensions & Specifications ………………………………………………………………………………………………………………………… 3 3. Part List …………………………………………………………………………………………………………………………………………………………. 4 4. Base Assembly ………………………………………………………………………………………………………………………………………………. 7 5. Vent Assembly …………………………………………………………………………………………………………………………………………….. 10 6. Door Assembly ……………………………………………………………………………………………………………………………………………. 13 7. Front Wall Assembly ………………………………………………………………………………………………………………………………….. 16 8. Door Slider Assembly …………………………………………………………………………………………………………………………………. 19 9. Side Wall Assembly ……………………………………………………………………………………………………………………………………… 22 10. Back Wall Assembly …………………………………………………………………………………………………………………………………. 25 11. Roof Frame Assembly ………………………………………………………………………………………………………………………………. 32 12. Panel Supports Assembly ………………………………………………………………………………………………………………………… 35 13. PC Panels Installation ………………………………………………………………………………………………………………………………. 38 14. Rainwater Collection System …………………………………………………………………………………………………………………… 44 15. Anchor the Base ……………………………………………………………………………………………………………………………………….. 47 16. Open and Close The Vents ……………………………………………………………………………………………………………………….. 48 17. Additional Strength ………………………………………………………………………………………………………………………………….. 49

IMPORTANT

Warning! To reduce the risk of serious injury, read the following safety instructions before assembling and using the greenhouse. Please check with your local governing authority/local municipal codes regarding installation of structures before assembly.

Caution!

Proper placement of your greenhouse is essential. Do not place the product underneath or near electrical lines. Keep children away during assembly. This product contains small parts which can be swallowed by children. Keep fingers away from the places where they can be pinched. Do not attempt to assemble the greenhouse if any parts are missing.

· The product smust be installed on flat and level horizontal surface. · Ensure enough clearance around the product. Before assembling the product, find level ground no less than 6′(1.8m) away from any structures or obstructions, such as fences, garages, houses, overhanging branches, laundry lines, or electrical wires. · This greenhouse is not to be regarded as part of a building/house structure. The greenhouse must be anchored securely to the ground or mounting surface. It is best to build the greenhouse on a hard, stable foundation. Appropriate screws or concrete anchors (not provided) must be used to anchor the greenhouse to the surface. Anchor stakes are provided for use on compacted soil or crushed stone. · The greenhouse may require two or more people to install safely. · Check for underground utilities before digging or driving stakes into the ground. · During installation, follow all safety warnings provided with your tools and use safety glasses. · If you set up more than one greenhouse, keep a minimum distance of 10′(3m) between the greenhouses. · Any assembly or maintenance of the product must be carried out by adults only. · Arrange necessary manpower when assembling or moving the product. · Some parts may contain sharp edges. Wear protective gloves if necessary. · Keep children and pets away while setting up the greenhouse. · Check all nuts and bolts periodically to ensure bolts/nuts are tightened. · Repairing and replacing parts should be done by a qualified person. · Do not light any fire inside or near the product! · Do not hang heavy weights on the roof frame. · Do not climb onto the roof of the greenhouse. Falling off or through the greenhouse can result in serious injury.

1

IMPORTANT
· Please read and understand this manual before any assembly. Before beginning assembly of the product, make sure all parts are present. Compare parts with packaging contents list. · Place all parts from the box in a cleared area and organize them for assembly. · Remove all packing materials and place them back into the box. Do not dispose of the packing materials until assembly is completed. · DO NOT tighten the screws before PC panel assembly in order to ensure all the parts fit with each other.
· The holes in the aluminum greenhouse are oval. If necessary, all parts of the greenhouse can be moved and adjusted before installation complete. · It will take 6-8 hours to set up the greenhouse with 2-3 people. Please leave ample time to do the assembly, and do not stop once assembly has begun. A partially assembled greenhouse frame may be damaged or destroyed due to bad weather. · Read each step carefully before beginning any assembly and make sure you understand each step. If any part is missing, or if you have any questions, please contact the customer service service@eaglepeak.com.
· Needed for assembly: (The following tools are NOT included)

Drill

Slotted Screwdriver

Tape Measure

Goggles

2 – 3 people 2

Pliers Ladder

Dimensions & Specifications

518.9cfmt 6.129f0t cm

260.78cfmt

190

cm 6.2

ft

3

Part List

Item NO.

Sketch

Size

Qty

Item NO.

Sketch

Size

Qty

Item NO.

Sketch

Size

Qty

1A

1215mm 4X

7A

1830mm 2X

18B

595mm 2X

47.8in

72.0in

23.4in

1B

1130mm 1X

7B

44.5in

1300mm 51.2in

4X

19B

520mm 20.5in

4X

1C

1130mm 1X

7C

44.5in

594mm 2X

20B

23.4in

595mm 2X 23.4in

1D

1130mm 1X

7D

44.5in

1300mm

51.2in 2X

21A

603mm 5X 23.7in

1E

1130mm

44.5in 1X

7K

625mm 12X 24.6in

2A

1640mm 1X

8A

1840mm 2X

64.5in

72.4in

2B

1640mm 64.5in

1X

3A

1665mm 1X

9A

1830mm 1X

65.5in

72.0in

3B

1665mm 65.5in

1X

10A

635mm 2X 25.0in

3C

1215mm 4X

11A

625mm 1X

47.8in

24.6in

3D

1115mm

43.9in 4X

12A

610mm 24.0in 1X

4A

1830mm 2X

13A

1250mm 1X

72.0in

49.2in

4B

1830mm 72.0in

1X

14A

380mm 1X 15.0in

15A

1600mm 2X

63.0in

5A

1830mm

72.0in 1X

16A

625mm 2X 24.6in

6A

619mm 1X

17A

625mm 1X

24.4in

24.6in

4

Part List

Item NO.

Sketch

2

Size mm

Qty

1X

Item NO.

Sketch

18

Size Qty

Item NO.

Sketch

2X

Size

Qty

3

M6*40 17X

19

4X

4

2X

24

6X

5

M6*10 143X

25

4X

6

M3*20 16X

26

4X

7

M3*10 12X

27-1

1300mm 4X

51.2in

8

4X

9

2X

28

4X

10

2X

29

12X

11

1X

30

4X

13

2X

31

12X

14

178X

33

4X

15

4X

35

143X

16

8X

36

4X

17

62X

37

4X

38

4X

5

Part List

Item NO.

Sketch

Size Qty

Item NO.

Sketch

Size Qty

A4

603x1210mm 11X

B4

603x1120mm 4X

23.75×47.63in

23.75×44.09in

D4

603x590mm 2X

E4

595x550mm 2X

23.75×23.22in

23.42×21.65in

F4

603x655mm 1X

G4

23.75×25.78in

620x240mm 24.40×9.45in

1X

H4

620x230mm 1X

I4

24.40×9.05in

620x600mm 24.40×26.62in

2X

X4

603x440mm 23.75×17.32in

4X

6

Step 1

Base Assembly

Parts required for this step

27-1

1830 4X

28

4X

30

4X

31

8X

Needed in the grass

Needed in the grass

3

M6*40 16X 29

4X

4

2X

IMPORTANT: The ground, wooden deck, or concrete surface must be firm and level for maximum stability and durability. If not, the PC board may not be properly secured in the provided guide rail and may be blown out by strong wind. The greenhouse must be securely anchored by placing the foundation frame into the ground and securing with stakes, or by fixing it to a wooden deck or concrete surface. (See Step 1.1 – Step 1.5 for details.) Failure to properly secure or anchor the greenhouse will void the warranty.

7

Step 1

Base Assembly, cont’d 3

1.1 1.2

1.4

27-1

30

1.3

1.4

31

1.3

27-1

1.1

1.2

31

27-1

1.1 1.2 31

6.129f0t cm
1.1 1.2

27-1

190

cm 6.2

ft

1.1

28 29

1.2 Corner Stakes are needed to set up in soil (Status 1) 30

27-1

27-1

27-1

27-1

28 3

Assemble the foundation frame using (4) 27-1 Beams, (4) 28 Corner Brackets, (4) 29 Base Hooks, and (16) 3 Screws, Nuts and Washers. Use (4) 30 Corner Stakes, as shown in Step 1.2. if the greenhouse will be anchored directly to the ground.

8

Step 1

Base Assembly, cont’d

Assembly on Ground

1.3

30

1.4

Excavate the site by removing the top 3 in of grass or soil and leveling the base, allowing a 6 in perimeter around the foundation.

Assembly on Wood

or Concrete Pad

1.5

Build a level wood or concrete pad that is slightly wider and longer than the green house. DO NOT use Part 30 and 31 if set up on wooden deck or concrete ground.

Wooden Deck or
Concrete Ground

27-1 31
Base

9

Step 2

Vent Window Assembly

Parts required for this step

18B

595 2X 19B

520 4X

20B

595 2X

13

2X

E4

595*550 2X

5

M6*10 8X

7

M3*10 4X

4

2X

100

Step 2

Vent Window Assembly, cont’d 5

20B 2.1
19B

2.1 19B

E4
2.4 18B 2.2 2.3

2.2 2.3
13

11

Step 2 Repeat 2X
2.1

Vent Window Assembly, cont’d

Assemble (2) Frame piece 19B to (1) Frame piece 20B

using (3) Screw Set 5. Do not tighten screws at this

5

time.

20B 19B

20B

2.2

19B

19B

E4

Slide Window E4 into the window frame.

18B

2.3

2.4

19B

5

E4

E4

13 7

18B

18B

Secure the vent window handle 13 to the window frame using (2) screw 7.

12

Step 3

Door Assembly

Parts required for this step

11A

625 1X 12A

15A

1600 2X 16A

17A

625 1X

5

6

M3*20 16X

4

610 1X 625 2X M6*10 2X
2X

13

Step 3

Door Assembly, cont’d 5

3.1 15A
3.2 3.2

3.1

12A

11A

15A

3.2 16A
3.2 16A

3.3

3.3

17A

Door pre-assembly for future step. PC Panels are not needed at this time.

14

Step 3
3.1

Door Assembly, cont’d

Assemble Part 12A to Part 11A using (2) Screw, Washer and Nut 5.

11A 5

Assemble Part 12A/11A to (2) Vertical Door Frames

12A 3.2
16A 3.3
17A

6 15A
Assemble Part 16A to (2) Vertical Door Frames 15A using (4) Screws 6. Repeat with second Part 16A as shown on Page 15A
6 Assemble Part 17A to (2) Vertical Door Frames 15A using (4) Screws 6.
15A
6
15

Step 4

Front Wall Assembly

Parts required for this step

1A

1215 2X

1B

1130 1X

1C

1130 1X

2A

1640 1X

2B

1640 1X

5A

1830 1X

6A

619 1X

7C

594 2X

7D

1300 2X

26

2X

5

M6*10 18X

4

2X

16

Step 4

Front Wall Assembly, cont’d 5

4.4 1A

1C

4.6

6A

4.6 1B

26 7C 7D

4.5

4.5

2B

2A

26 7C 7D

4.3 1A

5A

4.1

4.1

4.2

4.2

Front Wall pre-assembly for future step. PC Panels are not needed at this time. 17

Step 4
4.1

Front Wall Assembly, cont’d
4.2 1A

2A/2B

5
5A
Assemble Corner Support 1A to Bottom Frame 5A using (1) Screw, Washer, Nut 5. Repeat at opposite end.

4.3

1B

26

5

7D 5A

Assemble Part 7D to Vertical Frames 2B using (1) Screw, Washer, Nut 5. Repeat with 2A.

4.4

1C

5

26

1A 7C
7D
Assemble Parts 7C, 7D, 1A and 1B to Corner Bracket 26 using (4) Screw, Washer, Nut 5.
4.5

1A 7C
7D
Assemble Parts 7C, 7D, 1A and 1C to Corner Bracket 26 using (4) Screw, Washer, Nut 5.

4.6

1B/1C

7C

2A/2B

5

5

6A 2A/2B

Attach end of Part 7C to (2) Vertical Supports 2A and 2B using (2) Screw, Washer, Nut 5.

Assemble Horizontal Beam 6A to (2) Vertical Supports 2A and 2B and Roof Beams 1B and 1C using (4) Screw, Washer, Nut 5.

18

Step 5

Attach the Door

Parts required for this step

13A

1250 1X

14A

2

1X

11

3

M6*40 1X

5

4

2X

380 1X 1X
M6*10 4X

19

Step 5

Attach the Door, cont’d

3

5

13A 1B 5.1

5.3

5.2

14A

2

5.4

1C 5.5

20

Step 5

Attach the Door, cont’d

5.1 5

5.2

1B

13A

13A

Slide (3) Screw 5 into the channel on upper Door Channel 13A.

5 6A 5
Attach Door Channel 13A to parts 6A and 1B using two of the three Screw 5.

5.3 13A

5.4 1B

14A 5
Attach the top of Vertical Support 14A to the end of 13A using the remaining Screw 5.
5.5 13A
11

3 2 14A
Attach the bottom of Vertical Support 14A to Roof Beam 1B using Screw 3. Make sure to use Spacer 2 as shown.

5
Slide the Door Frame assembly onto the Front Panel Assembly. Install the stop Screw 5 and End Cap 11.
21

Step 6

Side Wall Assembly

Parts required for this step

3C

1215 4X

4A

1830 2X

7B

1300 4X

8A

1840 2X

5

M6*10 28X

4

2X

22

Step 6

Side Wall Assembly, cont’d 5

6.2

8A

6.4

7B 6.6

6.4 6.2
7B 6.6
3C

3C

6.1

6.3

6.5 4A

6.1

6.3

6.2

8A 6.4

7B 6.6

6.4 6.2
7B 6.6
3C

3C

6.1

6.3

4A

6.5

6.1 6.3

23

Step 6

Side Wall Assembly, cont’d

6.1 5

6.2 8A

3C
Slide (5) Screw 5 into the channel of Vertical Wall Support 3C. Repeat 3X.
6.3

5
3C
Attach the top of Vertical Wall Support 3C to Horizontal Beam 8A using the Screw 5 nearest the end of part 3C. Repeat 3X.
6.4

3C
4A
5 Attach the bottom of Vertical Wall Support 3C to Horizontal Beam 4A using the Screw 5 nearest the end of part 3C. Repeat 3X.
6.5

8A 5
7B Attach the top of Diagonal Brace 7B to Horizontal Beam 8A. Repeat 3X.
6.6

7B 4A
5

7B 5
3C

Attach the bottom of Diagonal Brace 7B to Horizontal Beam 4A. Repeat 3X.
24

Attach the middle of Diagonal Brace 7B to Vertical Support 3C using the middle Screw 5. Repeat 3X.

Step 7

Back Wall Assembly

Parts required for this step

1A

1215 2X

1E

1130 1X

1D

1130 1X

3A

1665 1X

3B

1665 1X

4B

1830 1X

7A

1830 1X

26

2X

5

M6*10 18X

4

2X

25

Step 7

Back Wall Assembly, cont’d 5

7.5

1E

7.1

7.1 7.5 1D

7.4 26

7.6 7A

1A

3A

7.6

7.4

26

3B

1A

4B

7.2

7.2

7.3

7.3

Set up the back panel for further step. Please note that no PC panel is required in this step. 26

Step 7
7.1

Back Wall Assembly, cont’d

5 3A/3B

7.2 1A
5 4B

Slide (5) Screw 5 into the channel of Vertical Wall Support 3A and 3B.
7.3 3A/3B

Attach Corner Vertical Support 1A to Horizontal Beam 4B using (1) Screw Set 5. Repeat on opposite end with remaining Vertical Support 1A.

7.4

1D/1E

26

5

4B

5

7A

1A

Attach Vertical Supports 3A and 3B to Horizontal Beam 4B using the lowest Screw 5 inserted in step 7.1.
7.5 5
1D/1E
3A/3B

Attach Diagonal Roof Beams 1D and 1E and Horizontal Beam 7A to both Vertical Supports 1A using Bracket 26 and (4) Screw 5 Sets as shown.
7.6 3A/3B
7A
5

Attach the top of Vertical Supports 3A
and 3B to Diagonal Beams 1D and 1E using
the top Screw 5 from Step 7.1. 27

Attach Horizontal Beam 7A to Vertical Supports 3A and 3B using the (2) Screw 5 that are second from the top.

Step 8

19

4X

8.1 8.1
8.1 8.1

8.1

1B/1C

1D/1E

Insert Plug 19 into the ends of Diagonal

19

Roof Braces 1B, 1C, 1D, and 1E.

28

Step 9

Joining the Walls

Parts required for this step

29

8X

9A

5

M6*10 14X

4

1830 1X
2X

5

9A

9.7

9.7

9.2 9.3

9.6 9.1 9.5

9.4
9.1 9.5 9. 4 9. 4

29

Step 9
9.1
4A

Joining the Walls, cont’d

Place the Right Wall Assembly and Back wall Assembly on the Foundation Assembly with the help of an assistant.

1A

Attach the bottom of Vertical Support 1A to

the end of Bottom Horizontal Beam 4A using

(1) Screw 5 Set.

Attach Horizontal Beam 8A to Vertical Support

5

1A and Diagonal Roof Beam 1D using (2) Screw

5 Sets.

Repeat with Left Wall Assembly.

9.2 1D/1E 5
8A 1A

1D/1E 8A

9.3 1B/1C
5
8A

8A 1A

1B/1C

Place the Front Wall Assembly on the Foundation Assembly. Attach the bottom of Vertical Support 1A to the end of Bottom Horizontal Beam 4A using (1) Screw 5 Set per side. Attach Horizontal Beam 8A to Vertical Support 1A and Diagonal Roof Beams 1B and C using (2) Screw 5 Sets per side.
30

Step 9
9.4

Joining the Walls, cont’d

3A/3B/3C

9.5 1A
5A

29 5

5 29 27-1

Secure Back wall Assembly and Sidewall Assemblies to the Foundation Assembly by removing the required nuts and washers, installing (6) Clip 29, and replacing the nuts and washers as shown.

Remove the nut and washer from the lower corner, install Clip 29 to attach the corner of the frame to the foundation. Repeat on all lower corners.

9.6

2A/2B

9.7

1C/1E

1B/1D

5
29 27-1 Secure the Front Wall Assembly to the Foundation by removing the nut and washer at the bottom of Diagonal Brace 7, 2A and 2B. Install (2) Clip 29 and reinstall the washers and nuts.

5 9A
Attach Roof Ridge Beam 9A to Diagonal Roof Beams 1B, 1C, 1D, and 1E using (4) Screw 5 sets.

31

Step 10

Installing the Roof Rafters

Parts required for this step

3D

1115 4X

24

6X

5

M6*10 24X

4

1X

32

Step 10

Installing the Roof Rafters, cont’d 5

Slide

9A
Slide the two Vent Panel assemblies into the channel on Ridge Beam 9A as shown.

9A 10 .3 10 .4 3D 3D
24 24

9A
10 .1 10 .2 10 .5

33

Step 10
10.1

Installing the Roof Rafters, cont’d

10.2

3D

5 8A

3D

5

Slide (6) Screw 5 into the channel on (4) Roof Rafter 3D.

10.3

9A

10.4

3D

Attach the lower end of Roof Rafter 3D to Sidewall Horizonal Beam 8A using the lowermost Screw 5. Repeat 3X.
3D

5 3D
Attach the top end of Roof Rafter 3D to Roof Ridge Beam 9A using the uppermost Screw 5. Repeat 3X.

5 5 24
Attach Roof Brace 24 to Roof Rafter 3D using the second Screw 5. Repeat 1X.

10.5

3D

5

24 3C
5
Attach Roof Brace 24 to Sidewall Vertical Support 3C using the next lowest Screw 5 on Roof Rafter 3D and the second Screw 5 on 3C. Repeat 3X.
34

Step 11

Installing the Panel Supports

Parts required for this step

7A

1830 1X

7K

625 12X

10A

635 2X

25

4X

7

M3*10 8X

5

M6*10 10X

4

1X

35

Step 11

Installing the Panel Supports, cont’d 5

11.1 11.2
7K
7K

10A

7A

7K

7K

3D

7K

7K

11.3

7K

11.3
11.5 11.7

11.5

11.4

11.6

11.1

11.2

3D

25

10A

7

25 7
Install (2) T Braces 25 on Vent Support 10A using (4) Screw 7. Repeat 1X.

36

10A 5
Attach Vent Support 10A to Roof Rafters 3D using (2) Screw 5. Repeat on opposite side. Align with lower edge of the Vent Panels and tighten.

Step 11

Installing the Panel Supports, cont’d

11.3
1B/1C 1D/1E
7K

11.4 7K
5
5 7K 3D

Attach (3) Horizontal Panel Supports 7K to Diagonal Roof Beam 1B, 1D and Roof Rafters 3D using (4) Screw 5. Repeat on opposite side.

11.5 7K 1A

11.6
5 7K

7K
5 3C

Attach (3) Horizontal Panel Supports 7K to Vertical Wall Supports 1A and 3C using (4) Screw 5. Repeat on opposite side.

11.7

5

7A

1A

Attach (3) Horizontal Panel Supports 7A to Vertical Wall Supports 1A, 3A, and 3B using (4) Screw 5.

37

Set up the PC Panels Parts required for this step

A4

603*1210 11X

B4

D4

603*590 2X

F4

G4

620*240 1X

H4

I4

620*600 2X

X4

14

178 21A

17

62

6031120 4X 603655 1X 620230 1X 603440 4X
603 5X

38

PC Panels

Rear

A4

A4

A4

A4

B4

B4

A4

X4

F4

X4

A4

D4 E4

E4 D4

A4

A4
Side

B4
Roof

H4

X4

X4

I4

G4

A4

A4

I4

B4
Roof

A4
Side

Front
Notes: 1. Peel approximately 2 inches of film from all sheet edges before installing. Remove all film
immediately after the constructions completed. 2. The UV-protected side of the sheet is covered with opal white film and must face towards the
sun.

POLYCARBONATE PANEL
SUN
Opal white film

PC sheet

Transparent film

Two sides of PC sheet are covered with thin film, one side’s film is transparent, opposite side’s film is opal white. The UV-protected side of the sheet is covered with opal white film and must face towards the sun.

39

Step 12

Installing the PC Panels

Use of a ladder may be necessary to reach the top of the greenhouse.

The sides of the panels are secured using the Spring Clips 14. To place the clips insert one end into the frame channel. Then, capture the panel in the center of the clip as shown below. Lastly, insert the remaining end of the clip into the channel.

The ends of the panels are secured to the frame using Clip 17 as shown. Use (2) clips per short side.

Ladder

14 17

40

Step 12

Installing the PC Panels, cont’d

12.7

X4 21A

B4 H4
I 4

A4 G4
I 4

21A

X4

21A

F4

21A

E4

X4

12.4

A4

A4

B4

A4

D4 B4

X4 21A
A4

A4 A4 A4

12.3 12.2

12.5

12.1

12.6

14

41

Step 12
12.1
21A 14

Installing the PC Panels, cont’d
12.2 X4
X4
21A A4
A4 14

5A

17

4B

17

12.3 F4

21A
14 17

A4 4B

42

Step 12
12.4 9A
10A
D4

Installing the PC Panels, cont’d
12.5

14 B4

I4

16A

16A G4

17

8A

17

14

I4 17A

12.6 17

A4 14

12.7

1C

14

1B

H4

17 17
6A

43

Step 13

Installing the Accessories

Parts required for this step

8

4X

9

2X

10

2X

15

4X

16

8X

18

2X

33

4X

35

143

44

Step 13

Installing the Accessories, cont’d

13.1

13.3

13.3 13.2

13.4 13.2

13.4

13.1

45

Step 13
13.1 10 8
16

13.2

8A

8A

ATTENTION You may need a slotted screwdriver when you are assembling plug 10 & 9

1A

1A

9 8
16

15 13.3
9A
18

15 13.4

35

33

35

3D

Rotate

46

Anchor the Base

36 38 37
A drill will be needed to anchor the greenhouse to concrete.
27-1

A drill will needed to anchor

the greenhouse to wooden deck.

36

36

38

27-1

38

Concrete Ground
37
47

Wooden Deck

Open and Close The Vents
Attention: Make sure the vent is in the correct position before closing it. 13

I

II

III

IV

48

Additional Strength
Advice You can also glue the polycarbonate panel to the aluminum frame to enhance the stability using silicone sealant.
Note Silicone sealant and caulking gun are not included in our tool kit. You can buy them locally. Only use the silicone sealant suitable for aluminum.
49

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

EAGLE PEAK User Manuals

Related Manuals