GOODWE DNS Series Dual-MPPT Single Phase Solar Inverter Gw4200d-Ns Installation Guide

June 6, 2024
GOODWE

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns -
logo GOODWE DNS
Series Dual MPPT Single Phase Solar Inverter Gw4200d NsDNS
Quick Installation Guide
Ver.1.2
2021-08-16

 Safety Precautions

General Disclaimer

  • The information in this quick installation guide is subject to change due to product updates or other reasons. This guide cannot replace the product labels or the safety precautions in the user manual unless otherwise specified. All descriptions here are for guidance only.
  • Before installations, read through the quick installation guide and the user manual to learn about the product and the precautions.
  • All installations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety regulations.
  • Check the deliverables for correct model, complete contents, and intact appearance. Contact GoodWe if any damage is found or any component is missing.
  • Use insulating tools and wear personal protective equipment when operating the equipment to ensure personal safety. Wear anti-static gloves, clothes, and wrist strips when touching electron devices to protect the inverter from damage.
  • Strictly follow the installation, operation, and configuration instructions in this guide and user manual. GoodWe shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more warranty details, please visit http://www.goodwe.com.

Safety Disclaimer

Warning
DC Side:

  1. Ensure the component frames and the bracket system are securely grounded.

  2. Connect the DC cables using the delivered DC connectors and terminals. GoodWe shall not
    be liable for the equipment damage if other connectors or terminals are used.

  3. Ensure the DC cables are connected tightly and securely.

  4. Measure the DC cable using the multimeter to avoid reverse polarity connection. Also, the
    voltage should be under the permissible range (≤600V).

AC Side:

  1. The voltage and frequency at the connecting point should meet the on-grid requirements.
  2. An additional protective device like the circuit breaker or fuse is recommended on the AC side. Specification of the protective device should be at least 1.25 times the AC  output rated current.
  3. PE cable of the inverter must be connected firmly. The resistance between the neutral wire and the earth cable is less than 10Ω.
  4. You are recommended to use copper cables as AC output cables. Contact GoodWe if you want to use aluminum cables.

Inverter Side:

  1. Terminals at the bottom of the inverter cannot bear much load. Otherwise, the terminals will be damaged.
  2. All labels and warning marks should be clear after the installation. Do not scrawl, damage, or block any label on the device.
  3. Warning labels on the inverter are as follows.

| High voltage hazard. Power off the inverter first before any operations.| | Potential risks exist. Wear proper PPE before any operations.
---|---|---|---
| Read through the guide before any operations.| | Delayed discharge. Wait until the components are totally discharged after power off.
| High-temperature hazard. Do not touch the equipment to avoid being burnt.|

N/A

| N/A

Product Introduction

Parts
GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
1

1. PV Input Terminal| 2. DC Switch| 3. WiFi/4G/LAN/GPRS Communication
Module Port or RS485 Communication Cable Port
---|---|---
4. DRED/CT/Remote Shut down Communication Cable Port| 5. AC Output Terminal| 6. Indicator
7. LCD| 8. Button| 9. PE Terminal
10. Mounting Plate| 11. Heat Sink|

Dimensions

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
2

Inverter Installation

PackageGOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d
Ns - figure 3

  • Number of expansion bolts, screws, and terminals are various depending on the different inverters. The actual accessories may differ.
  • Communication module types: WiFi/4G/LAN/GPRS etc. The actual module delivered depends on the communication method of the selected inverter.
  • 2PIN terminal is used to connect CT communication cable.

Space Requirements

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
4

Angle Requirements

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
5

Installing the Inverter
Avoid the water pipes and cables buried in the wall when drilling holes.GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns -
figure 6

Electrical Connection

Connecting the PE Cable

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
7

Connecting the AC Cable

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
8

The two types of AC connectors will be delivered randomly. The actual connector may differ.
Type One AC Connector

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
9

Type Two AC Connector

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
10

Connecting the DC Cable

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
11

Connecting the DRED/Remote Shutdown Communication Cable (Optional)
Contact the after-sales service to get the DRED terminal if you need to use the DRED function.
DRED function is off by default. Start this function via SolarGo App if it’s needed.

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
18

Connecting the CT Communication Cable (Optional)

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
19

Note: Connect the CT using two cables. Connect CT+ to the CT+ port of the inverter, and CT- to the CT- port of the inverter. The color of the CT+ cable can be white, black and white, or red. The color of the CT- cable is black. Connect the CT cable properly, otherwise, the CT cannot work.

Connecting the RS485 Communication Cable(Optional)

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
20

Installing the Communication Module(Optional)
The appearance of communication moduels is slightly different. But the modules are installed in the same way. The following figure shows you how to install a WiFi module.
GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
21

Check before Power-on.

No. Check Item
1 The inverter is firmly installed in a clean place where is well-ventilated

and easy to operate.
2| The PE cable, DC input cable, AC output cable, and communication cable are connected correctly and securely.
3| Cable ties are routed properly and evenly, and no burrs.
4| Unused ports and terminals are sealed.
5| The voltage and frequency at the connection point meet the grid-tied requirements.

Power On

  1. If it displays Select Country/Region on the LCD when you power on the equipment for the first time, you can set the safety country via the LCD or SolarGo APP. For more details, refer to the Commissioning part. For other settings, please refer to the user manual.
  2. Observe the indicators to check the inverter status. If any fault exists, please refer to the Troubleshooting part in the user manual.

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - qr
code DNS Series User Manual
https://en.goodwe.com/Public/Uploads/sersups/DNS%20Series%20User%20Manual%20V1.0-EN.pdf

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
22

Indicator Status Description
Power ![GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns -

icon 5](https://manuals.plus/wp-content/uploads/2021/12/GOODWE-DNS-Series- Dual-MPPT-Single-Phase-Solar-Inverter-Gw4200d-Ns-icon-5-300x47.png)| Steady Yellow|  Power on
| Single Yellow Blinking| WiFi module reset or restore
| Double Yellow Blinking| Not connected to the router
| Quadra Yellow Blinking| Not connected to the monitoring website
| Yellow Blinking| RS485 communication normal
……………………………………| Off| The WiFi module is restoring factory settings.
| | Steady Green| The power grid is working normally and on-grid.
………………………………………..| Off| Off grid
| | Steady Red| System error
……………………………………….| Off| No error

Commissioning

Commissioning via LCD

  1. Select the right safety country accordingly.
    GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
23

  2. Wait for 20s, the inverter will automatically set the safety country and back to the standby page.

Commissioning via SolarGo APP

Note

  1. Search for “SolarGo APP” in Google Play or App Store
  2. Operation steps are the same for the Android system and iOS systems, although the two interfaces are slightly different. The introduction here is based on the Android system.
  3. Log in using the initial password for the first time and change the password as soon as possible. To ensure account security, you are advised to change the password periodically and keep the new password in mind.

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - qr code
5http://www.sems.com.cn/home/solargo

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - figure
24

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - qr code
3| GOODWE
DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - qr code
4| GOODWE
DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns - qr code
5
---|---|---
https://www.semsportal.com/home/AppDownload| https://en.goodwe.com/| http://www.sems.com.cn/home/solargo

GOODWE DNS Series Dual MPPT Single Phase Solar Inverter Gw4200d Ns -
barcode 340-00595-00
JIANGSU GOODWE POWER SUPPLY TECHNOLOGY CO., LTD
No. 90 Zijin Rd., New District, Suzhou, 215011, China
www.goodwe.com
service@goodwe.com

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals