dams Contract Straight Desk Instructions

June 7, 2024
dams

dams Contract Straight Desk Instructions

Installation instruction

Installation instruction

Installation instruction

Installation instruction

Installation instruction

Installation instruction

Before disposing of any packing please check that you have all the fitting

what is in the box

  • (1) 4mm Allen Key
    RM-ALK01
    4mm Allen Key

  • (4) Nylon M6x10 Socket
    RM-PAR05

  • (4) Adjustable foot Dia 25mm
    RM-FRL19
    Adjustable Foot Dia 25mm

  • Ferrul 40×25
    RM-FRL25 (Silver – CKFSS)
    or
    RM-FRL09 (Graphite – CLFSG)

  • Confirmat Screw 70mm
    RM-CFM02 (Black – CLFSG)
    or
    RM-CFM04 (Zinc – CLFSS)
    Confirmat screw 70mm

  • Connect Bolt M6x50mm
    RM-BLT05
    Connect bolt M6x50mm

  • Ferrul 60×25
    RM-FRL33 ( Silver – CLFSS)
    RM-FRL39 ( Graphite – CLFSG)

Cable Port Supplied with Desk Top
Cable Port Supplied with Desk Top

Cable port supplied with desk top

  1. Installation
  2. Installation
  3. Installation
  4. Installation
  5. Installation
  6. Installation
  7. Installation
  8. Installation
  9. Installation

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

dams User Manuals

Related Manuals