Mercia Garden Overlap Pent Bike Store Instruction Manual
- June 7, 2024
- Mercia Garden
Table of Contents
Mercia Garden Overlap Pent Bike Store
General Instructions
4×6 Overlap Pent Bike Store
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings – Require a preservative treatment to protect against rot and decay and a waterproof treatment to prevent water ingress
Pressure Treated buildings – Require a waterproof treatment to prevent water ingress
Log Cabins – Are supplied untreated and require a preservative and waterproofing treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of children’s products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you specific product code
All building’s should be erected by two adults
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
For ease of assembly, you MUST pilot drill all screw holes and ensure all screw
CAUTION Every effort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timer.
Protim Aquatan T5 (621)
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueous mixture of sodium dioctyl sulphosuccinate and alcohols: 2, 4, 6 trichlorophenol.
01OBS0406-V1
Overall Dimensions:
Length = 1952mm
Width = 1253mm
Height = 1230mm
Base Dimensions:
Length = 1900mm
Width = 1180mm
Building Content
-
Front Panel QTY 1
AI-01PBSFS765X1186-V1 -
Right Gable QTY 1
AI-01OBSRG1185X1188-V1
-
Left Gable QTY 1
AI-01OBSLG1185X1188-V1
-
Back Panel QTY 2
AI-01PBSBP925X1096-V1
-
Floor QTY 2
AI-OSBF1180X950-V1
-
Door QTY 2
AI-01PBSD525X1110-V1
-
Roof QTY 2
PI-03-0324
-
Roof Support – 28x28x1133mm QTY 1
F2828-1133mm
-
9 Door Frame – 28x28x1085mm QTY 2
F2828-1085mm
-
10 Door Side Frame – 28x28x1118mm QTY 1
F2828-1118mm
-
11 Eaves Frame – 28x28x969mm QTY 2
F2828-969MM
-
12 Door Side Trim – 28x7x1138mm QTY 1
OVLPR728-1138MM
-
Cover Trim – 45x7x1247mm QTY 11
OVLPR745-1247MM
-
Butt Hinge QTY 4
PI-07-0066
-
Turn Button QTY 3
PI-07-0034
-
“L” Bracket QTY 1
PI-07-0012
-
Felt
Nail Bag
Pre Assembly
Before assembling remove the transportation blocks from the bottom of each
panel.
Step 1
Place the two floors onto a firm and level base upside down.
Secure the floors together using 3x50mm screws, fixing in an alternating pattern as shown in the illustration.
Once fitted, turn the floor assembly the right way up.
Ensure the base has suitable drainage & is free from areas where standing water can collect.
Step 2
a). Place the back panels and the right gable onto the floor and secure in place using 6x50mm screws.
b). Do not secure to the floor until the roof is fixed.
6x50mm Screws
Step 3
a). Following the same method outlined in step 2, place the front panel and the left gable onto the floor and secure in place using 6x50mm screws.
b). Do not secure to the floor until the roof is fixed.
*The door opening can be positioned at either side of the building depending on your needs and preferences.
Step 4
Place the first door frame in between the gable and the front panel and secure in place using 3x50mm screws.
*Ensure to screw through the framing into the floor bearers 3x50mm Screws
*The door opening can be positioned at either side of the building depending on your needs and preferences.
Step 5
Attach the door side rail to the front panel with 3x50mm screws.
*Ensure the door side rail sits on top of the bottom framing.3x50mm Screws
*The door opening can be positioned at either side of the building depending on your needs and preferences.
Step 6
a). Using 2x20mm screws fix the “L” bracket to one end of the remains door frame.
b). Place the assembled rail onto the side door rail and secure through the top using 1x50mm screw and to the gable ( through the “L” bracket) using 2x30mm screws.
Step 7
Place the roof support bar centrally in the building and secure into place with 2x50mm screws, fixing through the top rail and the back panel.
Step 8
Fix the large trims to the ( gable ) side and the bottom of the door opening as shown in the illustration, securing into place using 3x30mm screws per trim.
*Measure and cut trims to fit.
attach the small door side trim to the door side rail with 3x30mm screws.
Step 9
Attached 2x butt hinges to each door, securing at the edge with 3x30mm screws per hinge.
Align each door into the door gap and secure at either side using using 3x30mm screws per hinge.
Step 10
a). Secure 1x eaves frame to each roof sheet, flush to the edge, using
3x30mm screws.
b). Rest the assembled roof sections on top of the building and fix into
place with 8x30mm screws per roof.
Step 11
b). Once the roof is fixed secure the the building to the floor with 15x50mm screws.
*Ensure to screw through the framing into the floor bearers.
Step 12
Cut the felt into 2 sheets and lay onto the roof.
* Ensure there is approximately 50mm of overhang around the building.
Fix into place using 60x felt tacks at 100mm intervals.
Step 13
Fix the trims to each corner of the building and across the joint at the back, securing each trim into place with 3x30mm screws
*Measure and cut trims to fit.
Step 14
Fix the remaining trims around the top of the building, make sure to trap the felt in between. Secure each trim in place with 3x30mm screws.
*Measure and cut trims to fit.
Step 15
a). Attach a turn button to the top and bottom of one door (depending on
which door you wish to be the locking door) using 1x30mm black screw per turn
button.
b). Fix the last turn button to the front of the “locking door” with
1x30mm black screw.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Documents / Resources
|
Mercia Garden Overlap Pent Bike
Store
[pdf] Instruction Manual
Overlap Pent Bike Store, 01OBS0406-V1, 4x6
---|---