Barrette OUTDOOR LIVING Juliette Brackets For Aluminum Rail Instruction Manual
- June 5, 2024
- Barrette OUTDOOR LIVING
Table of Contents
Barrette OUTDOOR LIVING Juliette Brackets For Aluminum Rail
WARNING:
- Improper installation of this product can result in personal injury. Always wear safety goggles when cutting, drilling and assembling the product.
- Incorrect installation may cause harm to the product or individual.
- Refer to local building codes for installation requirements; failure to install this product in accordance with building codes may affect the safety of the product and void product warranty.
NOTICE:
- DO NOT attempt to assemble the kit if parts are missing or damaged.
- DO NOT return the product to the store, for assistance or replacement parts call: 1-877-265-2220.
Component List
QTY | Description |
---|---|
4 | Juliette Bracket |
2 | Foot Support |
2 | Flat Post Cap |
16 | #14 x 1″ Hex head screw |
TOOLS NEEDED
| Pencil
---|---
| Screwdriver
| Measuring Tape
| Power Drill
| Drill Bits
- For use with Barrette Outdoor Living 2½” aluminum railing fascia posts:
- a. Assemble your level railing section per the panels included instructions.
- b. Mount brackets included with the railing panel to the posts by using included template as a guide.
The suggested position is:
Measure up 6″ from the bottom of the post. Mark with a line. From that line,
measure up 3713⁄16″ for a 42″ panel (3113⁄16″ for a 36″ panel) and draw a
line. Align the bottom of the bottom bracket with the first line, pre-drill
the holes and secure the bracket with hardware included with the panel. Align
the bottom of the top bracket with the second line, pre-drill the holes, and
secure the brackets with hardware included with the panel.
Installation
Two (2) Juliette brackets will be used on each post.
- a. Use the included mounting hardware – 1″ #14 hex head screw to attach one bracket approximately 2″ below the top rail bracket and one approximately 2″ below the bottom rail brackets
- b. Repeat this for the second post.
- Attach pyramid cap to top of post and flat cap to bottom of post.
- Position section in its mounting location and use 3⁄8″ diameter fasteners (not included) to attach the posts to the structure per the mounting schedule below:
POST MOUNTING HARDWARE REQUIRED (NOT INCLUDED)
FOR RESIDENTIAL APPLICATIONS, 36″ HIGH|
---|---
Panel Width
| ****
Load
| ****
Recommended Bolt Application
| For Lag Bolt Application 3/8″ Diameter Screw
Minimum Embedded Screw Thread Length Required
| ****
For Through Bolt Application
| For Concrete Anchor Application 3/8″ Titen HD Anchor Minimum Required Length
(Minimum Distance of 4″ from Edge Required)|
8′| | Lag Bolt| 3.5″| 3/8 Hex Bolt 3/8″ Flat Washer 3/8″ Lock Washer
3/8″ Nut
| 4″|
| -or-|
6′| 3″| 3″|
200 lbs| Through Bolt|
| -or-|
4′| 2.5″| 3″|
| Concrete Anchor|
FOR COMMERCIAL APPLICATIONS, 42″ HIGH|
---|---
Panel Width
| ****
Load
| ****
Recommended Bolt Application
| For Lag Bolt Application 3/8″ Diameter Screw
Minimum Embedded Screw Thread Length Required
| ****
For Through Bolt Application
| For Concrete Anchor Application 3/8″ Titen HD Anchor Minimum Required Length
(Minimum Distance of 4″ from Edge Required)|
| | Through Bolt| | ****
3/8 Hex Bolt 3/8″ Flat Washer 3/8″ Lock Washer
3/8″ Nut
| |
8′| 400 lbs| -or- Concrete Anchor| N/A| 5″|
6′
| ****
300 lbs
| Lag Bolt| ****
4.5″
| ****
4″
|
-or-|
Through Bolt|
| | | |
4′| 200 lbs| -or- Concrete Anchor| 3″| 3″|
- a. Position the support foot so it fully engages the bottom rail.
- b. Mark the 2 holes and attach the support foot with two ¼” diameter screws (not included)
NOTE: One foot support is needed (centered) for a 6′ panel. Two foot supports equally spaced for an 8′ panel
If your span is greater than 8’ you will need a mid post. For this type of application a fascia mount mid bracket as well as a Juliette spacer (73050297) is needed
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>