Edge-corE ECS4130-28T 28-Port Gigabit Switch User Guide

June 6, 2024
Edge-core

Edge-corE logo

Edge-corE ECS4130-28T 28-Port Gigabit Switch

Edge-corE ECS4130-28T 28-Port Gigabit Switch featured

28-Port Gigabit Switch
ECS4130-28T | ECS4130-28T-DC

vwww.edge-core.com

Package Contents

  1. ECS4130-28T or ECS4130-28T-DC

  2. Rack mounting kit — 2 brackets and 8 screws

  3. Console cable — RJ-45 to D-Sub

  4. Power cord (ECS4130-28T only)

  5. DC connector plug (ECS4130-28T-DC only)

  6. Adhesive foot pads

  7. Documentation — Quick Start Guide (this document) and Safety and Regulatory Information

Overview

  1. 24 x RJ-45 1 GbE ports

  2. 4 x SFP+ 10 GbE ports

  3. RJ-45 Console port

  4. USB Management portc

  5. AC power socket (ECS4130-28T) or DC terminal (ECS4130-28TDC)

  6. Grounding point

Front LEDs

  1. RJ-45 Port LEDs
    • 1G Link/Activity — Green
    • 10/100 Mbps — Amber
  2. SFP+ Port LEDs:
    • 10G Link/Activity — Green
    • 1G Link/Activity — Amber
  3. System LED:
    • SYS LED — Green (OK), Amber (fault)

Installation

Warning : For a safe and reliable installation, use only the accessories and screws provided with the device. Use of other accessories and screws could result in damage to the unit. Any damages incurred by using unapproved accessories are not covered by the warranty.
Caution : The device must be installed in a restricted-access location.
Note : The drawings in this document are for illustration only and may not match your particular model.

Mount the Switch

Attach the Brackets
Attach the brackets to each side of the switch using the included screws.

Ground the Switch

Ground the Switch
Attach a #18 AWG stranded copper wire to the grounding terminal on the switch, and the other end to the rack grounding point.

Connect Power

Connect AC Power
Connect the ECS4130-28T AC power socket to an AC power source.

Mount the Switch
Use the screws and cage/clip nuts supplied with the rack to secure the switch in the rack.

Connect DC Power
The ECS4130-28T-DC requires an external 36 V to 60 V DC power source connected to its DC terminal block.

Caution : Use a UL/IEC/EN 60950-1 certified power supply to connect to a DC converter.
Attention : Utilisez une alimentation certifiée UL/IEC/EN 60950-1 pour connecter à un convertisseur CC.

Make Network Connections

RJ-45 Ports
Connect Category 5e or better twisted-pair cables (UTP or STP is required) to the RJ-45 ports on the switch.

SFP+ Ports
Install transceivers and then connect fiber optic cabling to the transceiver ports. Alternatively, connect DAC/AOC cables directly to the SFP+ ports.

Make Management Connections

Console Port
Connect an RJ-45 to DE-9 straight-through console cable and then configure the serial connection: 115200 bps, 8 characters, no parity, one stop bit, 8 data bits, and no flow control.

Hardware Specifications

Switch Interfaces

Management       1 x RJ-45 Console port
1 x USB Management port

Network              24 x 1 GbE RJ-45 ports
4 x 10 GbE SFP+ ports

Switch Chassis

Size (WxDxH)     330 x 230 x 44 mm (13 x 9.1 x 1.7 in)
Weight                 2 kg (4.41 lb)
Operating
Temperature        0° C to 45° C (32° F to 113° F)
Storage
Temperature       -40° C to 70° C (-40° F to 158° F)
Humidity            Operating: 5% to 90% (non-condensing) Storage: 5% to 95% (non-condensing)
Power
Consumption      3 Watts maximum

ECS4130-28T

AC Input            100 to 240 VAC, 50-60 Hz, 0.9 A

ECS4130-28T-DC

DC Input           36 V to 60 V, 2 A Max

Regulatory Compliances

Emissions

  • EN 55032:2015+A11:2020
  • EN 61000-3-2:2014
  •  EN 61000-3-3:2013+A1:2019
  •  AS/NZS CISPR32 2015 A1: 2020
  •  ICES-003 Issue 7 Class A
  •  FCC Part 15 subpart B Class A

Immunity

  • EN 55024:2010+A1:2015
  • EN 55035:2017+A11:2020
  • IEC 61000-4-2/3/4/5/6/8/11

Safety

  • UL (CSA 22.2 No 62368-1 & UL62368-1)
  • CB (IEC/EN60950-1 & IEC/EN 62368-1)

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Edge-core User Manuals

Related Manuals