IMPORTANT INSTALLATION AND WARRANTY INSTRUCTIONS

Thank you and congratulations on your purchase of the Ventair 3 in 1 Bathroom Fan, Heat & Light. Please read these instructions carefully before installing and using the product. Keep the instructions handy for future reference. Electrical wiring must only be done by a licensed electrician and a “Certificate of Compliance” must be issued upon completion of the installation.

LOCATION

  1.  Precautions must be taken to avoid the back-flow of gases into the room from the open flue of gas or other fuel-burning appliances.
  2. This unit should not be installed within 800mm from any additional or existing recessed heaters.
  3. The switches and other controls of the appliance should be installed so that they cannot be touched by a person in the bath or shower. The unit must be located and installed in accordance with AS/NZS 3000 and local building codes and regulations concerning the discharge of air have to be fulfilled. The unit can be installed in any room that requires direct radiant heating and circulated airflow such as bathrooms, ensuites, laundries, etc. The unit can be installed on flat ceilings with a minimum height of 2 meters from the floor. At least 220mm height clearance in the ceiling cavity is required to ensure sufficient ventilation for moisture to disperse. The unit must also be installed at least 400mm away from the walls. Between the unit and thermal insulation please also keep 200mm clearance when installing. Ensure adequate inlets exist through windows, vents or under the door for airflow.

POWER
AC220-240V, 50Hz electrical supply is required. The unit can be connected to a lighting or power circuit if loading permits. All electrical work must be carried out in accordance with AS/NZS3000 or the latest edition thereof, and local building codes and regulations. A four gang switch is included for all kinds of wiring combinations, eg. One ‘HEAT’ for 2 Globes and two ‘HEAT’ for all four globes. Ensure that supply power is isolated before commencing installation.

MOUNTING

  1. The unit may be mounted either between joists using the inbuilt clip fasteners or against a joist using a screw through the flange plate. Use this card in its open state as a template. Place in the required location and mark out the hole cutting size. Hole size is 320mm X 320mm.
  2. Before commencing cutting ensure that the area behind the intended location is clear of all cables, pipes, and joists. Once clear, cut out the section along the previously marked lines.
  3. Remove the heating lamps first. Connect the ducting if required to the outer grille of the unit. Insert the unit into the square hole being sure to pull the side clips inward so that the body can pass through the hole without damaging the plaster. Rotate the swing clips to hold the motor body in place (figure 1) then tighten the screw to let the clip clap onto the ceiling board (figure 2).
  4. Hold the fascia against the body of the heater and the ceiling and attach the securing spring clips to hold the fascia in place.
  5. Now screw the four large heat lamps into the lamp holder through the holes provided in the fascia. The globes should be screwed up firmly to ensure a good electrical contact but don’t overtighten. Next, fit the small center globe in the same way ensuring that it is positioned centrally.

ELECTRICAL WIRING

The bathroom heater unit must be wired through either a plug and socket or an all-pole disconnecting switch in accordance with Australian Wiring Rules AS/NZS 3000. Note: This unit is fitted with a thermostat switch which will operate to automatically switch the fan on in the event that the internal temperature of the unit exceeds 80°C.

  1. Clip the switches into the backing plate in the desired order and install the plate on the wall.
  2. Connect the wiring to the four switches as shown in the below electrical diagram.
  3. Remove the terminal cover on the heater unit and wire according to the label adjacent to the terminal block. Make sure all cables are securely connected and refit the terminal cover.
  4. Clean the fascia and globes with a soft moist cloth. Turn on the power and check the switch operation.

MAIN TECHNICAL PARAMETERS

Input Motor Power Noise Air Volume Hole-cutting Size Model No
220240V 50Hz 30W 38dB(A) 200m3/H 320x320mm H4W

Ventair is lacing the industry by ensuring all airflow data is gathered in accordance with International industry standard 1505801.

  • ISO(International Organization for Standardization): An International standard tested under strict guidelines providing accurate data and commonly used in the professional specifying market.

CARE AND MAINTENANCE

  1. During the installation of this bathroom heater, please make sure that the person in the bathtub or in the shower area cannot reach the electrical switches and other electrical controllers.
  2. This bathroom heater mustn’t be installed below the electrical outlet.
  3. This bathroom heater mustn’t be installed nearby the curtains and other combustible materials.
  4. This bathroom heater must under no circumstances be covered with insulation material or similar material.
  5. Joists, beams and rafters shall not be cut or notched to install this bathroom heater.
  6. Lamps must be cool before cleaning. To clean bulbs and surround wipe with a cloth dampened with detergent or liquid glass cleaner.
  7. To prolong the life of your 3-in-1 bathroom heater fan light, avoid using the heat lamps alone for longer than 10 minutes. Use the fan function along with the heat lamp to allow cooling of your 3-in-1 bathroom heater light.
  8. This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge unless they have been given supervision or instruction concerning the use of the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance.

REPLACEMENT GLOBES
HEAT LAMPS: The heat lamps must only be replaced with 275 watts (maximum) globes CENTRE LAMP: 6W watt(maximum) R80 LED globe

BATHROOM HEATER WARRANTY CARD
This unit must be installed by a qualified licensed electrician. Ventair 3 in 1 heater is thoroughly inspected and tested before being released for sale. In addition to any warranties or conditions implied by applicable Statute or Regulation, Ventair warrants its bathroom heater against defective workmanship and faulty materials for three years from the original date of purchase. Ventair undertakes, at its option, to repair or replace, free of charge, each product or part thereof subject to the below warranty conditions.
The fan or relevant part has not been modified, subjected to misuse, neglect, or involved in an accident. The repairs are not required as a result of normal wear and tear. The product was installed by a licensed electrical contractor in accordance with this instruction manual. No solid state speed control device has been used with the appliance. A copy of the original receipt of purchase is presented. Globes supplied are not covered by this warranty.
Ventair cannot be held responsible for any repair other than those carried out by it or one of its Authorised Service Agents. Please keep this warranty card in a safe place. This card must be produced in the event of service being required.

MODEL (SKU) NUMBER:
DATE OF PURCHASE:

RETAILER:
RECEIPT NUMBER:

INSTALLED BY:
LICENCE # :

DESCRIPTION OF FAULT:
PH:

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals