Mercia Garden OSB Apex Instruction Manual
- June 7, 2024
- Mercia Garden
Table of Contents
General Instructions
01OSBA0806DDFW-V1 & 01OSBA0806DDFW-V1-NW
8X6 OSB APEX
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
– Check the pack and make sure you have all the parts listed.
– When you are ready to start, make sure you have the right tools at hand (not
supplied) including a Phillips screwdriver, Stanley knife, wood saw, step
ladder and drill with 2mm bit.
– Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all-natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre-treated with a water-based treatment**; this only helps to protect the product during transit and for up to 3 months against mould. To validate your guarantee and ensure the longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the first three months of assembly and thereafter in accordance with the manufactures recommendations. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on firm ground, to prevent distortion.
Refer to diagrams for the base dimensions, The base should be slightly smaller
than the external measurement of the building, i.e. The cladding should
overlap the base, creating a runoff for water. It is also recommended that the
floor be at least 25mm above the surrounding ground level to avoid flooding.
TYPES OF BASE
– Concrete 75mm laid on top of 75mm hard-core.
– Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety
and in the case of children’s products independently tested to EN71 level, we
cannot accept responsibility for your safety whilst erecting or using this
product.
Refer to the instructions pages for your specific product code
Please retain the product label and instructions for future reference
All buildings should be erected by two adults
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk.
CAUTION
Every effort has been made during the manufacturing process to eliminate the
prospect of splinters on rough surfaces of the timber. You are strongly
advised to wear gloves when working with or handling rough sawn timber.
Protim Aquatan T5 (621)
Your building has been treated with Aquatan.
Aquaman is a water-based concentrate which is diluted with water, the building
as been treated by the correct application of Aquaman solution and then
allowed to dry.
Aquatan is a decorative finish to colour the wood, which is applied
industrially to timber fence panels and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueous
mixture of sodium dioctyl sulfosuccinate and alcohols: 2, 4,
6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Building content
Pre Assembly
Remove transportation blocks from the bottom of each panel before beginning assembly. Each Panel should have two
Fix the T Hinges onto the doors and door frame as shown. Ensure that the screws go through the cladding and into the framing behind.
28x30mm screws
Step 1
Place the floor on a firm and level base, ensure the base has suitable drainage free from areas where standing water can collect. See the front page for base requirements.
Step 2
Fix the corners with 50mm screws as shown in diagram.
Do not secure the building to the floor until the roof is fitted. Fix the
panels onto the floor using 50mm screws in alignment with the floor joists
Position the panels so there is equal spacing between the floor and cladding
on all 4 sides
Step 3
Fix the corners with 50mm screws as shown in diagram.
Step 4
Place the ridge bar in between the front and back gables. Ensure the top
corners of the ridge bar sit flush with the top points of the door gable. Fix
the ridge bar to the gable using one L bracket for each end.
Fix with 4x20mm screws each
Step 5
Fix two eaves frames to each roof sheet using 3x30mm screws per eave.
Fix the roof sheets to the roof ensuring they come together at the top using
40mm screws directly through the roof sheet at the top. Make sure to attach
the roofs to the ridge bar.
12x 30mm Screws
28x 40mm Screws
Step 6
b Once the roof is fixed attach the building to the floor with 50 mm screws.
Step 7
Cut the felt into 2 sheets at 2490mm and fix onto the roof using felt tacks as shown in diagram ensuring there is 50mm overhang around the sides. Cut the capping felt to 2490mm and fix over the centre of the apex as shown in the diagram ensuring there is 50mm overhang around the sides.
Step 8
Fit the Cover Trims to the front and back of the building as shown in the
illustration using 30mm screws. Trim the length of the cover trims to the
required size before fitting if necessary.
Pre-drill to avoid splitting.
Step 9
Attach the faiscas to the roof leaving a slight overhang at the top.
Fit the fascias to the roof over the felt and secure in place with 40mm screws
as shown.
Pre-drill to avoid splitting.
16x40mm Screws
Step 10
For the no window version go to step 11
Fix the window strips to the two pieces of framing that sit alongside the
outside edges of the window with 3x30mm screws for each strip.
6x30mm Screws
Place the plastic window cill onto the Window Panel and silicone in place as shown on both diagrams to the left.
Fit the styrene sheets on top of the window cill.
When positioning the styrene sheets ensure there is an equal distance between
them and at either side of the windows.
Attach the three window strips at either side of the windows using 3x30mm
screws each. Make sure the screws enter the framing in the window panel and
not the styrene.
9x30mm Screws
Step 11
a First line up the door blocks at the top and bottom of the doors. Then fix
with 2x30mm screws by screwing through the outside of the door into the block.
4x30mm Screws
b Use 4x30mm Screws to fix each beading strip onto the door gable. Ensure that
the screw is parallel with the door frame when fixing the
strip to the door gable as shown in the close-up view.
8x30mm Screws
c Attach the turn button to the top and bottom door blocks with 1x30mm screw
for each one.
2x30mm Black Screws
Step 12
Use 5x20mm screws to fix the door strips to the right hand door.
Note – Door Strips must be attached to right hand door
Use 1x30mm black screw to fix the turn button onto the left hand door.
5 x 20mm Screws
1x 30mm Black Screw
Documents / Resources
|
Mercia Garden OSB
Apex
[pdf] Instruction Manual
OSB Apex, 01OSBA0806DDFW-V1, 01OSBA0806DDFW-V1-NW, 8X6
---|---
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>