RANGER DESIGN C5-PA18-8 Partskeeper Cabinet Installation Guide

June 6, 2024
RANGER DESIGN

Ranger Design Logo

RANGER DESIGN C5-PA18-8 Parts Keeper Cabinet

RANGER DESIGN C5-PA18-8 Partskeeper Cabinet

REQUIRED ITEMS

  • 2 Persons
  • Cordless Impact
  • Cordless Drill
  • Tape Measure
  • Marker
  • 1/2″ Socket
  • 1/2″ Drill Bit w/ Drill Collar (Set at 1/2″)
  • 3/8″ Driver Bit
  • Knife
  • Plusnut Tool / Plusnut Gun (5/16″)

ASSEMBLY

SETUP

Unpack components; compare with the bill of materials.

Verify all parts are present.

Item No. Description Qty.
40 – 715 Bracket Head 4
40 – 716 Bracket Arm 4
50 – 712 Floor Bracket 2
50 – 760 Parts keeper Rail 2
50 – 7011 End Panel ( Left ) 1
50 – 7012 End Panel ( Right ) 1
62-U5079 Plastic Parts keeper Case 8
60 – 11.875 × 17.5 Shelf Tray, Black Plywood, Usable 12″ × 19.5″ 1
94 – 5023 Assembly Fastener Kit 1
96 – 5023 Install Fastener Kit 1
SHELF ASSEMBLY

Attach both panels to the shelf trays.
IMPORTANT: Assemble the parts keeper on a protected clean surface to avoid scratching.

TOOLS

  • Cordless Impact
  • 3/8″ Driver Bit

Attach 2 bottom brackets to the end panels.

Attach 1 parts keeper rail on the bottom of each end panel.

INSTALLATION

ATTACH WALL BRACKETS TO THE END PANELS

IMPORTANT: For all Box Trucks, make sure that the shelving is securely fastened to the structure of the truck.

  • Lift the assembled parts keeper cabinet to the vehicle, then put it in place.
  • Attach the wall brackets to the panels aligning the brackets to the horizontal rim of the vehicle.
MARK HOLES FOR PLUS NUTS

After attaching the brackets mark the holes on the brackets and bottom shelf to the vehicle.

MARK HOLES FOR PLUS NUTS 01

ATTACH PLUS NUTS
  • Lift the assembled parts keeper cabinet on the side.
  • Drill all the marks using 1/2″ drill bit w/ drill collar, then attach plus nuts to the holes.

NOTE: Use 1/2″ drill bit with drill collar to stop drill at 1/2″ depth.
WARNING: Before drilling, ensure that you will not hit any critical parts of the vehicle like the Gas tank, Wiring Harness and Hose.

ATTACH PLUS NUTS 01

How to attach plus nut.

  • USING PLUSNUT GUN
    STEP: Put the plusnut on the plusnut gun, then attach the plus nut in the hole by turning the gun forward until the plus nut locks, then remove the gun by turning in reverse.

  • USING THE 6491 PLUSNUT TOOL
    NOTE: The hardware used for the 6490 plusnut tool is not included in the fastener bag. The 6490 plusnut tool can be ordered separately upon demand at no charge.
    STEP 1: Assemble the 6491 plusnut tool with the hardware needed, plus nut and the 9/16″ wrench as shown.
    STEP 2: Attach the plus nut in the hole by turning the bolt forward using an impact with a 1/2″ socket until the plusnut locks, then remove the bolt by turning the impact in reverse.
    using the 6491 plusnut tool 02

ATTACH PARTSKEEPER CABINET UNIT TO THE FLOOR

WITHOUT RANGER FLOOR
Put the assembled parts keeper cabinet back in place aligning the holes to the plusnuts, then install the bottom shelf to the plus nuts.

WITH RANGER FLOOR

  • Lift the parts keeper cabinet inside the van, then put it in place.
  • Mark the 2 holes of each floor bracket, then place the parts keeper cabinet on the side.
  • Drill the marks on the floor using 1″ hole saw, then drill holes into the van floor for plus nut.
  • Attach plus nut in the van floor, then lift the parts keeper cabinet back in place, and attach the floor bracket to the plus nut.

with ranger floor 01

ATTACH WALL BRACKETS

WITHOUT RANGER WALL KITS
Align the wall brackets to the plus nuts, then install the wall brackets to the wall.
NOTE: Tighten the bolts that attach the bracket to the wall or wall rails 1st before tightening the bolts from the brackets to the end panels.
IMPORTANT: After installation is completed, ensure all bolts are tightened.

WITH RANGER WALL KITS
Aligned the wall brackets to the wall mounting track kits, then install the wall brackets to the wall mounting track kits using channel nuts.
NOTE: Tighten the bolts that attach the bracket to the wall or wall rails 1st before tightening the bolts from the brackets to the end panels.
IMPORTANT: After installation is completed, ensure all bolts are tightened.

IMPORTANT: After checking all bolts are tightened slide 8 parts keeper case to the cabinet.

Completely Installed

For any feedback or suggestions you may have, please contact:
cs@rangerdesign.com
For technical support, contact at 1-800-565-5321

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

RANGER DESIGN User Manuals

Related Manuals