Mercia Garden Vermont Summerhouse Instruction Manual
- June 7, 2024
- Mercia Garden
Table of Contents
Mercia Garden Vermont Summerhouse Instruction Manual
General Instruction
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be affected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of
the wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes
cannot be avoided but can be helped. It is suggested that the outdoor building
is sprayed with water during extended periods of warm sunshine and sheltered
as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as
soon as possible and annually to prevent the timber from deteriorating and to
waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings – Require a preservative treatment to protect against
rot and decay and a waterproof treatment to prevent water ingress
Pressure Treated buildings – Require a waterproof treatment to prevent water
ingress
Log Cabins – Are supplied untreated and require a preservative and
waterproofing treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on firm ground, to prevent distortion.
Refer to diagrams for the base dimensions, The base should be slightly smaller
than the external measurement of the building, i.e. The cladding should
overlap the base, creating a run off for water. It is also recommended that
the floor be at least 25mm above the surrounding ground level to avoid
flooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of children’s products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you specific product code
All buildings should be erected by two adults
For ease of assembly, you MUST pilot drill all screw holes and ensure all
screw heads are countersunk.
For ease of assembly, you will need a tape measure to check dimensions of
components.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
CAUTION
Every effort has been made during the manufacturing process to eliminate the
prospect of splinters on rough surfaces of the timber. You are strongly
advised to wear gloves when working with or handling rough sawn timber.
Protim Aquatan T5 (621)
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings.
Aquatanundiluted contains: Boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
03VER0808-V2
Overall Dimensions:
Length| 2411 mm
Width| 2484 mm
Height| 2569 mm
Base Dimension
Length| 2350 mm
Width:| 2360 mm
-
Door Panel
QTY 1
AI-03VERDP2360X2015-V1 -
Window Panel Right
QTY 1
AI-03VERWPR2310X2007-V1 -
Window Panel Left
QTY 1
AI-03VERWPL2310X2007-V1 -
Back Panel
QTY 1
AI-03VERBP2360X2015-V1 -
Gable Top
QTY 2
AI-03VERGT2310X546-V1 -
Floor
QTY 2
AI-03TAGF2360X1175-V1 -
Roof Sheet
QTY 2
PI-03-0242 -
Master Door
QTY 1
AI-03FGMD1720X475-V1 -
Slave Door
QTY 1
AI-03FGD1720X475-V1 -
Side Door
QTY 2
AI-03FGSD475X1720-V1 -
Roof Support Bar – 28 x 28 x 2304mm
FS2828-2304 -
Eaves Frame – 28 x 28 x 1195mm
QTY 4
FS2828-1195 -
Cover Trim – 12 x 40 x 1976mm
QTY 4
S1240-1976 -
Fascia – 12 x 60 x 1333mm
QTY 4
S1260-1333
-
Finial QTY 2
SHED DIAMOND FINIAL -
Rain Guard – 28 x 44 x 680mm
QTY 2
RG2844-680 -
Butt Hinge
QTY 14
PI-07-0066 -
Door Handle
QTY 2
PI-07-0081
-
Barrel Bolt
QTY 6
PI-07-0114 -
Turn Button
QTY 2
PI-07-0034 -
Press Lock
PI-07-0162 -
“L” Bracket
QTY 2
PI-07-0012 -
Door strip- 12 x 60 x 1720mm
QTY 2
S1260-1720 -
Door support framing – 28 x 28 x 2304mm
QTY 1F2744-2304
Nail Bag
-
35mm Bolt QTY 4
-
50mm Screws QTY 70
-
40mm Screws QTY 38
-
30mm Screws QTY 44
-
30mm Black Screws QTY 2
-
25mm Screws QTY 76
-
10mm Screws QTY 38
-
Felt Tacks QTY 110
Pre Assembly
Remove the transportation blocks from the bottom and top of each panel before beginning assembly.
Step 1
Attach the side doors to the inside framing of the door panel using 3x butt
hinges per door.
- Fix to the door using 3x25mm screws & 3x30mm screws to the framing per hinge, ensure the doors open freely, folding back into the building unrestricted.
18x25mm Screws
18x30mm Screws
Fix the hinge flaps to the inside of the doors.
Step 2
Fix the master and slave door to the attached side doors with 8x butt hinges, using 6x25mm screws per hinge.
- Ensure the doors open freely, folding back into the building unrestricted.
48x25mm Screws
Step 3
Secure the barrel bolts to the top & bottom of each side door and the slave door using 6 x 10 mm screws.
Attach the press lock to the master door with 4x25mm screws, aligning the barrel with the key hole.
- Ensure the key turns and locks properly before fixing to the door.
Fix the door handles to the outside of the master and slave door using
the 35mm bolts provided.
35mm bolts provided.
36x10mm Screws
4x25mm Screws
4x35mm Bolts
Step 4
Place the floor panels upside down onto a firm and level base. Ensure the base has suitable drainage, free from areas where standing water can collect.
Secure the floors together using 8 x 50 mm screws through the floor bearers in an alternating pattern.
Once fixed together turn the floor back the right way up.
8x50mm Screws
Step 5
- A. Fix the corners with 50mm screws as shown in the illustration.
- B. Do not secure the building to the floor until the roof fitted.
3x50mm Screws
Step 6
- A. Fix the corners with 50mm screws as shown in the illustration.
- B. Do not secure the building to the floor until the roof fitted.
9x50mm Screws
Step 7
Place the gable tops onto the window panels, ensuring the boards interlock.
Secure in place using 4x50mm screws per gable top, screwing in an alternating
pattern.
**8x50mm Screws
**
Step 8
Attach the “L” brackets to each end of the ridge bar with 2x25mm screws per
bracket.
- Ensure the brackets are flush with the ends of the ridge bar.
Align the ridge bar between the gables and secure to the central uprights with
2x25mm screws per bracket as shown in the illustration.
8x25mm Screws
Step 9
Attach 2x eaves frames to the long side of each roof sheet, ensuring the
frames are flush to the edges, securing in place with 3x30mm screws per frame.
Place each roof sheet onto the building and fix into place using 12x40mm
screws per roof.
12x30mm Screws
24x40mm Screws
Step 10
B. Secure the building to the floor using 36x50mm screws.
- Ensure to screw through the framing into the floor bearers.
36x50mm Screws
Step 11
Cut the felt into 3 strips of 2500mm length and place onto the roof, as shown
in the illustration.
- Ensure there is approximately 50mm overhang of felt around all sides of the building.
Fix into place using 110x felt tacks at 100mm intervals.
110x Felt Tacks
Step 12
Screw the cover trims to each corner of the building with 3x30mm screws per
trim.
12x30mm Screws
Step 13
Attach the fascia’s and finial’s to the the front and back of the building
using 12x40mm screws.
12x40mm Screws
Step 14
Fix the rain guards above each window, securing in place using 2x50mm screws
per guard, ensuring to screw through the framing.
4x50mm Screws
Step 15
Place the Door support bar (No. 24) to the inside of the door panel as
displayed on the pictures.
This framing will meet at each side panel as show in image 2.
The 44mm side of the framing should sit against the inside of the door panel,
matching the width of the door frame timber.
- Ensure that the framing is attached in a straight line matching the line of the top of the door frame.
- Please be aware this piece of framing may need to be adjusted to length by customer in regards of building tolerances. This piece of framing should fit tightly between the two side panels.
Before
Step 16
Screw through the side panel externally in line with the 2 x 1 framing using 1 x 70mm screw in either side to secure the framing in place.
Screw through the front panel externally with 4 x 70mm screws equally spaced a part along the door frame to secure the 2 x 1 framing to the panel.
- Please ensure you pre-drill prior to screwing into the panel to eliminate the chances of the timber splitting.
A. Drill 3 x 6mm holes into the
2 x 1 framing in line with your barrell bolts. These will act as the catch for
the barrell bolts at the top of your door.
- Ensure the holes are drilled in to the 2 x 1 framing attached in step 15 as oppose to the door frame.
After
Step 17
Attach the two turn buttons to the slave door at the top and bottom using 2x30mm black screws.
2x30mm Black Screws
- These turn buttons help to keep your doors straight during high & low levels of moisture content in the air.
Step 18
Attach a strip to the hinged side of the middle opening doors.
These strips allow you to adjust the doors allowing for moisture absorbtion
and reduction.
6x30mm Screws
Step 19
It is recommended that after the construction, treatment and the removal of the protective window cover that sealant is used to keep the building weather tight.
References
Read User Manual Online (PDF format)