ZigBee 2-Gang In-wall Switch Instructions
- June 6, 2024
- zigbee
Table of Contents
ZigBee 2-Gang In-wall Switch
Important:
Read All Instructions Prior to Installation
Function introduction
2 channels switch input, to control 2 channels load separately
“Reset” Key: for network pairing, touchlink, factory reset of the switch
2 channels load output
AC power input
LED indicator: stays off if the device is not added to a Zigbee network, stays
solid on after the device is added to a network. Same indication as connected
load when commissioning the device: network pairing, touchline, factory reset
Product Data
Input Voltage | Output Voltage | Output Channel | Max. Load | Size(LxWxH) |
---|
100-240VAC
|
100-240VAC
|
2 Channels
| Resistive load: max. 5.1A/CH
Capacitive load: max. 1.7A/CH
|
45.5x45x20.3mm
Compatible Load Types
Over Current Protection
When connecting resistive load and total load is over 8.1A, the relay will
be forced to off and protected.
- 2-gang ZigBee in-wall switch based on latest ZigBee 3.0 protocol
- 100-240VAC wide input and output voltage
- Supports resistive loads and capacitive loads
- 2 channels output, max. load 5.1A/CH
- Input and output with screw terminals, safe and reliable
- Enables to control ON/OFF of connected load
- ZigBee devise with 2 endpoints which can be controlled separately
- ZigBee end device that supports Touchlink commissioning
- Can directly pair to a compatible ZigBee remote via Touchlink without a coordinator
- Supports self-forming ZigBee network without a coordinator and add other devices to the network
- Supports find and bind mode to bind a ZigBee remote
- Supports ZigBee green power and can bind max. 20 Zigbee green power switches
- Compatible with universal ZigBee gateway products
- Can be controlled by a universal single wire push switch, 2 channels can be controlled separately by 2 switches
- Active power and energy metering functionality
- Mini Size, Easy to be installed into a standard wall box
- Radio Frequency: 2.4GHz
- Waterproof grade: IP20
Safety & Warnings
- DO NOT install with power applied to device.
- DO NOT expose the device to moisture.
ZigBee Clusters the device supports are as follows: Input Clusters
- 0x0000: Basic
- 0x0702: Simple Metering
- 0x0003: Identify
- 0x0b04: Electrical Measurement
- 0x0005: Scenes
- 0x0b05: Diagnostics
Output Clusters
- 0x0019: OTA
Operation
- Do wiring according to connection diagram correctly.
- This ZigBee device is a wireless receiver that communicates with a variety of ZigBee compatible systems. This receiver receives and is controlled by wireless radio signals from the compatible ZigBee system.
- Zigbee Network Pairing through Coordinator or Hub (Added to a Zigbee Network)
- Step 1: Remove the device from the previous Zigbee network if it has already been added to, otherwise pairing will fail. Please refer to the part “Factory Reset Manually”.
- Step 2: From your ZigBee Controller or hub interface, choose to add a lighting device and enter Pairing mode as instructed by the controller.
- Step 3: Connected light will blink 5 times and then stay solid on, then the device will appear in your controller’s menu and can be controlled through the controller or hub interface.
- Step 4 : Reset power of the device to set it into network pairing mode (connected light flashes twice slowly), 15 seconds timeout, repeat this step.
TouchLink to a Zigbee Remote
- Step 1: Method 1: Short press the “Reset” button 4 times (or reset the power of the device 4 times) to start Touchlink commissioning immediately, 180S timeout, repeat this step. Method 2: Reset power of the device, Touchlink commissioning will start after 15S if it’s not added to a Zigbee network, 165S timeout. Or start immediately if it’s already added to a network, 180S timeout. Once timeout, repeat this step.
- Step 2: Bring the remote or touch panel within 10cm of the lighting device.
- Step 3: Set the remote or touch panel into Touchlink commissioning, please refer to the corresponding remote or touch panel manual to learn how.
- Step 4: There shall be an indication on the remote for the successful link and the connected light will flash twice.
- Note Directly TouchLink (both not added to a ZigBee network), each device can link with 1 remote.
- TouchLink after both added to a ZigBee network, each device can link with max. 30 remotes.
- To control by both gateway & remote, add remote and device to network first then TouchLink.
- After TouchLink, the device can be controlled by the linked remotes.
- Removed from a Zigbee Network through Coordinator or Hub Interface
From your ZigBee controller or hub interface, choose to delete or reset the lighting device as instructed. The connected light blinks 3 times to indicate a successful reset.
Factory Reset Manually
Factory Reset through a Zigbee Remote (Touch Reset)
Note: Make sure the device is already added to a network, the remote is added to the same one or not added to any network.
- Step 1: Short press the reset button 4 times to start TouchLink Commissioning, 180 seconds timeout, repeat this step.
- Step 2: Bring the remote or touch panel within 10cm of the lighting device.
- Step 3: set the remote or touch panel into the Touch Reset procedure to reset the device, please refer to the corresponding remote or touch panel manual to learn how.
- Step 4: There shall be an indication on the remote and connected light flashes 3 times for successful reset.
Find and Bind Mode
Note: Make sure the device and remote are already added to the same Zigbee network.
- Step 1: Short press “Reset.” button 3 times (Or reset the power of the device (initiator node) 3 times) to start Find and Bind mode (connected light flashes slowly) to find and bind target node, 180 seconds timeout, repeat this step.
- Step 2 : Set the remote or touch panel (target node) into find and bind mode, and enable it to find and bind initiator, please refer to the corresponding remote or touch panel manual.
- Step 3: There shall be an indication on the remote or touch panel that it bind the device successfully and can control it then.to learn how.
Learning to a Zigbee Green Power Switch
- Step 1: Short press “Reset.” button 4 times (Or reset power of the device 4 times) to start Learning to GP switch mode (connected light flashes twice), 180 seconds timeout, repeat this step.
- Step 2 : Set the green power switch into Learning mode, please refer to its manual.
- Step 3: Connected light will flash twice to indicate successful learning. Then the switch can control the device.
Delete Learning to a Zigbee Green Power Switch
- Step 1: Short press the “Reset.” button 3 times (Or reset the power of the device 3 times) to start delete Learning to GP switch mode (connected light flashes slowly), 180 seconds timeout, repeat this step.
- Step 2: Set the paired green power switch into Learning mode, please refer to its manual.
- Step 3: Connected light will flash 4 times to indicate successful deleting.
Setup a Zigbee Network & Add Other Devices to the Network (No Coordinator Required)
- Step 1: Short press “Reset.” button 4 times (Or reset power of the device 4 times) to enable the device to setup a zigbee network (connected light flashes twice) to discover and add other devices, 180 seconds timeout, repeat this step.
- Step 2: Set another device or remote or touch panel into network pairing mode and pair to the network, refer to their manuals.
Step 3: Pair more devices and remotes to the network as you would like, refer to their manuals.
Step 4: Bind the added devices and remotes through Touchlink so that the devices can be controlled by the remotes, refer to their manuals.
Note: 1) Each added device can link and be controlled by max. 30 added remotes.
2) Each added remote can link and control max. 30 added devices.
OTA
The device supports firmware updating through OTA, and will acquire new firmware from zigbee controller or hub every 10 minutes automatically.
Wiring Diagram
Notes for the diagrams:
- L – terminal for live lead
- N – terminal for neutral lead
- S1 – terminal for switch key No. 1
- S2 – terminal for switch key No. 2
- L1 – output terminal no. 1 for light load
- L2 – output terminal no. 2 for light load