Dams Adapt II Drop Down Cable Tray Instructions
- June 7, 2024
- dams
Table of Contents
Dams Adapt II Drop Down Cable Tray Instructions
What is in box?
Step 1
Attach the drop down cable tray to the desk frame by positioning the brackets into the slots on the inside face of the beams.
Step 2
Lift up the cable tray to the horizontal position and slide the bracket into
the cut out slots on the internal face of the beam as shown below.
2a
Step 3
Your cable tray is now in position and Is ready to be loaded up with cables. The slots and cut outs offer mounting points for cable ties to hold your cables in place, segregation can be achieved by mounting wires In different sections of the tray.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>