dams Welcome Reception Desk Instruction Manual

June 7, 2024
dams

dams Welcome Reception Desk Instruction Manual

Tools Required for Assembly

Don’t Structure 2 Man Lift

Always Handle Items with Care

If Unsure Call for Assistance

Keep Fittings Away from Children

iconPlease check that you have all the fittings!

  • 2 x Fittings Bags Supplied
  • 1 in Carton 3 – WD14/16DT
  • 1 in Carton 4 – WDLP

Fitting Bag 1
RM-FIT254

  1. M6x16mm Connect Bolt
    RM-SY0622

  2. 3/4 x 14mm Screw
    RM-SCR04

  3. M8 Gesipa Insert
    RM-PAR03

Fitting Bag 2
RM-FIT240

  1. 15mm Cam
    RM-CAM03

  2. 34mm Minifix Bolt
    RM-BLT07

  3. M8 Gesipa Insert
    RM-NUT04

  4. M6 Nylon Insert 25mm Adjustable Foot
    RM-PAR05

  5. 17mm Adhesive Cover Cap
    RM-CAP07

  6. 25mm Adjustable Foot
    RM-FRL19

If you are assembling this unit with a D-End extension table please refer to the WDET assembly instruction before proceeding with step 1

diagram, engineering drawing

diagram

diagram

Prepare the panels by inserting the listed fittings into the corresponding holes.

  1. diagram

  2. diagram
    Prepare the panels by inserting the listed fittings into the corresponding holes.

  3. diagram

  4. diagram

  5. diagram

  6. diagram

  7. diagram

  8. diagram

  9. diagram

  10. diagram, schematic
    Join the panels together and tighten all cam fittings.


  11. Join the panels together and tighten all cam fittings

    1. graphical user interface **
      Join the panels together and tighten all cam fittings.

**

  1. If you are assembling this unit with a D-End extension table please refer to the WDET assembly instruction before proceeding with step 18.

diagram

  1. diagram

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals