Plusrite BCP-DLB-01M DLB Box Powerful Single Phase EV Charger User Manual
- June 25, 2024
- Plusrite
Table of Contents
Plusrite BCP-DLB-01M DLB Box Powerful Single Phase EV Charger
Specifications
- Model: BCP-DLB-01M
- Phase: Single Phase
- Extreme Mode: OLED display
- Number of Current Transformers: Three
- Allow Distance between DLB and Charger: 1.5m (Can be customized up to 15m)
- Current Transformer Default Length: 1.5m
- Installation: Rail installation/screw
- Communication: RS485 (Use RJ45 interface to connect with network)
Product Usage Instructions
How DLB Box Works
The DLB (Dynamic Load Balancing) box is designed to maintain the dynamic balance of total household current when working with other appliances to avoid overloads and ensure electrical safety.
Installing the DLB Box
- Check accessories: Ensure all components are included.
- Network cable connection: Connect the DLB box with the charger using the provided network cable.
- Mounting: Use the Din rail fixing parts and M4*30 expansion screw kit for installation.
Setting Max Grid Current on DLB Box
For Single Phase DLB System: EVC Current = Max Grid Current – Household Load Current
For Three Phase DLB System: EVC Current = Minimum of (Max Grid Current A Phase – Household Load Current A Phase, Max Grid Current B Phase – Household Load Current B Phase, Max Grid Current C Phase – Household Load Current C Phase)
CT Installation for Single Phase Normal DLB Box (BCP-DLB-01M)
- Clamp the CT on the house mains cable including house loads and EV charger power cable.
- Connect the red cable of CT to L1B at the Home port and the blue cable of CT to L1A at the Home port.
Frequently Asked Questions
What is Extreme Mode and how to activate it?
In Extreme Mode, charging stops when home loads increase to
avoid overload. Restart charging when there is sufficient current.
Activate Extreme Mode via DIP switch for unsmart EV chargers or
through APP settings for smart EV chargers.
How do I determine the current set on the DLB box?
For Single Phase DLB System: EVC Current = Max Grid Current – Household Load Current
For Three Phase DLB System: EVC Current = Minimum of (Max Grid Current A Phase – Household Load Current A Phase, Max Grid Current B Phase – Household Load Current B Phase, Max Grid Current C Phase – Household Load Current C Phase)
DLB Box Manual
WWW.BENY.COM
Normal DLB
1.About DLB DLB (Dynamic Load Balancing) is available in the BCP series AC EV Charger for home use, when the EV charger is working with other household appliances at the same time, the DLB box can maintain the dynamic balance of the total household current and ensure the safety of electricity to avoid home over load.
DLB Model Selection
Normal DLB
What is Extreme Mode?
In this mode, charging will be stopped once the home loads keep increasing to
avoid home over load. Restart to charging once there is enough current like
10A for charger. If the Extreme Mode is not turned on, the EV charger will not
stop charging due to the DLB limit, and the lowest current that DLB can limit
will be 6A.
How to Active Extreme Mode?
The DLB Extreme Mode: For a unsmart ev charger can be actived via DIP switch
(the third one); For a smart ev charger can be actived via APP setting.
Model
Phase
Extreme Mode Number of Current Transformers Display
Allow Distance between DLB and Charger
Current Transformer Default Length
Installation
Communication
BCP-DLB-01M Single Phase
1
OLED
More than
BCP-DLBThree
3
1.5m(Can be customized up to 15 Rail installation/screw
RS485(Use RJ45 interface to connect with network)
01
02
Normal DLB
1 Phase System with DLB: BCP-DLB-01M (Correct Installation)
Solar Panel
Home Port
PV Port
L1
N Ethernet cable
3 Phase System with DLB: BCP-DLB-03M (Correct Installation)
Normal DLB
What the current is that you set on DLB box? For Single Phase DLB System: The
Current of EVC = Max Grid Current(Set on DLB Box) – Household Load Current
For Three Phase DLB System: The Current of EVC = The Minimum between: Max Grid
Current A Phase(Set on DLB Box) – Household Load Current A Phase Max Grid
Current B Phase(Set on DLB Box) – Household Load Current B Phase Max Grid
Current C Phase(Set on DLB Box) – Household Load Current C Phase
Grid Power
Household Load Current
DLB Box
03
Home Port
PV Port
L1 L2
Ethernet cable L3 N
Inverter
Solar Panel
04
Normal DLB
4. How to install the DLB box? Please double check your accessories
Normal DLB
Network cable connection Connect the DLB box with charger by the network
cable.
Din rall 105mm
X1
Din rail fixing parts
X2
M4*30 expansion screw kit
X2
Current Transformer (1-phase DLB)1
or (3-phase DLB)3
Network cable – 5m (RJ45 TIA/EIA-568B 8-core cat5 twisted pair cables)
X1
X1
Normal DLB box
X1
05
Network Cable Recommended
Length
Rj45 TIA/EIA-568B
8-core cat5 twisted pair cables
Rj45 TIA/EIA-568B
06
Normal DLB
Normal DLB
CT installation of single phase Normal DLB Box (BCP-DLB-01M)
Make CT clamp on house mains cable. (Including some of or all of house loads
and EV Charger power cable) Red cable of CT should be connected to L1B at the
Home port; Blue cable of CT should be connected to L1A at the Home port.
Before installation, please check the Arrow Direction of CT Clamp. 1) If it is same as Item 1 1 ” “, please refer to page 08. 2) If it is opposite direction ” “, please refer to next page 9 & 10.
Side View 1
Front View 2
Front View 3
Side View 4
P1
P2
Blue (+)
Red (-)
Blue (+)
Red (-)
07
08
Normal DLB
Normal DLB
CT installation of single phase Normal DLB Box (BCP-DLB-01M)
Make CT clamp on house mains cable. (Including some of or all of house loads
and EV Charger power cable) Red cable of CT should be connected to L1A at the
Home port; Blue cable of CT should be connected to L1B at the Home port.
Before installation, please check the Arrow Direction of CT Clamp. 1) If it is same as Item 1 1 ” “, please refer to page 10. 2) If it is opposite direction ” “, please refer to previous page 7 & 8.
Side View 1
Front View 2
Front View 3
Side View 4
P1
P2
Blue (+)
Red (-)
Blue (+)
Red (-)
09
10
Normal DLB
Normal DLB
CT installation of three phase Normal DLB Box (BCP-DLB-03M)
Make CT clamp on house mains cable. (Including some of or all of house loads
and EV Charger power cable) Red cable of CT should be connected to L1B, L2B,
L3B at the Home port; Blue cable of CT should be connected to L1A, L2A, L3A at
the Home port.
Before installation, please check the Arrow Direction of CT Clamp. 1) If it is same as Item 1 1 ” “, please refer to page 12. 2) If it is opposite direction ” “, please refer to next page 13 & 14.
Side View 1
Front View 2
Front View 3
Side View 4
P1
P2
Blue (+)
Red (-)
Blue (+)
Red (-)
11
12
Normal DLB
Normal DLB
CT installation of three phase Normal DLB Box (BCP-DLB-03M)
Make CT clamp on house mains cable. (Including some of or all of house loads
and EV Charger power cable) Red cable of CT should be connected to L1A, L2A,
L3A at the Home port; Blue cable of CT should be connected to L1B, L2B, L3B at
the Home port.
Before installation, please check the Arrow Direction of CT Clamp. 1) If it is same as Item 1 1 ” “, please refer to page 14. 2) If it is opposite direction ” “, please refer to previous page 11 & 12.
Side View 1
Front View 2
Front View 3
Side View 4
P1
P2
Blue (+)
Red (-)
Blue (+)
Red (-)
13
14
Normal DLB
5. How to Set the Max Grid Current on DLB Box?
For 1 Phase DLB box
Normal DLB
For 3 Phase DLB box
17A
0/17A
17A
0/17A
17A
0/17A
press simultaneously
0/17A
17A
0/17A
17A
0/17A
17A
press simultaneously
Wait for 5S to automatically save
Press “+”, “-” to adjust the value
18A 17A 17A
Press “+”, “-” to adjust the value
19
19A
18A
18A
17
17A
Press “+” and “-” at
the same time to jump
Wait for 5S till automatic set
15
16
Normal DLB
Normal DLB
15
16
Normal DLB
LED light status
Fault type Potential Cause
Action
Yellow light on for 1s
Red light flashes 1 time
The yellow light of the charger light board lights for 1s, then the red light flashes for one time, and this happened in turn.
DLB offline
RS485 cable is damaged
RS485 cable is not connected firmly
Replace RS485 cable
Reconnect
CT is clamped on the wrong power
cord
Check if the CT position is correct
Yellow light on for 1s
The red
light flashes twice in a row
The yellow light of the charger light board lights on for 1s,and then the red light flashes twice in succession.This happens in turn.
DLB current abnormal
CT open coil is not connected firmly
The connection between the CT cable and the DLB
is loose
Reconnect Reconnect
The DLB box doesn’t
measure the charging current of EV charger,
check whether the
Check if the CT position is correct
17
cable is connected.
Solar DLB
Solar DLB 1. About solar DLB Solar DLB (Dynamic Load Balancing) is available in the BCP series AC EV charger for home and solar home use, controlling and monitoring the different powers from PV to make different modes come true. Full Speed Mode (As faster charging as possible) Pure PV Mode (Almost 0 power from grid)
- Hybrid Mode Solar DLB box can be used for the home without solar power as normal DLB box.
18
Solar DLB
2. Solar DLB Model Selection
Model Phase Operating Mode Extreme Mode Night Automatic Full Speed Mode
PV to Normal /Normal to PV
Number of Current Transformers Display
Distance between DLB box and RV charger suppert
Current Transformer Default Length
BCP-DLB-11M Single Phase
PV
BCP-DLB-13M Three Phase
PV
2 6
OLED
More than 300M
1.5m(Can be customized up to 15 meters)
Installation Communication
Rail installation/Screw fixing RS485(Use RJ45 interface to connect with network)
What is PV Extreme Mode?
In this mode, once the household load continues to increase and the
photovoltaic power generation is not enough to maintain the minimum current of
the EV charger, it will stop charging to avoid using too much grid power (this
power depends on the set value). When the EV charger has enough current (eg
10A), restart charging.
19
Solar DLB
What is Night Automatic Full Speed Mode? In this mode the EV charger will
remain charged at full speed (Pm20:00- Am6:00). Note: The coin cell battery is
not installed in the original factory charger (the battery is installed by
yourself if required), the EV charger will lose this configuration after
restarting, and it needs to reconnect the APP to configure it.
How to Active Night Automatic Full Speed Mode? We can set the Night Automatic
Mode through APP.
Introduction to the three modes of DLB
Pure PV Mode Pure PV Mode
The EV charger in the pure PV mode will control its own charging current as much as possible, so that the actual input value of the grid current is as close as possible to 0A.
Hybrid Mode 4.6kW
Hybrid Mode
The EV charger in hybrid mode will control its own charging power to keep the grid input power as close as possible to the DLB setting.
Full Speed Mode Full Speed Mode
When the EV charger is working in full speed mode, the DLB will no longer
limit the charging current of the EV charger, and the charging pile will use
the maximum
d f ch i
20
Solar DLB
3. How the solar DLB box works?
3.1 CT Installation Diagram 1 Phase System with DLBBCP-DLB-11M (Correct
Installation)
Inverter
Solar Panel
Home Port
PV Port
L1
N
Ethernet cable
If it is impossible to connect due to distance or other reasons, you can refer to the installation method described in the following chapters and don’t need to install the CT clamp.
Solar DLB
3 Phase System with DLBBCP-DLB-13M (Correct Installation)
Inverter
Solar Panel
Home Port
PV Port
L1 L2
Ethernet cable L3 N
What the current is that you set on Solar DLB box? For 1-Phase Solar DLB
System: “The allowable power of EVC”= “Max grid power”(set via DLB) + “PV
output power”- “household load power” For 3-Phase Solar DLB System: “The
allowable power of EVC”=Max grid power (set via DLB)*(Phase of the current EV
charger)”+”The sum of the three phase power of PV power” – “The sum of the
three phase power of household load”
21
22
Solar DLB
Solar DLB
Grid Power
DLB Box
PV Output Power
Household Load Power
21
22
Solar DLB
3.2 Once the inverter is too far to install PV CT 1 Phase System with Solar
DLB
Solar Panel
Ethernet cable
EV Charger
3 Phase System with Solar DLB
Inverter
Solar Panel
Ethernet cable
EV Charger
23
Solar DLB
Press button “-” and “+” simultaneously, then enter “Solar Mode”. There are
two modes of Solar Mode. Mode 2: Press “-” and “+” button simultaneously, and
not appear ” Solar CT”, please refer to page 36. Mode 1: Press “-” and “+”
button simultaneously, and appear ” Solar CT”, can adjust to Normal or Solar
DLB.
Mode 1
Press “-” and “+” simultaneously and enter “Solar Mode”
Mode 2
Press “-” and “+” simultaneously and appear ” Solar Mode”
Press “-” and “+” simultaneously and no appear ” Solar Mode”
Please refer to Page 36
Press “-” and “+” simultaneously for mode selection
Press “-” to select “Yes”
Press “+” to select “No”
Enter Normal DLB.
Enter Solar DLB. 24
Solar DLB
4. How to install the DLB box? Please double check your accessories
Solar DLB
Network cable connection Connect the DLB box with charger by the network
cable.
Din rall 105mm
X1
Din rail fixing parts
X2
M4*30 expansion screw kit
X2
Current Transformer (1-phase Solar DLB)2
or (3-phase Solar DLB)6
Network cable – 5m (RJ45 TIA/EIA-568B 8-core cat5 twisted pair cables)
X1
X1
Solar DLB box
X1
25
Network Cable Recommended
Length
Rj45 TIA/EIA-568B
8-core cat5 twisted pair cables
Rj45 TIA/EIA-568B
26
Solar DLB
Solar DLB
CT installation of single phase Solar DLB Box (BCP-DLB-11M)
Make CT clamp on house mains cable. (Including some of or all of house loads
and EV Charger power cable) Red cable of CT should be connected to L1B at the
Home port & PV port; Blue cable of CT should be connected to L1A at the Home
port & PV port.
Before installation, please check the Arrow Direction of CT Clamp. 1) If it is same as Item 1 1 ” “, please refer to page 28. 2) If it is opposite direction ” “, please refer to next page 29 & 30.
Side View 1
Front View 2
Front View 3
Side View 4
P1
P2
Blue (+)
Red (-)
Blue (+)
Red (-)
27
28
Solar DLB
Solar DLB
CT installation of single phase Solar DLB Box (BCP-DLB-11M)
Make CT clamp on house mains cable. (Including some of or all of house loads
and EV Charger power cable) Red cable of CT should be connected to L1A at the
Home port & PV port; Blue cable of CT should be connected to L1B at the Home
port & PV port.
Before installation, please check the Arrow Direction of CT Clamp. 1) If it is same as Item 1 1 ” “, please refer to page 30. 2) If it is opposite direction ” “, please refer to previous page 27 & 28.
Side View 1
Front View 2
Front View 3
Side View 4
P1
P2
Blue (+)
Red (-)
Blue (+)
Red (-)
29
30
Solar DLB
Solar DLB
CT installation of three phase Solar DLB Box (BCP-DLB-13M)
Make CT clamp on house mains cable. (Including some of or all of house loads
and EV Charger power cable) Red cable of CT should be connected to L1B, L2B,
L3B at the Home port & PV port; Blue cable of CT should be connected to L1A,
L2A, L3A at the Home port & PV port.
Before installation, please check the Arrow Direction of CT Clamp. 1) If it is same as Item 1 1 ” “, please refer to page 32. 2) If it is opposite direction ” “, please refer to next page 33 & 34.
Side View 1
Front View 2
Front View 3
Side View 4
P1
P2
Blue (+)
Red (-)
Blue (+)
Red (-)
31
32
Solar DLB
Solar DLB
CT installation of three phase Solar DLB Box (BCP-DLB-13M)
Make CT clamp on house mains cable. (Including some of or all of house loads
and EV Charger power cable) Red cable of CT should be connected to L1A, L2A,
L3A at the Home port & PV port; Blue cable of CT should be connected to L1B,
L2B, L3B at the Home port & PV port.
Before installation, please check the Arrow Direction of CT Clamp. 1) If it is same as Item 1 1 ” “, please refer to page 34. 2) If it is opposite direction ” “, please refer to previous page 31 & 32.
Side View 1
Front View 2
Front View 3
Side View 4
P1
P2
Blue (+)
Red (-)
Blue (+)
Red (-)
33
34
Solar DLB
5. lnstrustions for using solar DLB How to switchover between solar DLB and
normal DLB?
0.0
0.0
0.0
Long press buttons for 5 seconds
Switch to Normal Mode
Yes
No
Switch to PV Mode
Yes
No
0/40A 0/40A 0/40A
0
0
20
Solar DLB
How to switchover between different Modes of solar DLB?
0
0
press simultaneously
4.6kW Wait for 5S to
automatically save
35
36
Solar DLB
Solar DLB Troubleshooting
LED light status
Fault type
Potential Cause
Action
Yellow light on for 1s
Red light flashes 1 time
The yellow light of the charger light board lights for 1s, then the red light flashes for one time, and this happened in turn.
DLB offline
RS485 cable is damaged
RS485 cable is not connected firmly
Replace RS485 cable
Reconnect
CT is clamped on the wrong power
cord
Check if the CT position is correct
Yellow light on for 1s
The red
light flashes twice in a row
The yellow light of the charger
DLB current abnormal
CT open coil is not connected firmly
Reconnect
light board lights on for 1s,and then the red light flashes twice
in succession.This happens in turn.
The connection between the CT cable and the DLB
is loose
Reconnect
The DLB box doesn’t measure the charging current of EV charger,
check whether the cable is connected.
Check if the CT position is correct
37
References
- BENY: Leading Manufacturer of Solar PV and EV Charging Solutions