LEVOLOR Dual Shades Motorization Instruction Manual

June 9, 2024
LEVOLOR

LEVOLOR Dual Shades Motorization

CANADIAN RESIDENTS ONLY

  • Control operation systems vary by country. Call 1-866-937-1875 for more information.
  • For all safety, related inquiries, call 1-866-662-0666 or visit www.canada.ca, search “blind cords”.
  • These instructions include references to some product features and operating capabilities that may not be available in Canada.

WINDOW AND SHADE TERMINOLOGY

Thank you for purchasing LEVOLOR® Roller Shades. With proper installation, operation, and care, your new roller shade will provide years of beauty and performance. Please thoroughly review this instruction booklet before beginning installation.

MOUNTING TYPES AND WINDOW TERMINOLOGY

If the installation brackets are mounted correctly, the rest of the installation process follows easily. To prepare for this important first step, review the mounting types and basic window terminology illustrated below.

INSTALLATION OVERVIEW

  • Confirm that the headrail and shade are the proper width and length.
  • If installing several sets of shades, be sure to match them with the appropriate window.
  • Check the installation surface to ensure that you have suitable fasteners and tools.
  • Lay out and organize all parts and components.

Installation Brackets
Your order will include the correct number of installation brackets for your shade width, as shown in the table below

Shade Width (inches) Number of Brackets per Shade
Up to 36 3
36 to 54 4
54 to 72 5
72 to 108 6
108 to 144 7

GETTING STARTED

COMPONENTS INCLUDED IN THE BOX

TOOLS AND FASTENERS YOU MAY NEED (not included)

The tools you will need for installing your shade will vary, depending on the installation surface and mounting bracket type.

Tools typically used for installation include:

CAUTION : Use drywall anchors when mounting into drywall (not provided). Failure to properly anchor shade could cause shade to fall possibly resulting in injury.

INSTALLATION

PAIR SHADE BEFORE INSTALLING REMOTE CONTROL

  • Use the – and + buttons to select the channel to pair to.
  • Press and hold the programming button on the window covering for about 2 seconds until the shade jogs and/or beeps once.
  • In the next 10 seconds, press and hold the box on the remote until the shade jogs twice and/or beeps three times.

USING THE INMOTION APP

  • If you purchased a hub, download the LEVOLOR InMotion™ app to get started.
  • Shade can be directly paired to app, but it is recommended to pair to remote first.

INSIDE MOUNT (IM)

STEP 1: MARKING THE BRACKET LOCATIONS

IMPORTANT : Before marking bracket locations, ensure that your bracket placement will not interfere with any components inside the headrail.

  • Verify that the window casing has a minimum depth of 2 1⁄8″ which allows for a partially recessed headrail mount.
  • If flush mount (fully recessed mount) is desired, a minimum mounting depth of 3 5⁄8″ is required, depending on cassette size.
  • Mark approximately 3″ from each jamb for bracket location.
  • Mark screw locations for each end bracket, 2 holes per bracket.
  • If more than three installation brackets come with your order, space additional bracket(s) evenly between the two end brackets, no more than 30″ apart.

STEP 2: INSTALLING THE BRACKETS

  • Pre-drill screw holes using a 1⁄16″ drill bit.
    • If installing brackets into wood, use supplied screws.
    • If installing into drywall, use anchors in combination with supplied screws.
  • Screw in brackets at marked locations.
  • Ensure all brackets are square with each other.

STEP 3: INSTALLING THE SHADE

  • Hook the top, middle rib of the cassette valance onto all of the bracket hooks.
  • Rotate the back of the cassette valance firmly upwards and toward the window until the groove at the bracket snaps into place

CAUTION : Be sure the brackets are properly engaged before operating the shade. Failure to do so may result in the shade falling and possible injury.

REMOTE CONTROL

  • Use the – and + buttons to select the channel to pair to.
  • Press and hold the programming button on the window covering for about 2 seconds until the shade jogs and/or beeps once.
  • In the next 10 seconds, press and hold the box on the remote until the shade jogs twice and/or beeps three times.

USING THE INMOTION APP

  • If you purchased a hub, download the LEVOLOR InMotion™ app to get started.
  • Shade can be directly paired to app, but it is recommended to pair to remote first.

OUTSIDE MOUNT (OM)

STEP 1: MARKING THE BRACKET LOCATIONS
IMPORTANT : The brackets must be flush against a flat mounting surface. Do NOT mount brackets on curved molding.

  • Center the shade over the window opening at the desired height.
  • Mark screw locations for each
  • bracket approximately 3″ from end of cassette, 2 holes per bracket.
  • Use a level to ensure all brackets are aligned.
  • If more than three installation brackets come with your order, space additional bracket(s) evenly between the two end brackets, no more than 30″ apart.

STEP 2: INSTALLING THE BRACKETS

  • Pre-drill screw holes using a 1⁄16″ drill bit, using pencil marks as a guide.
    • If installing brackets into wood, use supplied screws.
    • If installing into drywall, use anchors in combination with supplied screws.
  • Screw in L brackets at marked locations, 2 screws per bracket.
  • Ensure all L brackets are square with each other.
  • Attach cassette mounting bracket to L bracket using screws and hex nuts.
    • Make sure the release tab is always mounted on the bottom.

STEP 3: INSTALLING THE SHADE

  • Hook the top, middle rib of the cassette valance onto all of the bracket hooks.
  • Rotate the back of the cassette valance firmly upwards and toward the window until the groove at the bracket snaps into place.

CAUTION : Be sure the brackets are properly engaged before operating the shade. Failure to do so may result in the shade falling and possible injury.

OPERATION

REMOTE OPERATION

  • Scan for remote guide. ****

BATTERY CHARGING

  • Rechargeable battery is integrated into shade headrail.
  • Use the standard micro-USB cable or attach the magnetic charging adapter to the 5V power adapter for simple and easy charging.
  • Indicator light battery status:
    • Low (red flash)
    • Charging (green flash)
    • Charged (green solid)
  • It is recommended to fully charge shade prior to first use.

UNINSTALL

REMOVING THE SHADE

  • Fully raise the shade.
  • While holding the headrail, use a flathead screwdriver to engage the release tab on the bottom of all of the installation brackets.
  • Rotate the bottom of the shade away from the window, fully releasing it from the brackets.

CAUTION : Hold shade firmly when removing. Failure to do so may result in the shade falling and possible injury.

CLEANING AND CARE

CLEANING PROCEDURES
All LEVOLOR Roller Shades have multiple cleaning options.

NOTICE : Avoid contact with window cleaning products. Improper cleaning may void warranty.

  • DUSTING
    Use a feather duster for regular cleaning.

  • FORCED AIR
    Blow away dirt and debris using clean compressed air.

  • PROFESSIONAL INJECTION/EXTRACTION CLEANING
    Call local on-site blind/shade cleaner that injects a cleaning solution into the fabric and extracts the dirty solution at the same time. The service is typically performed at home so you do not need to remove your window treatments.

  • VACUUMING
    Use a low suction vacuum with a brush-type cleaner attachment; stroke lightly over the shade to clean.

  • SPOT-CLEANING/STAIN REMOVAL AT HOME
    Use warm water and a mild soap, like Woolite® or Scotchgard®, if needed. Do not immerse shade in water.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

LEVOLOR User Manuals

Related Manuals