TCP Snap-In Downlights Installation Guide

June 6, 2024
TCP

TCP logo

TCP Snap-In Downlights

WARNING! RISK OF ELECTRIC SHOCK! DISCONNECT POWER AT FUSE OR CIRCUIT BREAKER BEFORE INSTALLING OR SERVICING!

STEP #1
POWER OFF
TURN OFF POWER AT CIRCUIT BREAKER to prevent risk of electric shock.

STEP #2
Allow adequate space in ceiling cavity for heat dissipation. Height of cavity should be at least 60mm (2.4”)

STEP #3
Carefully make a fixture installation hole in the ceiling using a drywall saw.

STEP #4
Have qualified Electrician install supplied electrical box.

STEP #5
Connect male electrical lead from the downlight with the female lead from the electrical box.

STEP #6
Once inserted, make sure the connection is secure by twisting until tab is locked in slot.

STEP #7
Hold to clip springs vertically, and slowly insert the fixture into the hole in the ceiling. The fixture will be successfully installed when it is flush against the ceiling.

STEP #8
POWER ON
Restore power to recessed fixture at circuit breaker. Enjoy energy-efficient LED lighting, and up to 80% energy savings vs. equivalent incandescent bulbs.

TCP®
325 Campus Dr. | Aurora, Ohio 44202 | P: 800-324-1496 | tcpi.com
©TCP SEP 2020/WF218700

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals