ULINE H-2267 Multi-Deck Paper Cutter Installation Guide

June 7, 2024
ULINE

ULINE H-2267 Multi-Deck Paper Cutter Installation Guide

TOOL NEEDED

  • 7/16″ Wrench

PARTS INCLUDED

  • 1/4-20 x 1/” Hex Head Grade 5 Bolt x 4

  • 1/4″ Flat Washer x 4

  • 1/4-20 Keps Hex Nut x 4

  • Dowel x 2 (2-Roll Holder) x 3 (3-Roll Holder) x 4 (4-Roll Holder)

  • Foot x 2

ASSEMBLY

  1. Fasten the two feet onto the frame of the tower as shown in the illustration below by using four bolts, nuts, washers and lockwashers.
  2. Rest the dowels in the dowel sockets.
    Assembly Induction

PAPER ROLL MOUNTING INSTRUCTIONS

HOW TO LOAD AND DISPENSE THE ROLL

  1. Make sure both ends of the roll are plugged with cores. (See Figure 1)

  2. Thread dowel through one end of the roll until it protrudes out of the other side. **(See Figure 2)

**

  1. To position roll on the paper cutter, rest the dowel in the dowel sockets with the roll unspooling downward under the straight edge blade. (See Figure 3)
    PAPER ROLL MOUNTING INSTRUCTIONS

  2. Pull paper to the desired length and tear against the straight edge blade. (See **Figure 4)

**

Contact Us

Phone: 1-800-295-5510
Web: uline.com

Uline Company Logo

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals