Barrette OUTDOOR LIVING 73014313 Heavy-Duty Chain Link – Farm Hinge Instruction Manual

June 5, 2024
Barrette OUTDOOR LIVING

Barrette-LOGO

Barrette-LIVING-73014313-Heavy-Duty-Chain-Link
-PRODUCT

WARNING

  •  Improper installation of this product can result in personal injury. Always wear safety goggles when cutting, drilling and assembling the product.
  •  Incorrect installation may cause harm to the gate or individual.

NOTICE:

  •  DO NOT attempt to assemble the kit if parts are missing or damaged.
  •  DO NOT return the product to the store, for assistance or replacement parts call: 1-877-265-2220.

BEFORE YOU BEGIN

Vinyl gate posts require an internal support system for weight-bearing purposes and therefore wooden inserts or a post stiffener is required. Post stiffener needs to be purchased separately.Barrette-LIVING-73014313-Heavy-
Duty-Chain-Link -FIG-1

TOOLS NEEDED:

| Safety Glasses
---|---
| Tape Measure
| 7⁄32″ Drill Bit
| 7⁄16″ Socket Wrench
| Gate
| 9⁄16″ or 14 mm Wrench
| 10 mm Wrench
| Drill

*Additional U-clamps, nuts and washers may need to be purchased if gate upright diameter is between 13⁄4″ and 21⁄2″.

Component list

Barrette-LIVING-73014313-Heavy-Duty-Chain-Link
-FIG-2

Determine Gate Opening:
Gate opening is determined by width of gate plus clearance for hinge (11⁄2″) plus clearance for latch (see latch instructions for details) (Fig. 1). The heavy-duty hinge supports gates up to 250 pounds and 168″ wide.

Mount Hinge on Gate:

  • a. Place hinges at desired positions on gate upright and with a minimum spacing of 32″ between each hinge.

  • b. Remove nuts from U-clamps and slide ends of U- clamps through mounting holes in gate plate, as shown (Fig. 2).
    NOTE: When fastening to gate upright, be sure brackets are centered and bottom space matches your railing sections.

  • c. Thread nuts onto U-clamp ends and tighten

Mount Gate on Post:Barrette-LIVING-73014313-Heavy-Duty-Chain-Link
-FIG-5


NOTE: Both gate posts must be plumb prior to gate installation.

  • a. Position gate at desired height on post.
  • b. Measure space between ground and bottom of gate and cut (2 to 3) wood spacer blocks at this height (Fig. 3).
  • c. Rest gate on the spacer blocks 9 (Fig. 3).
  • d. Set the gate level to the post. Mark, then pre-drill pilot holes into the gate post using a 7⁄32″ drill bit (Fig. 4).
  • e. Secure both hinges to the post with four 3″ lag screws per hinge using a 7⁄16″ socket wrench (Fig. 4).
    NOTE: If using a round post up to 3″ in diameter, purchase the appropriately sized U-clamps, nuts and washers.* For mounting gate to round post, please refer to Installation steps 2b and 2c.

**Horizontal adjustment

Barrette-LIVING-73014313-Heavy-Duty-Chain-Link
-FIG-7**

Gate can be adjusted horizontally if required

  • a. Loosen (but DO NOT remove) the (2) hex flange lock nuts with a 10 mm wrench (Fig. 5).
  • b. Move the gate to the left or right, as desired.
  • c. Re-tighten the (2) hex flange lock nuts (Fig. 5).Barrette-LIVING-73014313-Heavy-Duty-Chain-Link -FIG-8

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Barrette OUTDOOR LIVING User Manuals

Related Manuals