Edge-corE AS9926-24D/AS9926-24DB Network Fabric Switch User Guide

June 6, 2024
Edge-core

Edge-corE AS9926-24D/AS9926-24DB Network Fabric Switch

Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch

Package Contents

Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig1

  1. Network Fabric Switch
  2. Rack mounting kit—2 front-post brackets, 2 rear-post brackets, 20 screws, and 2 ear-locking screws
  3. Power cord
  4. Ring lugs (x4) (included with DC PSUs only)
  5. Console cable—RJ-45 to DE-9
  6. Documentation—Quick Start Guide (this document) and Safety and Regulatory Information

Overview

Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig2

  1. System LEDs

  2. 24 x 400G QSFP-DD ports

  3. Management ports: 1 x 1000BASE-T RJ-45, 2 x 10G SFP+, RJ-45/USB console, USB

  4. Product label
    Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig3

  5. 2 x AC/DC PSUs

  6.  6 x fan trays

  7. 2 x grounding screws

System LEDs/Buttons

SYS/LOC: Flashing Amber (switch locator)
DIAG: Green (OK), Amber (no OS or fault)
FAN: Green (OK), Amber (fault)
PSU1/PSU2: Green (OK), Amber (fault)
RST (reset) Button

Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig4

Port LEDs

QSFP-DD LEDs
400G: 1 LED Blue
SFP+ 10G OOBF LEDs
Green (10G)
Amber (1G)
RJ-45 MGMT LED
Green (link/activity)
Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig5

FRU Replacement

PSU Replacement

  1. Remove the power cord.
  2. Press the release latch and remove the PSU.
  3. Install replacement PSU with matching airflow direction.

Fan Tray Replacement

  1. Pull the handle release latch.
  2. Remove fan tray from the chassis.
  3. Install replacement fan with matching airflow direction.

Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig6

Installation

Mount the Switch

Caution: This device must be installed in a telecommunications room or a server room.
Attention: Cet appareil doit être installé dans une salle de télécommunication ou une salle de serveur.

  1. Attach the Brackets
    Use the included screws to attach the front- and rear-post brackets.
    Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig9

  2. Mount the Switch
    Mount the switch in the rack and secure it with rack screws.
    Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig10

  3. Lock the Rear-Post Brackets
    Use the included screws to lock the position of the rear-post brackets.
    Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig7

Optional Slide-Rail Installation
An optional slide-rail kit is available for rack installation. Follow the installation procedure provided with the kit.
Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig8

Ground the Switch

Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig11

Verify Rack Ground
Ensure the rack on which the switch is to be mounted is properly grounded and in compliance with ETSI ETS 300 253. Verify that there is a good electrical connection to the grounding point on the rack (no paint or isolating surface treatment).

Attach Grounding Wire
Attach a lug (not provided) to a #12 AWG minimum grounding wire (not provided), and connect it to the grounding point on the switch rear panel. Then connect the other end of the wire to rack ground.

Connect Power

Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig13

Install one or two AC/DC PSUs and connect them to an AC or DC power source.

Caution: Use a UL/IEC/EN 60950-1 certified power supply to connect to a DC converter.
Attention: Utilisez une alimentation certifiée UL/IEC/EN 60950-1 pour le connecter à un convertisseur CC.
Caution: All DC power connections should be performed by a qualified professional.
Attention: Toutes les connexions d’alimentation CC doivent être effectuées par un professionnel qualifié.

  1. Use the ring lugs included with the DC PSU.
  2. DC return
  3. -40 – -75 VDC
  4.  Ground

Make Network Connections

Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig12

QSFP-DD Ports
Install transceivers and then connect fiber optic cabling to the transceiver ports.
Alternatively, connect DAC or AOC cables directly to the QSFP-DD slots.

Make Management Connections

Edge-corE AS9926-24D AS9926-24DB Network Fabric Switch
fig14

10/100/1000M RJ-45 Management Port
Connect Cat. 5e or better twisted-pair cable.
10G SFP+ Management Ports
Install transceivers and then connect fiber optic cabling to the transceiver ports.
RJ-45 Console Port
Connect the included console cable and then configure the serial connection: 115200 bps, 8 characters, no parity, one stop bit, 8 data bits, and no flow control.

Hardware Specifications

Switch Chassis

Size (WxDxH) 438.4 x 536 x 43.1 mm (17.26 x 21.1 x 1.7 in.)
Weight 10.77 kg (23.74 lb), with 2 PSUs and 6 fans installed
Temperature Operating: 5° C to 40° C (41° F to 104° F)   Storage: -40° C to 70° C (-40° F to 158° F)
Humidity
Operating: 5% to 95% (non-condensing)
Power Consumption 1300 Watts maximum

AC PSU

Input Power 100–120 VAC, 50–60 Hz, 12 A max.
Rating 200–240 VAC, 50–60 Hz, 7.5 A max.
190–310 VDC, 8–5 A

48 VDC PSU

Power Rating 48 VDC, 1300 Watts
DC Input -40 V – -75 V, 40 A maximum

Regulatory Compliances

Emissions EN 55032:2015+AC:2016, Class A
EN 61000-3-2:2014, Class A
EN 61000-3-3:2013
FCC Class A
VCCI Class A
CCC GB 9254-2008, Class A
BSMI CNS13438-1

Immunity EN 55024:2010+A1:2015
IEC 61000-4-2/3/4/5/6/8/11
EN 55035:2017

Safety UL   (CSA 22.2 No 62368-1 & UL62368-1)
CB (IEC/EN60950-1 & IEC/EN 62368-1)
CCC GB4943.1-2011
BSMI CNS14336-1