EAGLE PEAK GHPC36V2-GRN-AZ Outdoor Walk-in Hobby Greenhouse Instruction Manual
- October 30, 2023
- EAGLE PEAK
Table of Contents
GHPC36V2-GRN-AZ Outdoor Walk-in Hobby Greenhouse
Product Information
The Eagle Peak PC Greenhouse is a 6 ft x 6 ft x 7 ft structure
designed for outdoor use. It comes with a base assembly, corner
stakes, and other hardware required for setup. The greenhouse is
made of durable materials that can withstand various weather
conditions. This product is not suitable for indoor use.
Product Usage Instructions
Important Safety Instructions
-
Read all safety instructions before assembling and using the
greenhouse. -
Check with your local governing authority/local municipal codes
regarding installation of structures before assembly. -
Do not place the product underneath or near electrical
lines. -
Keep children away during assembly.
-
This product contains small parts which can be swallowed by
children. -
Keep fingers away from the places where they can be
pinched. -
Do not attempt to assemble the greenhouse if any parts are
missing.
Assembly Instructions
Assemble the foundation frame using (4) 27-1 Beams, (4) 28
Corner Brackets, (4) 29 Base Hooks, and (16) 3 Screws, Nuts and
Washers. Use (4) 30 Corner Stakes if the greenhouse will be
anchored directly to the ground. Follow these steps:
Step 1: Base Assembly
-
Place the four 27-1 beams on the ground in a square shape.
-
Attach the four 28 corner brackets to the beams using screws,
nuts, and washers. -
Attach the four 29 base hooks to the beams using screws, nuts,
and washers. -
Secure the beams together using screws, nuts, and washers.
-
If the greenhouse will be anchored to the ground, use the four
30 corner stakes to secure the foundation frame into the soil.
Step 2: Assembly on Ground
-
Excavate the site by removing the top 3 inches of grass or soil
and level the base, allowing a 6-inch perimeter around the
foundation. -
Place the foundation frame onto the leveled base.
Step 3: Assembly on Wood or Concrete Pad
- Place the foundation frame onto the wood or concrete pad.
After completing the base assembly, follow the remaining
instructions in the user manual to complete the greenhouse
assembly.
INSTRUCTION MANUAL
EAGLE PEAK PC GREENHOUSE 6 FT x 6 FT x 7 FT
Thank you for choosing Eagle Peak !
CONTENTS
1. lmportant Read Before Assermbly
……………………………………………………………………………………………………………….. 1 2. Dimensions & Specifications
………………………………………………………………………………………………………………………… 3 3. Part List
…………………………………………………………………………………………………………………………………………………………. 4 4. Base Assembly
………………………………………………………………………………………………………………………………………………. 7 5. Vent Assembly
…………………………………………………………………………………………………………………………………………….. 10 6. Door Assembly
……………………………………………………………………………………………………………………………………………. 13 7. Front Wall
Assembly ………………………………………………………………………………………………………………………………….. 16 8. Door Slider
Assembly …………………………………………………………………………………………………………………………………. 19 9. Side Wall
Assembly ……………………………………………………………………………………………………………………………………… 22 10. Back Wall
Assembly …………………………………………………………………………………………………………………………………. 25 11. Roof Frame
Assembly ………………………………………………………………………………………………………………………………. 32 12. Panel
Supports Assembly ………………………………………………………………………………………………………………………… 35 13. PC
Panels Installation ………………………………………………………………………………………………………………………………. 38 14.
Rainwater Collection System …………………………………………………………………………………………………………………… 44
15. Anchor the Base ……………………………………………………………………………………………………………………………………….. 47
16. Open and Close The Vents ………………………………………………………………………………………………………………………..
48 17. Additional Strength …………………………………………………………………………………………………………………………………..
49
IMPORTANT
Warning! To reduce the risk of serious injury, read the following safety instructions before assembling and using the greenhouse. Please check with your local governing authority/local municipal codes regarding installation of structures before assembly.
Caution!
Proper placement of your greenhouse is essential. Do not place the product underneath or near electrical lines. Keep children away during assembly. This product contains small parts which can be swallowed by children. Keep fingers away from the places where they can be pinched. Do not attempt to assemble the greenhouse if any parts are missing.
· The product smust be installed on flat and level horizontal surface. · Ensure enough clearance around the product. Before assembling the product, find level ground no less than 6′(1.8m) away from any structures or obstructions, such as fences, garages, houses, overhanging branches, laundry lines, or electrical wires. · This greenhouse is not to be regarded as part of a building/house structure. The greenhouse must be anchored securely to the ground or mounting surface. It is best to build the greenhouse on a hard, stable foundation. Appropriate screws or concrete anchors (not provided) must be used to anchor the greenhouse to the surface. Anchor stakes are provided for use on compacted soil or crushed stone. · The greenhouse may require two or more people to install safely. · Check for underground utilities before digging or driving stakes into the ground. · During installation, follow all safety warnings provided with your tools and use safety glasses. · If you set up more than one greenhouse, keep a minimum distance of 10′(3m) between the greenhouses. · Any assembly or maintenance of the product must be carried out by adults only. · Arrange necessary manpower when assembling or moving the product. · Some parts may contain sharp edges. Wear protective gloves if necessary. · Keep children and pets away while setting up the greenhouse. · Check all nuts and bolts periodically to ensure bolts/nuts are tightened. · Repairing and replacing parts should be done by a qualified person. · Do not light any fire inside or near the product! · Do not hang heavy weights on the roof frame. · Do not climb onto the roof of the greenhouse. Falling off or through the greenhouse can result in serious injury.
1
IMPORTANT
· Please read and understand this manual before any assembly. Before beginning
assembly of the product, make sure all parts are present. Compare parts with
packaging contents list. · Place all parts from the box in a cleared area and
organize them for assembly. · Remove all packing materials and place them back
into the box. Do not dispose of the packing materials until assembly is
completed. · DO NOT tighten the screws before PC panel assembly in order to
ensure all the parts fit with each other.
· The holes in the aluminum greenhouse are oval. If necessary, all parts of
the greenhouse can be moved and adjusted before installation complete. · It
will take 6-8 hours to set up the greenhouse with 2-3 people. Please leave
ample time to do the assembly, and do not stop once assembly has begun. A
partially assembled greenhouse frame may be damaged or destroyed due to bad
weather. · Read each step carefully before beginning any assembly and make
sure you understand each step. If any part is missing, or if you have any
questions, please contact the customer service service@eaglepeak.com.
· Needed for assembly: (The following tools are NOT included)
Drill
Slotted Screwdriver
Tape Measure
Goggles
2 – 3 people 2
Pliers Ladder
Dimensions & Specifications
518.9cfmt 6.129f0t cm
260.78cfmt
190
cm 6.2
ft
3
Part List
Item NO.
Sketch
Size
Qty
Item NO.
Sketch
Size
Qty
Item NO.
Sketch
Size
Qty
1A
1215mm 4X
7A
1830mm 2X
18B
595mm 2X
47.8in
72.0in
23.4in
1B
1130mm 1X
7B
44.5in
1300mm 51.2in
4X
19B
520mm 20.5in
4X
1C
1130mm 1X
7C
44.5in
594mm 2X
20B
23.4in
595mm 2X 23.4in
1D
1130mm 1X
7D
44.5in
1300mm
51.2in 2X
21A
603mm 5X 23.7in
1E
1130mm
44.5in 1X
7K
625mm 12X 24.6in
2A
1640mm 1X
8A
1840mm 2X
64.5in
72.4in
2B
1640mm 64.5in
1X
3A
1665mm 1X
9A
1830mm 1X
65.5in
72.0in
3B
1665mm 65.5in
1X
10A
635mm 2X 25.0in
3C
1215mm 4X
11A
625mm 1X
47.8in
24.6in
3D
1115mm
43.9in 4X
12A
610mm 24.0in 1X
4A
1830mm 2X
13A
1250mm 1X
72.0in
49.2in
4B
1830mm 72.0in
1X
14A
380mm 1X 15.0in
15A
1600mm 2X
63.0in
5A
1830mm
72.0in 1X
16A
625mm 2X 24.6in
6A
619mm 1X
17A
625mm 1X
24.4in
24.6in
4
Part List
Item NO.
Sketch
2
Size mm
Qty
1X
Item NO.
Sketch
18
Size Qty
Item NO.
Sketch
2X
Size
Qty
3
M6*40 17X
19
4X
4
2X
24
6X
5
M6*10 143X
25
4X
6
M3*20 16X
26
4X
7
M3*10 12X
27-1
1300mm 4X
51.2in
8
4X
9
2X
28
4X
10
2X
29
12X
11
1X
30
4X
13
2X
31
12X
14
178X
33
4X
15
4X
35
143X
16
8X
36
4X
17
62X
37
4X
38
4X
5
Part List
Item NO.
Sketch
Size Qty
Item NO.
Sketch
Size Qty
A4
603x1210mm 11X
B4
603x1120mm 4X
23.75×47.63in
23.75×44.09in
D4
603x590mm 2X
E4
595x550mm 2X
23.75×23.22in
23.42×21.65in
F4
603x655mm 1X
G4
23.75×25.78in
620x240mm 24.40×9.45in
1X
H4
620x230mm 1X
I4
24.40×9.05in
620x600mm 24.40×26.62in
2X
X4
603x440mm 23.75×17.32in
4X
6
Step 1
Base Assembly
Parts required for this step
27-1
1830 4X
28
4X
30
4X
31
8X
Needed in the grass
Needed in the grass
3
M6*40 16X 29
4X
4
2X
IMPORTANT: The ground, wooden deck, or concrete surface must be firm and level for maximum stability and durability. If not, the PC board may not be properly secured in the provided guide rail and may be blown out by strong wind. The greenhouse must be securely anchored by placing the foundation frame into the ground and securing with stakes, or by fixing it to a wooden deck or concrete surface. (See Step 1.1 – Step 1.5 for details.) Failure to properly secure or anchor the greenhouse will void the warranty.
7
Step 1
Base Assembly, cont’d 3
1.1 1.2
1.4
27-1
30
1.3
1.4
31
1.3
27-1
1.1
1.2
31
27-1
1.1 1.2 31
6.129f0t cm
1.1 1.2
27-1
190
cm 6.2
ft
1.1
28 29
1.2 Corner Stakes are needed to set up in soil (Status 1) 30
27-1
27-1
27-1
27-1
28 3
Assemble the foundation frame using (4) 27-1 Beams, (4) 28 Corner Brackets, (4) 29 Base Hooks, and (16) 3 Screws, Nuts and Washers. Use (4) 30 Corner Stakes, as shown in Step 1.2. if the greenhouse will be anchored directly to the ground.
8
Step 1
Base Assembly, cont’d
Assembly on Ground
1.3
30
1.4
Excavate the site by removing the top 3 in of grass or soil and leveling the base, allowing a 6 in perimeter around the foundation.
Assembly on Wood
or Concrete Pad
1.5
Build a level wood or concrete pad that is slightly wider and longer than the green house. DO NOT use Part 30 and 31 if set up on wooden deck or concrete ground.
Wooden Deck or
Concrete Ground
27-1 31
Base
9
Step 2
Vent Window Assembly
Parts required for this step
18B
595 2X 19B
520 4X
20B
595 2X
13
2X
E4
595*550 2X
5
M6*10 8X
7
M3*10 4X
4
2X
100
Step 2
Vent Window Assembly, cont’d 5
20B 2.1
19B
2.1 19B
E4
2.4 18B 2.2 2.3
2.2 2.3
13
11
Step 2 Repeat 2X
2.1
Vent Window Assembly, cont’d
Assemble (2) Frame piece 19B to (1) Frame piece 20B
using (3) Screw Set 5. Do not tighten screws at this
5
time.
20B 19B
20B
2.2
19B
19B
E4
Slide Window E4 into the window frame.
18B
2.3
2.4
19B
5
E4
E4
13 7
18B
18B
Secure the vent window handle 13 to the window frame using (2) screw 7.
12
Step 3
Door Assembly
Parts required for this step
11A
625 1X 12A
15A
1600 2X 16A
17A
625 1X
5
6
M3*20 16X
4
610 1X 625 2X M6*10 2X
2X
13
Step 3
Door Assembly, cont’d 5
3.1 15A
3.2 3.2
3.1
12A
11A
15A
3.2 16A
3.2 16A
3.3
3.3
17A
Door pre-assembly for future step. PC Panels are not needed at this time.
14
Step 3
3.1
Door Assembly, cont’d
Assemble Part 12A to Part 11A using (2) Screw, Washer and Nut 5.
11A 5
Assemble Part 12A/11A to (2) Vertical Door Frames
12A 3.2
16A 3.3
17A
6 15A
Assemble Part 16A to (2) Vertical Door Frames 15A using (4) Screws 6. Repeat
with second Part 16A as shown on Page 15A
6 Assemble Part 17A to (2) Vertical Door Frames 15A using (4) Screws 6.
15A
6
15
Step 4
Front Wall Assembly
Parts required for this step
1A
1215 2X
1B
1130 1X
1C
1130 1X
2A
1640 1X
2B
1640 1X
5A
1830 1X
6A
619 1X
7C
594 2X
7D
1300 2X
26
2X
5
M6*10 18X
4
2X
16
Step 4
Front Wall Assembly, cont’d 5
4.4 1A
1C
4.6
6A
4.6 1B
26 7C 7D
4.5
4.5
2B
2A
26 7C 7D
4.3 1A
5A
4.1
4.1
4.2
4.2
Front Wall pre-assembly for future step. PC Panels are not needed at this time. 17
Step 4
4.1
Front Wall Assembly, cont’d
4.2 1A
2A/2B
5
5A
Assemble Corner Support 1A to Bottom Frame 5A using (1) Screw, Washer, Nut 5.
Repeat at opposite end.
4.3
1B
26
5
7D 5A
Assemble Part 7D to Vertical Frames 2B using (1) Screw, Washer, Nut 5. Repeat with 2A.
4.4
1C
5
26
1A 7C
7D
Assemble Parts 7C, 7D, 1A and 1B to Corner Bracket 26 using (4) Screw, Washer,
Nut 5.
4.5
1A 7C
7D
Assemble Parts 7C, 7D, 1A and 1C to Corner Bracket 26 using (4) Screw, Washer,
Nut 5.
4.6
1B/1C
7C
2A/2B
5
5
6A 2A/2B
Attach end of Part 7C to (2) Vertical Supports 2A and 2B using (2) Screw, Washer, Nut 5.
Assemble Horizontal Beam 6A to (2) Vertical Supports 2A and 2B and Roof Beams 1B and 1C using (4) Screw, Washer, Nut 5.
18
Step 5
Attach the Door
Parts required for this step
13A
1250 1X
14A
2
1X
11
3
M6*40 1X
5
4
2X
380 1X 1X
M6*10 4X
19
Step 5
Attach the Door, cont’d
3
5
13A 1B 5.1
5.3
5.2
14A
2
5.4
1C 5.5
20
Step 5
Attach the Door, cont’d
5.1 5
5.2
1B
13A
13A
Slide (3) Screw 5 into the channel on upper Door Channel 13A.
5 6A 5
Attach Door Channel 13A to parts 6A and 1B using two of the three Screw 5.
5.3 13A
5.4 1B
14A 5
Attach the top of Vertical Support 14A to the end of 13A using the remaining
Screw 5.
5.5 13A
11
3 2 14A
Attach the bottom of Vertical Support 14A to Roof Beam 1B using Screw 3. Make
sure to use Spacer 2 as shown.
5
Slide the Door Frame assembly onto the Front Panel Assembly. Install the stop
Screw 5 and End Cap 11.
21
Step 6
Side Wall Assembly
Parts required for this step
3C
1215 4X
4A
1830 2X
7B
1300 4X
8A
1840 2X
5
M6*10 28X
4
2X
22
Step 6
Side Wall Assembly, cont’d 5
6.2
8A
6.4
7B 6.6
6.4 6.2
7B 6.6
3C
3C
6.1
6.3
6.5 4A
6.1
6.3
6.2
8A 6.4
7B 6.6
6.4 6.2
7B 6.6
3C
3C
6.1
6.3
4A
6.5
6.1 6.3
23
Step 6
Side Wall Assembly, cont’d
6.1 5
6.2 8A
3C
Slide (5) Screw 5 into the channel of Vertical Wall Support 3C. Repeat 3X.
6.3
5
3C
Attach the top of Vertical Wall Support 3C to Horizontal Beam 8A using the
Screw 5 nearest the end of part 3C. Repeat 3X.
6.4
3C
4A
5 Attach the bottom of Vertical Wall Support 3C to Horizontal Beam 4A using
the Screw 5 nearest the end of part 3C. Repeat 3X.
6.5
8A 5
7B Attach the top of Diagonal Brace 7B to Horizontal Beam 8A. Repeat 3X.
6.6
7B 4A
5
7B 5
3C
Attach the bottom of Diagonal Brace 7B to Horizontal Beam 4A. Repeat 3X.
24
Attach the middle of Diagonal Brace 7B to Vertical Support 3C using the middle Screw 5. Repeat 3X.
Step 7
Back Wall Assembly
Parts required for this step
1A
1215 2X
1E
1130 1X
1D
1130 1X
3A
1665 1X
3B
1665 1X
4B
1830 1X
7A
1830 1X
26
2X
5
M6*10 18X
4
2X
25
Step 7
Back Wall Assembly, cont’d 5
7.5
1E
7.1
7.1 7.5 1D
7.4 26
7.6 7A
1A
3A
7.6
7.4
26
3B
1A
4B
7.2
7.2
7.3
7.3
Set up the back panel for further step. Please note that no PC panel is required in this step. 26
Step 7
7.1
Back Wall Assembly, cont’d
5 3A/3B
7.2 1A
5 4B
Slide (5) Screw 5 into the channel of Vertical Wall Support 3A and 3B.
7.3 3A/3B
Attach Corner Vertical Support 1A to Horizontal Beam 4B using (1) Screw Set 5. Repeat on opposite end with remaining Vertical Support 1A.
7.4
1D/1E
26
5
4B
5
7A
1A
Attach Vertical Supports 3A and 3B to Horizontal Beam 4B using the lowest
Screw 5 inserted in step 7.1.
7.5 5
1D/1E
3A/3B
Attach Diagonal Roof Beams 1D and 1E and Horizontal Beam 7A to both Vertical
Supports 1A using Bracket 26 and (4) Screw 5 Sets as shown.
7.6 3A/3B
7A
5
Attach the top of Vertical Supports 3A
and 3B to Diagonal Beams 1D and 1E using
the top Screw 5 from Step 7.1. 27
Attach Horizontal Beam 7A to Vertical Supports 3A and 3B using the (2) Screw 5 that are second from the top.
Step 8
19
4X
8.1 8.1
8.1 8.1
8.1
1B/1C
1D/1E
Insert Plug 19 into the ends of Diagonal
19
Roof Braces 1B, 1C, 1D, and 1E.
28
Step 9
Joining the Walls
Parts required for this step
29
8X
9A
5
M6*10 14X
4
1830 1X
2X
5
9A
9.7
9.7
9.2 9.3
9.6 9.1 9.5
9.4
9.1 9.5 9. 4 9. 4
29
Step 9
9.1
4A
Joining the Walls, cont’d
Place the Right Wall Assembly and Back wall Assembly on the Foundation Assembly with the help of an assistant.
1A
Attach the bottom of Vertical Support 1A to
the end of Bottom Horizontal Beam 4A using
(1) Screw 5 Set.
Attach Horizontal Beam 8A to Vertical Support
5
1A and Diagonal Roof Beam 1D using (2) Screw
5 Sets.
Repeat with Left Wall Assembly.
9.2 1D/1E 5
8A 1A
1D/1E 8A
9.3 1B/1C
5
8A
8A 1A
1B/1C
Place the Front Wall Assembly on the Foundation Assembly. Attach the bottom of
Vertical Support 1A to the end of Bottom Horizontal Beam 4A using (1) Screw 5
Set per side. Attach Horizontal Beam 8A to Vertical Support 1A and Diagonal
Roof Beams 1B and C using (2) Screw 5 Sets per side.
30
Step 9
9.4
Joining the Walls, cont’d
3A/3B/3C
9.5 1A
5A
29 5
5 29 27-1
Secure Back wall Assembly and Sidewall Assemblies to the Foundation Assembly by removing the required nuts and washers, installing (6) Clip 29, and replacing the nuts and washers as shown.
Remove the nut and washer from the lower corner, install Clip 29 to attach the corner of the frame to the foundation. Repeat on all lower corners.
9.6
2A/2B
9.7
1C/1E
1B/1D
5
29 27-1 Secure the Front Wall Assembly to the Foundation by removing the nut
and washer at the bottom of Diagonal Brace 7, 2A and 2B. Install (2) Clip 29
and reinstall the washers and nuts.
5 9A
Attach Roof Ridge Beam 9A to Diagonal Roof Beams 1B, 1C, 1D, and 1E using (4)
Screw 5 sets.
31
Step 10
Installing the Roof Rafters
Parts required for this step
3D
1115 4X
24
6X
5
M6*10 24X
4
1X
32
Step 10
Installing the Roof Rafters, cont’d 5
Slide
9A
Slide the two Vent Panel assemblies into the channel on Ridge Beam 9A as
shown.
9A 10 .3 10 .4 3D 3D
24 24
9A
10 .1 10 .2 10 .5
33
Step 10
10.1
Installing the Roof Rafters, cont’d
10.2
3D
5 8A
3D
5
Slide (6) Screw 5 into the channel on (4) Roof Rafter 3D.
10.3
9A
10.4
3D
Attach the lower end of Roof Rafter 3D to Sidewall Horizonal Beam 8A using the
lowermost Screw 5. Repeat 3X.
3D
5 3D
Attach the top end of Roof Rafter 3D to Roof Ridge Beam 9A using the uppermost
Screw 5. Repeat 3X.
5 5 24
Attach Roof Brace 24 to Roof Rafter 3D using the second Screw 5. Repeat 1X.
10.5
3D
5
24 3C
5
Attach Roof Brace 24 to Sidewall Vertical Support 3C using the next lowest
Screw 5 on Roof Rafter 3D and the second Screw 5 on 3C. Repeat 3X.
34
Step 11
Installing the Panel Supports
Parts required for this step
7A
1830 1X
7K
625 12X
10A
635 2X
25
4X
7
M3*10 8X
5
M6*10 10X
4
1X
35
Step 11
Installing the Panel Supports, cont’d 5
11.1 11.2
7K
7K
10A
7A
7K
7K
3D
7K
7K
11.3
7K
11.3
11.5 11.7
11.5
11.4
11.6
11.1
11.2
3D
25
10A
7
25 7
Install (2) T Braces 25 on Vent Support 10A using (4) Screw 7. Repeat 1X.
36
10A 5
Attach Vent Support 10A to Roof Rafters 3D using (2) Screw 5. Repeat on
opposite side. Align with lower edge of the Vent Panels and tighten.
Step 11
Installing the Panel Supports, cont’d
11.3
1B/1C 1D/1E
7K
11.4 7K
5
5 7K 3D
Attach (3) Horizontal Panel Supports 7K to Diagonal Roof Beam 1B, 1D and Roof Rafters 3D using (4) Screw 5. Repeat on opposite side.
11.5 7K 1A
11.6
5 7K
7K
5 3C
Attach (3) Horizontal Panel Supports 7K to Vertical Wall Supports 1A and 3C using (4) Screw 5. Repeat on opposite side.
11.7
5
7A
1A
Attach (3) Horizontal Panel Supports 7A to Vertical Wall Supports 1A, 3A, and 3B using (4) Screw 5.
37
Set up the PC Panels Parts required for this step
A4
603*1210 11X
B4
D4
603*590 2X
F4
G4
620*240 1X
H4
I4
620*600 2X
X4
14
178 21A
17
62
6031120 4X 603655 1X 620230 1X 603440 4X
603 5X
38
PC Panels
Rear
A4
A4
A4
A4
B4
B4
A4
X4
F4
X4
A4
D4 E4
E4 D4
A4
A4
Side
B4
Roof
H4
X4
X4
I4
G4
A4
A4
I4
B4
Roof
A4
Side
Front
Notes: 1. Peel approximately 2 inches of film from all sheet edges before
installing. Remove all film
immediately after the constructions completed. 2. The UV-protected side of the
sheet is covered with opal white film and must face towards the
sun.
POLYCARBONATE PANEL
SUN
Opal white film
PC sheet
Transparent film
Two sides of PC sheet are covered with thin film, one side’s film is transparent, opposite side’s film is opal white. The UV-protected side of the sheet is covered with opal white film and must face towards the sun.
39
Step 12
Installing the PC Panels
Use of a ladder may be necessary to reach the top of the greenhouse.
The sides of the panels are secured using the Spring Clips 14. To place the clips insert one end into the frame channel. Then, capture the panel in the center of the clip as shown below. Lastly, insert the remaining end of the clip into the channel.
The ends of the panels are secured to the frame using Clip 17 as shown. Use (2) clips per short side.
Ladder
14 17
40
Step 12
Installing the PC Panels, cont’d
12.7
X4 21A
B4 H4
I 4
A4 G4
I 4
21A
X4
21A
F4
21A
E4
X4
12.4
A4
A4
B4
A4
D4 B4
X4 21A
A4
A4 A4 A4
12.3 12.2
12.5
12.1
12.6
14
41
Step 12
12.1
21A 14
Installing the PC Panels, cont’d
12.2 X4
X4
21A A4
A4 14
5A
17
4B
17
12.3 F4
21A
14 17
A4 4B
42
Step 12
12.4 9A
10A
D4
Installing the PC Panels, cont’d
12.5
14 B4
I4
16A
16A G4
17
8A
17
14
I4 17A
12.6 17
A4 14
12.7
1C
14
1B
H4
17 17
6A
43
Step 13
Installing the Accessories
Parts required for this step
8
4X
9
2X
10
2X
15
4X
16
8X
18
2X
33
4X
35
143
44
Step 13
Installing the Accessories, cont’d
13.1
13.3
13.3 13.2
13.4 13.2
13.4
13.1
45
Step 13
13.1 10 8
16
13.2
8A
8A
ATTENTION You may need a slotted screwdriver when you are assembling plug 10 & 9
1A
1A
9 8
16
15 13.3
9A
18
15 13.4
35
33
35
3D
Rotate
46
Anchor the Base
36 38 37
A drill will be needed to anchor the greenhouse to concrete.
27-1
A drill will needed to anchor
the greenhouse to wooden deck.
36
36
38
27-1
38
Concrete Ground
37
47
Wooden Deck
Open and Close The Vents
Attention: Make sure the vent is in the correct position before closing it. 13
I
II
III
IV
48
Additional Strength
Advice You can also glue the polycarbonate panel to the aluminum frame to
enhance the stability using silicone sealant.
Note Silicone sealant and caulking gun are not included in our tool kit. You
can buy them locally. Only use the silicone sealant suitable for aluminum.
49
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>