FREEDOM Wellington 6×6 Semi-Privacy Panel Installation Guide
- June 7, 2024
- FREEDOM
Table of Contents
FREEDOM
Wellington 6×6 Semi-Privacy Panel
Installation Guide
READ INSTRUCTIONS PRIOR TO INSTALLATION
WARNING:
- Improper installation of this product can result in personal injury. Always wear safety goggles when cutting, drilling and assembling the product.
- Incorrect installation may cause harm to the product or individual.
NOTICE:
- DO NOT attempt to assemble the kit if parts are missing or damaged.
- DO NOT return the product to the store, for assistance or replacement parts call: 1-800-336-2383.
TOOLS/MATERIALS NEEDED:
- Posts
- Post Hole Digger/Shovel
- Concrete
- Coarse Gravel (6″ per hole)
- Line Stakes with String
- Safety Glasses
- Hacksaw or Chopsaw
- Drill
- 1/8″ Drill Bit
-
2 Square Drive Bit
- Level
- Pencil
- Tape Measure
- Glue
- (2) 2″ Wood Spacer Blocks
NSTALLATION
1. Fence Location:
Mark the fence location using string and line stakes (Fig. 1).
2. Post Location:
Measure the width of the fence panel (X) plus 3⁄8″ for brackets.
Then measure the width of the post (Y) (Fig. 2). Add these measurements
together. This is the on-center
measurement for post hole location.
3. Post Installation:
Dig first two post holes 10″ in diameter down to your specified frost line.
Insert filler/gravel into the
bottom of both holes and then set first post in post holes. Add wet or dry
concrete mix according to the
manufacturer’s instruction to the top of the hole for first post only and
level it.
Example: When your frost line is 36″ insert 12″ of gravel/filler and 24″
of post with concrete surrounding.
Diameters based on post size:
10″ for 5″ x 5″ post
8″ for 4″ x 4″ post
4. Rail Bracket Location:
a. If you are installing with Set & Secure™ Bracket Kit, measure 23⁄4″
down from the top center of the post and mark it. This is the location for the
Set screw (Fig. 4). Pre-drill and install Set screws as anchors to hang the
panel from.
Set screws are only needed for top rail brackets.
b. If you are installing with aluminum brackets, measure down 2″ from the
top center of the post and mark it. This location marks the top of the top
aluminum bracket. Measure remaining rails and mark for the respective bracket
locations (Fig. 5). For more details, see aluminum bracket instructions.
5. Add Set & Secure™ Brackets to Panels:
Slide brackets onto each rail of the panel. Pre-drill and secure with provided
screws (Fig. 6).
6. Hang Panel With Set & Secure™ Brackets:
Hang the panel on the screws between the posts. To help stabilize the panel,
use wood spacer blocks
under panel and check alignment with a level (Fig. 7).
7. Attach Panel With Set & Secure™ Brackets:
Next, install the remaining screws for the brackets into the posts (Fig. 8).
8. Finishing Covers for Set & Secure™ Brackets:
Add decorative bracket covers to all brackets installed (Fig. 9).
Attach post tops to posts with glue (Fig. 10).
NOTE:
*Varied Terrain Installation:
The Set screw position and post heights may require adjustment depending on
your varied terrain (Fig. 11).
BARRETTE OUTDOOR LIVING
7830 FREEWAY CIRCLE
MIDDLEBURG HEIGHTS, OHIO 44130
TEL: 800-336-2383 •
WWW.FREEDOMPRODUCT.COM
To register your product, please visit: FreedomProduct.com
To obtain and review a copy of the warranty please go to:
Freedomproduct.com/warranty.
You can also contact 1.888.418.4400 or write to Freedom Outdoor Living,
7830 Freeway Circle, Middleburg Heights, Ohio 44130 to obtain a copy of the
warranty.
References
- Fencing, Railing & Accents - Freedom Outdoor Living for Lowes
- Freedomproduct.com/warranty
- Aluminum & Vinyl Fence, Aluminum Rail, Yard Accents - Freedom Outdoor Living for Lowes
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>