Mercia Garden Bournemouth Instruction Manual
- June 7, 2024
- Mercia Garden
Table of Contents
Mercia Garden Bournemouth Instruction Manual
General Instructions 03BRN0707-V4 7X7 BOURNEMOUTH
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be affected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of
the wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes
cannot be avoided but can be helped. It is suggested that the outdoor building
is sprayed with water during extended periods of warm sunshine and sheltered
as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps
to protect the product during transit and for upto 3 months against mould. To
validate your guarantee and ensure longevity of the product, it is ESSENTIAL
the building is treated with a wood preserver within the first three months of
assembly and thereafter in accordance with the manufactures recommendations.
Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment. Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of
Safety and in the case of childrens products independently tested to EN71
level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for you specific product code
All building’s should be erected by two adults
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
For ease of assembly, you MUST pilot drill all screw holes and ensure all
screw heads are countersunk.
CAUTION
Every effort has been made during the manufacturing process to eliminate
the prospect of splinters on rough surfaces of the timber. You are strongly
advised to wear gloves when working with or handling rough sawn timber.
Protim Aquatan T5 (621)
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building
as been treated by the correct application of Aquatan solution and then
allowed to dry.
Aquatan is a decorative finish to colour the wood, which is applied
industrially to timber fence panels and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution,
aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4,
6-trichlorophenol.
03BRN0707-V4
Overall Dimensions:
Length = 2233mm
Width = 2227mm
Height = 2181mm
Base Dimensions:
Length = 1923mm
Width = 2082mm
-
Door Gable
-
Plain Side QTY 2
-
Plain Gable
-
Floor
-
Roof Sheet QTY 2
-
Master Door
-
Slave Door **
**
-
Veranda Floor
-
Veranda Side QTY 2
-
Ridge Bar – 1457mm
-
Eaves Frame – 2185mm QTY 2
-
Cover Trim – 1682mm QTY 4
-
Fascia – 1192mm QTY 4
-
Angled Fascia Block – 340mm
-
Fascia Block – 140mm QTY 2
-
Finial QTY 2
-
Veranda frame – 1690mm QTY 2
-
“L” Bracket QTY 2
-
Butt Hinge QTY 6
-
Turn Button QTY 2
-
Barrel Bolt QTY 2
Nail Bag
35mm Bolt x4
50mm Screw x44
40mm Screw x28
30mm Screw x56
25mm Screw x38
16mm Black Screw x2
16mm Screw x4
10mm Screw x10
Felt Tacks x122
Pre Assembly
Remove the transportation blocks from the bottom of each panel before
beginning the assembly.
Step 1
Place the oor onto a firm and level base. Ensure the base has suitable
drainage & is free from areas where standing water can collect.
Step 2
Attach the doors to the door gable with 3x butt hinges per door using 36x25mm
screws.
Ensure to screw the hinges into the framing.
36x25mm Screws
Step 3
Place the plain gable and the first plain side onto the floor.
- Fix the corners with 50mm screws as shown in the illustration, making sure the gable sits inside the panel.
- Do not secure the building to the floor until the roof is fitted.
**3x50mm Screws
**
Step 4
Place the door gable and the second plain side onto the floor.
- Fix the corners with 50mm screws as shown in the illustration, making sure the gable sits inside the panel.
- Do not secure the building to the floor until the roof is fitted.
**9x50mm Screws
**
Step 5
Attach the “L” brackets centrally to the ridge bar using 2x30mm screws per bracket.
Measure 67mm from each side of the ridge bar and mark with a pencil. Align
the front edge of the bracket with the pencil mark as shown in the
illustration.
**4x30mm Screws
**
Step 6
Place the assembled ridge bar inbetween the gables, resting on top of the
blocks.
Secure to the gables using 2x30mm screws per side.
Adjust the “L” brackets if needed.
4x30mm Screws
Step 7
Fix an eaves frame to the edge of each roof sheet with 5x30mm screws per
frame.
**10x30mm Screws
**
Step 8
Place the assembled roof panels onto the building as shown in the
illustration. Fix into place using 8x30mm screws per side, ensuring the roofs
are flush with the top of the gables.
The roof panels should be level with the back of the building leaving an
overhang over the front.
**16x30mm Screws
**
Step 9
Once the roof is fixed in place, secure the building to the floor
Ensure to screw through the framing into the floor bearers.
**18x50mm Screws
**
Step 10
Attach the cover trims to each corner of the building using 3x30mm screws per
cover trim.
12x30mm Screws.
Step 11
Fit the angled fascia block to the apex of the roofs, making sure it is flush
with the roof sheet, securing in place with 4x40mm screws.
Attach the rectangular blocks approximately half way along each roof sheet,
fixing into place with 2x40mm screws per block.
**8x40mm Screws
**
Step 12
Place the veranda floor on the ground flush to the door gable as shown in the
illustration.
* Ensure the veranda floor sits centrally to the building.
Step 13
Align the veranda sides against the door gable and flush to ends of the veranda floor, secure to the building and to veranda floor with 6x50mm screws per side as shown in the illustration.
12x50mm Screws
Step 14
Place the veranda frame underneath the roof overhang, aligning the frame flush
to edge of the veranda rail.
Secure to the veranda rail and to the roof using 3x40mm screws per frame.
* Ensure the framing follows the same direction as the roof.
6x40mm Screws
Step 15
Cut the felt into 3 sheets and lay onto the roof as shown in the illustration
ensuring there is approximately 50mm of overhang around the building.
Fix onto the building using 75x felt tacks at 100mm intervals.
120x Felt Tacks
* _ Felt size: 2333mm_
**
Step 16
Fix the fascias and finials to the building using 6x40mm screws per side,
ensuring to screw
through the boards into the fascia blocks.
**12x40mm Screws
**
Step 17
Attach the door handles to the doors using the 35mm bolts included with the
door handle.
Pre drill a hole approximately 3mm and fix the handle from the inside with the
provided bolts
**4x35mm Bolt
**
Step 18
Fix the presslock to the inside of the master door, making sure to align the
barrel and the key hole.
Secure to the master door with 4x16mm screws.
Ensure the key turns fully without any restrictions.
**4x16mm Screws
**
Step 19
Attach to the barrel bolts to the top and bottom of the slave door using
4x10mm screws per bolt.
Mark the position of the bolt with a pencil on the framing and drill a hole to
site the bolts.
**8x10mm Screws
**
**Step 20
**
Fix the turn buttons into place at the top and bottom of door as shown in the diagram. The turn buttons help to keep the doors alligned during high and low levels of moisture .
**2x16mm Black Screws
**
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Documents / Resources
|
Mercia Garden
Bournemouth
[pdf] Instruction Manual
Bournemouth, 7X7, 03BRN0707-V4
---|---
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>