Rinnai RHFE309FT Energy savers Installation Guide
- June 1, 2024
- Rinnai
Table of Contents
RHFE309FT Energy savers
Product Information
Specifications:
- Brand: Rinnai
- Models: RHFE309FT, RHFE559FT, RHFE561FT, RHFE1005FT
- Manufacturer: Rinnai New Zealand Limited
- Address: 105 Pavilion Drive, Mangere, Auckland
Product Usage Instructions
1. Flue Installation Guide:
Ensure the flue installation is in accordance with the
manufacturer’s instructions, AS/NZS standards, and local
regulations.
2. Important Notes:
-
Installation, servicing, and repair should be done only by
authorized personnel. -
Air intake hose must not be cut or shortened.
-
Rear panels must be fitted for safe operation.
-
Flue components must be securely joined and clipped to the wall
using provided straps.
3. Connecting Flue Components:
Seal inner pipe joints with the provided o-ring seal lubricant.
Do not use petroleum-based lubricants to prevent o-ring
deterioration.
4. Flue Sections Outside:
Seal joints of outer PVC pipes to prevent dust and water
ingress.
5. ESBEND Installation:
Refer to the installation sheet provided with each ESBEND kit
for correct alignment to avoid overheating.
Frequently Asked Questions (FAQ)
Q: Can the air intake hose be shortened?
A: No, the air intake hose must not be cut or shortened to
ensure proper functioning of the appliance.
Q: What lubricant should be used for sealing inner pipe
joints?
A: Use the silicone grease provided in the main flue kits to
lubricate the o-rings on the inner pipes. Do not use
petroleum-based lubricants as they can damage the o-ring seals.
Flue installation guide
Energysavers
Models: RHFE309FT / RHFE559FT / RHFE561FT / RHFE1005FT
Important
Rinnai Energysaver flueing shall be installed in accordance with: –
Manufacturer’s installation instructions – Current AS/NZS 5601.1, AS/NZS 3000,
and G12/AS1 – Local regulations and municipal building codes
Installation, servicing and repair shall be carried out only by authorised
personnel.
Warning Improper installation, adjustment, alteration, service or maintenance
can cause property damage, personal injury or loss of life.
For more information about buying, using, and servicing of Rinnai appliances call: 0800 RINNAI (0800 746 624)
Rinnai New Zealand Limited 105 Pavilion Drive, Mangere, Auckland PO Box 53177, Auckland Airport, Auckland 2150
Phone: Fax: Email: Web:
(09) 257 3800 (09) 257 3899 info@rinnai.co.nz www.rinnai.co.nz www.youtube.com/rinnainz www.facebook.com/rinnainz
contents:
Important ……………………………………………….. 5 Energysaver flueing guidelines ………………….. 6
Flueing options………………………………………… 7 Flue components …………………………………….. 8 Wall flue
penetrations ………………………………. 12 Direct flueing using the ESDFK kit………………. 14
Sideways horizontal flueing……………………….. 16 Down-and-out flueing ……………………………… 18
Vertical in-wall flueing………………………………. 20 Horizontal through-wall flueing
vertical flueing.. 22 Cutting to length (ESDFK, ESPIPE900) ………… 24 Connecting
the heater exhaust and air supply 25 Assembling a wall terminal………………………… 26
Connecting the condensate drain tube ………. 27
About this guide
The intention of this guide is to outline the most common types of flue
installations and to provide an overview of how to assemble the flue
components. If you have an installation that varies from that detailed in this
guide, please contact Rinnai.
If there is information missing that you feel would be helpful to other
installers, please let us know and we will look to include in future updates.
Important
For all flue installations there are some important `must-dos’ to ensure the
flue is installed correctly. These are summarised below.
IMPORTANT
Air intake hose At no time must the air intake hose be cut or shortened.
Rear panels The rear panels are NOT an optional component and MUST BE fitted
to ensure the correct and safe operation of the appliance. Failure to fit the
panels will void any warranty.
Flue must be secure To prevent the flue from moving or coming apart the joints
between the flue components MUST BE secured by screws (easier to undo if
necessary) through the outer pipes. If joints are not secured properly,
products of combustion could disperse into the room being heated–this is
potentially very dangerous.
The flue components MUST BE clipped to the wall using the wall straps provided
in each flue kit.
ESDFK component To prevent overheating of the plastic flue components the
minimum length of the ESDFK when measured from the back plate of the
transition casting MUST NOT be less than 300 mm when joining to other
components, refer p. 24.
Connecting flue components
Inner pipe joints are sealed with an o-ring seal lubricant. A small plastic
tub of silicone grease is provided with the main flue kits. Use this silicone
grease to lubricate the o-rings on the inner pipes prior to assembly. This is
important as the o-rings can dry out and break, and replacing o-rings is
difficult.
DO NOT use petroleum based lubricants. Petroleum jelly or other similar based
lubricants will cause deterioration of the o-ring seals.
Flue sections located outside
Sections of the flue located outside require the following precautions: · Only
use PVC cement
between the joints of the outer PVC pipes to secure and seal the joints
against ingress of dust and water.
· To secure and seal the outer joints of PVC such as the condensate trap, only
use nonacidic silicone sealant. Aluminium may corrode if a sealant containing
acetic acid or other acid is used.
ESBEND installation and connection
If installed incorrectly there is potential for the outer bend to overheat. A
separate installation sheet is provided with each ESBEND kit to ensure correct
alignment of the bend component.
Condensate trap
A condensate trap is required for all vertical flue installations to ensure
condensate generated during combustion is trapped and prevented from entering
the chamber of the heater. In all installations the arrow on the condensate
trap must point up.
2° fall to the wall terminal
For direct, sideways throughwall, and down-and-out flue installations, there
must be a continuous fall of at least 2° to the wall terminal. This equates to
20 mm per metre to the termination point to drain the condensate. The Direct
AA and A mushroom flue kits (R1350/R1351) have an inbuilt 2° fall.
2° fall back to the heater
Required when any part of the flue system goes horizontally then vertically,
refer p. 22.
Energysaver flue installation guide: 10848-C 03-15 | 5
Energysaver flueing guidelines
All Rinnai Energysavers must be installed with an approved Rinnai Energysaver
flue system. Approved flue components are detailed in this guide.
Every Energysaver requires a flue system that will draw effectively and clear
flue products safely under all potential wind and climatic conditions.
It is the responsibility of the installer to ensure that the appliance is
provided with an effective flue. Some guidelines to assist with flue design
are listed below. These must be read and modified as necessary with reference
to the particular installation.
Clearance to combustibles All Energysaver flue components have zero clearance
EXCEPT for the elbow section of the ESKIT03, and ESELBOWB. These components
require a minimum clearance of 25 mm from combustible materials.
Maximum flue length and number of bends Max. flue length – 9 m Max. no. of
bends – 3
One 90 ° bend equals 1 m. For every 90 ° bend the overall length must be
reduced by 1 m. For example, if an installation has three 90 ° bends, the
maximum flue length can be 6 m.
The flue transition connection,of the ESKIT03 and ESELBOWB is counted as a 90
° bend.
Flue terminal locations Must be compliant with AS/NZS 5601.1.
· Do not flue into natural draught flues or fireplaces.
· Do not flue into other rooms, roof spaces, or under floor spaces.
Flue terminal must be positioned away from flammable materials.
In areas subject to heavy snowfall, keep snow clear of the flue terminal at
all times.
Flashings Flashings are not part of the flue kit and must be specified.
Vertical terminations: Flue cowl clearance To ensure products of combustion
are cleared, adequate clearance from the building is required.
The flue cowl should have a 500 mm clearance from any part of the building.
This also applies to steeped and pitched roofs which should be clear of the
ridge line.
Lesser clearances may provide perfectly adequate flue systems depending on the
installation. Minimum clearances are shown in AS/NZS 5601.1.
Elbow section of the ESKIT03 and ESELBOWB
Keep flammable materials away from the flue terminal
Snow
Keep snow away from the flue terminal
Minimum clearance 500 mm to nearest part of roof
6 | Energysaver flue installation guide: 10848-C 03-15
500 mm flue clearance from roof line
Flueing options
The below options detail the most common types of flue installations. If you
have an installation that varies from that shown, please contact Rinnai.
Direct – Direct AA mushroom flue (R1350), or – Direct A mushroom flue (R1351),
or – Direct flue (ESDFK)
Direct extended – Direct flue (ESDFK) – Flue pipe (ESPIPE900)
Sideways in-wall – Direct flue (ESDFK) – Elbow adaptor (ESELBOWB) – Flue pipe
(ESPIPE900)
Sideways front-of-wall – Backspacer kit – Direct flue (ESDFK) – Flue pipe
(ESPIPE900)
Vertical in-wall direct – Flue adaptor kit(ESKIT03) – Flue pipe (ESPIPE900) –
Roof cowl (ESROOFCOWL)
Vertical in-wall offset – Flue adaptor kit (ESKIT03) – Flue pipe (ESPIPE900) –
45 ° bends (ESBEND) – Roof cowl (ESROOFCOWL)
Vertical in-wall horizontal – Flue adaptor kit (ESKIT03) – Flue pipe
(ESPIPE900) – 45 ° bends (ESBEND) – Horiz. wall terminal (ESWTERM)
Down-and-out – Back spacer kit – Direct flue (ESDFK) – Flue pipe (ESPIPE900) –
45 ° bends (ESBEND)
Down-and-out in-wall – Elbow adaptor (ESELBOWB) – Direct flue (ESDFK) – Flue
pipe (ESPIPE900) – 45 ° bends (ESBEND)
Horizontal through-wall vertical flueing – Direct flue (ESDFK) – 90 ° bend
(ESBEND) – Flue pipe (ESPIPE900) – Condensate trap (ESCONDK) – Roof cowl
(ESROOFCOWL)
ESPIPE900 Order lengths as required. ESBEND kit Contains 2 x 45° bends. Back
spacer kit Refer p. 10 for model codes.
Energysaver flue installation guide: 10848-C 03-15 | 7
Flue components
Direct mushroom flue kits (refer separate instructions included with each kit) Direct AA mushroom flue kit Direct A mushroom flue kit Code = R1350 (stainless steel) Code = R1351 (stainless steel)
For use in walls 75-115 mm thick For use in walls 115-240 mm
(can be cut to size).
thick (can be cut to size).
This is a complete kit with an inbuilt 2° fall to drain condensate, no other components are required.
This is a complete kit with an inbuilt 2° fall to drain condensate, no other components are required.
Direct flue kit Code = ESDFK (aluminium)
Suitable for walls up to 385 mm (can be cut to size). Can be used in
combination with ESPIPE900 for longer flueing.
50 mm
540 mm
Black outside wall terminal Ø 140 mm
Coaxial flue pipe Code = ESPIPE900
Extension pipe (960 mm
installed) used
Ø 80
to construct
Ø 50
horizontal, vertical,
and down-and-out
flueing. Can be
cut to size. Inner
is aluminium, and
outer is PVC plastic.
Comes with one
wall bracket (not
pictured)
· O-ring for pipe (4350)
· Spacer for pipe (4351)
43 mm
75 mm
975 mm
8 | Energysaver flue installation guide: 10848-C 03-15
Energysaver in-wall flue adaptor kit Code = ESKIT03
In-wall transition flue kit. Elbow section of this kit requires a 25 mm
clearance from combustibles, the rest is zero clearance.
Includes condensate trap, top plate, wall spacer plate, and vermin plates.
Vertical terminal
Code = ESROOFCOWL
Roof cowl and connecting pipe (960 mm installed) for termination of flue in
vertical installations–can be cut to size.
Ø 195
Powder coated (black) galvanised steel.
Flashings are not part of the kit and must be specified.
165 mm
900 mm
45 ° flue bends (x2) Code = ESBEND
Used to facilitate between horizontal, vertical, and downwards flueing. Two
spacers are included. Bends can be used separately or together as one 90°
bend.
120
Ø 50 Ø 75
Horizontal wall terminal
Code = ESWTERM
Used to terminate the flue pipe (ESPIPE900) in horizontal flue installations
when used in conjunction with ESKIT03.
Contains: · Flue terminal (aluminium) · External wall plate (black
PVC)
Wall plate Code = ESPLATE
Used if an extra wall cover is required to tidy any installation work through
the wall, ceiling, or floor.
Black or white available.
Ø 170 mm
120 Ø 80
Ø 75
Energysaver flue installation guide: 10848-C 03-15 | 9
Condensate trap
Code = ESCONDK
Typically only ordered separately for horiz. throughwall vertical flueing (p.
22). Supplied with drain tube (not pictured). When installed the arrow MUST
point up.
N.B: The condensate trap is included with the ESKIT03.
Elbow adaptor
Code = ESELBOWB
For horizontal, and downand-out installations that are recessed into the wall
and DO NOT require a back spacer kit.
Requires a minimum clearance of 25 mm from combustible materials.
Flue guard (steel) Code = R1370
Protection against hot flue gases when the flue terminates low to the ground.
Colour – warm white.
220 mm
146 mm
138 mm
Approx. 155 mm 220 mm
Back spacer kits
Codes
· ESBSKH 1005FT back spacer kit
· ESBSKE 309FT back spacer kit
· ESBSKF 559FT back spacer kit
· ESBSKG 561FT back spacer kit
85 mm
The back spacer kit covers the flue elbow
connection and provides the required
clearances from the heater and wall in down-
and-out flueing, and sideways front-of-wall
flueing installations.
200 mm
The back spacer kit is used INSTEAD of the rear panels supplied with each Energysaver and adds approximately 115 mm of additional depth (standard rear panel is 85 mm, back spacer kit is 200 mm)
309FT Energysaver with standard rear panels
561FT Energysaver with back spacer kit
Back spacer kit contains: · Left, right, and top spacer panels · Flue elbow connection · Plastic edging seal · Extended side panel brackets (1005FT only)
10 | Energysaver flue installation guide: 10848-C 03-15
This page intentionally left blank
Energysaver flue installation guide: 10848-C 03-15 | 11
Wall flue penetrations
In most instances the flue penetration can be marked using the heater. Where
the heater and/or components are not on site use the penetration arc diagrams
below to work out where the flue is to penetrate the wall.
Ensure there are no wall studs, noggins, wiring, or other obstructions within the wall cavity where the flue is to penetrate.
Desired location of heater
1. Select the desired location of the heater.
2. Find the vertical centre line of the heater and mark this location on the
wall.
3. Using the A and B measurements from the table, mark off the arc centre on
the wall. The arc centre corresponds to the pivot point centre of the
telescopic flue elbow* on the heater.
4. From the arc centre use the measurements C, D and E from the table to draw
an arc on the wall.
The lower end point of the arc will be the lower limit of the minimum
horizontal and vertical centre of penetration (G).
The upper end of the arc will be the upper limit of the minimum horizontal and
vertical centre of penetration (G).
5. From the arch centre use measurements F, D and E from the table to draw an
arc on the wall.
The lower end point of the arc will be the lower limit of the maximum
horizontal and vertical centre of penetration (G).
The upper end of the arc will be the upper limit of the maximum horizontal and
vertical centre of penetration (G).
6. The penetration may be made anywhere within the shaded areas defined by
the two arcs.
Arc centre
CL
B
A
Arc centre
CL
G
Upper end point of arc Lower end point of arc
C
E
D
Arc centre
CL
G
Upper end point of arc Lower end point of arc
E
D
F
Shaded minimum and maximum areas defined by the two arcs
- The 309FT model has a fixed length (non-telescopic) flue elbow–C and F
IMPORTANT
measurements will be the same.
12 | Energysaver flue installation guide: 10848-C 03-15
B
120 mm (D) 410 mm (E)
B D E
309FT
Outline of appliance
465 mm 233 mm
CL
Ø 80 mm
Arc
centre C & F
A Base of enclosure
561FT
Outline of appliance
545 mm 273 mm
CL
G
Arc centre
F C A
Base of enclosure
Outline of appliance B D E
Outline of appliance
B D E
559FT
760 mm
F CL
380 mm
G
Arc centre
C
A
Base of enclosure
1005FT
930 465
CL
G
Arc centre
C F A
Base of enclosure
309FT 559FT 561FT 1005FT
All dimensions are in mm.
A Horizontal distance from CL to arc centre 132 207 172 305
B Vertical distance from base to arc centre 265 247 267 165
C Minimum horizontal limit of arc
150 240 200 325
D Minimum vertical limit of arc
220 220 267 250
E Maximum vertical limit of arc
410 440 393 340
F Maximum horizontal limit of arc
150 305 230 365
G Penetration diameter
80 80 80 80
Energysaver flue installation guide: 10848-C 03-15 | 13
Direct flueing using the ESDFK flue kit
The ESDFK kit can be used for walls up to 385 mm, and can be cut to length to
suit wall thicknesses less than 385 mm. The ESDFK can also be used in
combination with ESPIPE900 for walls greater than 385 mm, this is called
direct extended flueing.
Direct flueing
Direct extended flueing
ESPDFK wall terminal
Refer p. 24 if cutting to length for important information regarding cutting
the outer and inner pipes. IMPORTANT Flue must terminate 300 mm above ground
level. It must not terminate under the building.
Flue length Direct extended flueing–flue can be up to 9 m (no bends).
Creating a direct flue installation for walls less than 385 mm 1. Create the
wall penetration. Allow for a continuous 2 ° fall from the heater connection
point
to the wall terminal.
2. Slide the internal wall plate over the terminal end of the ESDFK pipe
until it is nested on the raised ring of the flue transition. Pass the ESDFK
through the internal wall penetration until the internal wall plate is flush
with the wall.
3. Create the wall terminal.
4. Move the heater into place and connect the heater flue pipe to the flue.
This is done with the flue lock clamp provided with the heater.
Max. wall thickness 385mm Min. required protrusion 15mm
Internal wall plate, outer face
Exterior wall
2° fall to wall terminal
14 | Energysaver flue installation guide: 10848-C 03-15
Creating a direct extended flue installation for walls greater than 385 mm 1.
Refer step 1 on previous page. 2. Join ESPIPE900 to ESDFK–cutting is not
required to join these components together. The
joints between ESDFK and ESPIPE900 MUST BE secured by screws through the outer
pipes to prevent disconnection. 3. Follow steps 2-4 as outlined in the
previous section for creating a direct flue installation.
Min. required protrusion 50mm
Internal wall plate, outer face
Exterior wall
2° fall to wall terminal
Energysaver flue installation guide: 10848-C 03-15 | 15
Sideways horizontal flueing
The sideways flue installation can be run along the left or right hand side of
the internal wall behind the heater. If retrofitting, the flue can be boxed in
along the floor or behind a 125 mm false wall. This installation requires
additional clearance off the wall with a back spacer kit.
Sideways flueing can be an untidy installation. If going in-wall there needs to be a large hole made in the wall, not only for the flue, but for the connection of the heater’s flexible combustion air inlet hose. If going front- of-wall a hole needs to be cut out of the back spacer kit side panel. Ensure the homeowner is aware of how this installation will look.
The instructions on these pages mainly address the sideways front-of-wall installation using the back spacer kit. Please adapt the instructions as necessary for sideways in-wall installations.
Sideways in-wall
Standard rear panel
Internal wall
Sideways front-of-wall
Back spacer kit panel
Elbow connection (circled) requires a 25 mm clearance to combustible materials
IMPORTANT
Modifying the ESDFK
Grub screw (supplied)
3 mm rivet
Flue length Total flue length can be 8 m–the elbow component is counted as a
90° bend. If bends need to be included to offset a stud, or noggin, the flue
length can be up to 6 m and contain two 90° ESBEND’s (two ESBEND kits).
16 | Energysaver flue installation guide: 10848-C 03-15
Steps for creating sideways horizontal flueing
1. Using a drill, remove the pop rivet used to fasten the straight flue pipe
to the flue transition of the ESDFK and remove.
Fit the elbow adaptor to the flue transition by pushing it fully home and then
fasten in place with the grub screw (supplied) using an Allen key. The grub
screw terminates in a groove in the flue transition.
Refit the straight pipe connection to the end of the elbow until it is fully
home and fasten in place with a 3 mm rivet.
2. Temporarily position the heater in the desired location.
3. Attach the ESDFK to the flue outlet pipe from the rear of the heater.
Align the flue in the direction of the discharge, either left or right
ensuring a 2 ° fall towards the flue terminal.
4. Sideways front-ofwall only–attach the appropriate back spacer kit to the
rear of the heater, refer separate instructions.
5. Fit the ESPIPE900 to the ESDFK by lubricating the o-rings with the
supplied o-ring grease, then fit the female inner aluminium pipe end over the
male inner pipe end of the adjoining component.
If a front-of-wall installation, refit the back spacer kit side panel to the
heater with the flue pipe passing through it.
6. Locate the heater in the desired position relative to the wall. Do not
secure the heater at this stage.
7. Fit additional lengths of ESPIPE900 as required.
8. Create the wall penetration, and if required (front-of-wall installation)
install and fasten the internal wall plate to the internal wall.
9. Create the wall terminal, refer p. 26.
10. Secure joints between flue components through the outer pipes with screws
and secure the entire flue system using the wall straps supplied.
Mark the location of the flue penetration through the side panel of the back spacer kit. Remove panel and cut or knock-out an 80 mm Ø hole for the flue pipe to pass through– ensure the edges are smooth. Fit the protective plastic edge supplied with the back spacer kit around the hole.
Energysaver flue installation guide: 10848-C 03-15 | 17
Down-and-out flueing
The down-and-out flue option allows for the ESDFK to face downwards and for
the flue to run vertically through a hole in the floor, and then horizontally
to a suitable location outside. When considering the location of the heater
due care must be taken to ensure that the flue path under the floor is free of
obstructions such as studs, noggins, joists, braces, electrical wires etc.
The instructions on these pages detail an installation using the back spacer kit, and where the flue penetrates the floor in front of the wall. Please adapt the instructions as necessary for down-and-out in-wall installations.
Down-and-out configuration overview
Combustion air hose Wall straps
Back spacer kit ESDFK modified Heater exhaust
300 mm clearance
Floor penetration
Flue must terminate horizontally 300 mm above ground level. It must not
terminate IMPORTANT under the building. Flue length In the above example the
flue could be up to 7 m long and contain one 90 ° bend.
Floor penetration and assembling the flue components Interior wall
Wall strap
Internal wall plate
18 | Energysaver flue installation guide: 10848-C 03-15
Steps for creating down-and-out flueing
1. Modify the ESDFK (refer image on p. 16) Using a drill, remove the pop
rivet used to fasten the straight flue pipe to the flue transition of the
ESDFK and remove.
Fit the elbow adaptor to the flue transition by pushing it fully home and then
fasten in place with the grub screw (supplied) using an Allen key. The grub
screw terminates in a groove in the flue transition.
Refit the straight pipe connection to the end of the elbow until it is fully
home and fasten in place with a 3 mm rivet.
2. Create floor penetration Temporarily attach the ESDFK to the flue outlet
pipe of the heater. Mark the location of the floor penetration, then cut an 80
mm hole through the floor. Ensure the hole edges are smooth.
Disconnect the ESDFK from the heater. Pass the ESDFK through the standoff clip
and the internal wall plate, then pass the assembly through the floor
penetration.
and securing the ESPIPE900, ESBEND and subsequent ESPIPE900 lengths as
required.
Allow for a 2 ° continuous fall from the first section of horizontal pipe to
the wall penetration.
4. Locate the heater Locate the heater in the desired position relative to
the wall. Do not secure the heater at this stage.
5. Create wall penetration and terminal Create the wall terminal, refer p.
26.
6. Secure flue system Secure the joints between the flue components through
the outer pipes with screws and secure the entire flue system using the wall
straps supplied.
7. Install rear spacer panels OR back spacer kit Install remaining rear
spacer panels (supplied with the heater) OR the back spacer kit and secure to
the internal wall.
Secure ESDFK to the wall with the standoff clip and fasten the internal wall plate in place to the floor.
3. Cut, fit, and secure flue components Prepare the horizontal section of the flue located under the floor by assembling, connecting
Energysaver flue installation guide: 10848-C 03-15 | 19
Vertical in-wall flueing
The vertical in-wall flue installation is installed within a stud wall
(minimum cavity depth of 90 mm), is run vertically upwards, and includes a
condensate trap. When considering the location of the heater ensure that the
flue path in the roof space is free from obstructions such as studs, noggins,
wiring, joists etc.
i Appliance outline example RHFE-559
iii Centre of flue elbow pivot point ix Spigot area derived from lower end
points iv and vi
D Min. limit of arc
200mm Req. wall penetration
Outline of vermin plates
Align this point within
H the shaded area iv.
Outline of mounting strip
75mm Bottom left corner of opening
117mm 300mm 50mm
75mm
H Air intake hose
20 | Energysaver flue installation guide: 10848-C 03-15
Steps for creating vertical in-wall flueing
1. In conjunction with the wall penetration information (p. 12-13) create a
300 mm high by 200 mm wide opening. The bottom left corner of this opening is
75 mm to the left of starting point H and 50 mm below starting point H.
2. Remove the screw from the front of the transition casting (retain) and
slide the wall spacer plate over the transition casting so that the folded tab
is facing down and to the rear. Using the removed screw attach the mounting
strip across the front of the transition casting.
Lubricate the o-ring of the condensate trap and attach this to the transition
assembly ensuring that the drain tube is facing to the front and that the
arrows points up.
3. Install the above assembly in the wall cavity observing the measurements
shown to ensure correct fitting of the heater and other components. Secure in
place with the appropriate fittings.
Lubricate the o-ring of the condensate trap with the male end pointing towards
the heater. Fit the required lengths of ESPIPE900 to reach, but not pass
through, the top plate (lubricating the o-rings of each additional ESPIPE900
length before fitting). When this point is reached secure the top plate
bracket over the hole in the top plate.
5. Continue flueing to the termination point and fit an ESROOFCOWL. To avoid
obstructions in the flue path an offset can be created using the ESBEND.
6. Pass the combustion air hose of the heater through the right hand vermin
plate.
Note: When installing the 1005 the combustion air hose diameter is larger than
the other models. A knockout is provided in the vermin plate and a protective
grommet is fitted before the hose can be passed through.
The combustion air hose for the heater is attached to the large diameter
combustion air inlet.
the screws provided. When overlapped correctly the holes in both plates will
be aligned. Use remaining screws to fix the left hand vermin plate to the
wall.
9. Connect the condensate drain tube to the heater, refer p. 27.
10. Install rear panels and fasten the heater and panels to the internal
wall.
4. In the top plate directly above the transition assembly cut a hole for the flue path, the maximum width MUST NOT exceed 150 mm. Ensure the transition assembly is covered to prevent debris entering.
7. Move the right hand vermin plate along the hose until it is flush against
the wall then secure in place with the screws provided.
8. Screw the left hand vermin plate to the right hand vermin plate using
Energysaver flue installation guide: 10848-C 03-15 | 21
Horizontal through-wall vertical flueing
These types of installations are rare, but have been used on the odd occasion
where traditional flueing is not possible. A large portion of the flue will be
visible–check with the homeowner that this is okay.
A 2 ° fall is required from the wall penetration back towards the heater. This
will ensure the small amount of condensation in the short section between the
heater and condensate trap will burn off rapidly during normal operation.
Interior wall
Min’ required protrusion 50mm
Internal wall plate, outer face
Exterior wall
22mm x 3
Min’ required protrusion 50mm 7mm x 2
Exterior wall
Exterior wall
Exterior wall
22 | Energysaver flue installation guide: 10848-C 03-15
Steps for creating horizontal through-wall vertical flueing
Some ‘quirks’ associated with this type of installation: · Condensate trap
The condensate trap is attached to the heater from the outside. A longer
length of condensate tube is required (not supplied). This needs to be
connected back through to the heater via a separate hole, which needs to be
weathertight. An alternate option is to drain the condensate to a waste
drain/gully trap through a PVC line. For more information please contact
Rinnai.
· 2 ° fall back to the heater As there is a vertical component in the
installation condensate needs to be drained back towards the heater, this
requires the ESDFK component to be angled 2 ° back to the heater.
1. The creation of the horizontal section is the same as creating a direct or
direct extended flue installation, refer p. 14.
2. Slide the internal wall plate over the terminal end of the assembled flue
pipe until it is nested on the raised ring of the flue transition.
the heater or drain the condensate to a waste drain/gully trap, refer
‘condensate trap’ note above. If the condensate trap is being connected back
to the heater you will need a longer tube than the one supplied.
7. Make the heater exhaust connections.
3. Pass the assembly through the internal wall penetration until the internal wall plate is flush with the wall.
8. Install the rear spacer panels and fasten the heater and panels to the internal wall.
4. Slide the external wall plate over the outer pipe protruding through the exterior wall. Once the external wall plate is in the correct position secure it to the wall using the three screws in the holes provided. The wall plate is then secured to the outer pipe of the flue using the two horizontal holes and the two 7 mm screws provided.
5. Prepare the vertical section of the flue.
6. Either connect the condensate tube back to
Energysaver flue installation guide: 10848-C 03-15 | 23
Cutting to length (ESDFK, ESPIPE900)
Cutting of the last component in the flue assembly may be required to achieve
the required length. Cutting is also required at a wall penetration. Cutting
for both purposes is described below.
Important IMPORTANT The minimum length of the ESDFK when measured from the
back plate of the transition
casting MUST NOT be less than 300 mm when joining to other components.
Ensure all burrs and swarf are removed from any cut ends.
ESPIPE900, can be cut to size at the male end–do not cut the female end.
Cutting components to achieve the desired flue length
Min. 300 mm
12 mm
desired length
12 mm
12 mm desired length
1. Measure and mark off the outer pipe at the desired length. 2. Cut the
outer pipe to the required length. Take care not to cut the inner pipe. 3.
From the `new’ end of the outer pipe measure and mark off an additional 12 mm*
on the inner pipe.
Cut the inner pipe at this mark. Take care to keep the cut parallel to the
outer pipe.
Cutting components at a wall penetration
Min. ESDFK length
Allow 50mm beyond any wall penetration
300 mm
Required wall penetration
12 mm
12 mm
12 mm
50 mm Length to
wall
1. Measure and mark the outer pipe at a point flush with the surface of the
wall penetrated PLUS an additional 50 mm.
2. Cut the outer pipe to the required length. Take care not to cut the inner
pipe. 3. Refer step 3 above.
- The additional 12 mm on the inner pipe is needed to connect the flue terminal or ESBEND
24 | Energysaver flue installation guide: 10848-C 03-15
Connecting the heater exhaust and air supply
This step in the installation is critical. If this joint is not secured
properly, CAUTION products of combustion could disperse into the room being
heated.
Exhaust connection of the ESDFK and ESKIT03 (shaded sections) Exhaust
connection
ESDFK
ESDFK
When modified for use with sideways, and down-and-out flueing
ESKIT03
1. Lubricate the o-ring of the exhaust connection and fit the exhaust pipe of
the heater. Push the exhaust pipe fully home so the end of the exhaust
connection and the collar of the exhaust pipe are fully mated.
2. Attach the flue lock clamp*, provided with the heater, over the exhaust
pipe and transition adaptor. Ensure the teeth of the flue lock clamp engage
over the collar of the exhaust pipe AND the channel in the transition adaptor.
Close the clamp until the tab locks to secure both components together.
3. For the 559, 561, and 1005 models, use the adjustable telescopic tube of
the exhaust pipe to position the heater. DO NOT extend the telescopic tube
beyond the red indicator groove.
4. The combustion air hose is attached to the small diameter combustion air
inlet. Secure the combustion air hose to the combustion air inlet with the
cable tie supplied with the heater.
5. Secure the protective sock in place on the exhaust pipe using the
stainless steel sheath clamp provided with the heater.
6. Ensure the unused air intake is plugged using the rubber cap provided.
- 1005 model comes with two flue lock clamps, one large, and one small.
Maximum extension
Incorrect tube is over extended
Adjustment of telescopic tube for 559, 561, and 1005 models
Flue lock clamp
Combustion air hose attachment Securing the protective sock
Energysaver flue installation guide: 10848-C 03-15 | 25
Assembling a wall terminal
Only the ESDFK, and the ESPIPE900 /ESWTERM can be used to create a wall
terminal.
Steps to create a wall terminal
1
Exterior wall
Exterior wall
Exterior wall
1. Fit the supplied external wall plate over the outer pipe of the flue protrusion (arrow points up).
2° fall to the outside–arrows point up
Once the external wall plate is in the correct position secure it to the wall,
using the three 22 mm screws, and into the wall plate holes. Secure the wall
plate to the outer pipe using the two horizontal holes and the two 7 mm screws
provided.
2. Carefully cut through the outer and inner pipes (refer previous page).
Take care to avoid cutting the external wall plate, and keep the cuts of the
internal and external pipes as parallel as possible. Remove all burrs and
swarf from the cut ends.
3. Align the arrows of the metal flue terminal and wall plate to point in the
same direction (must always point up) and screw the terminal to the external
wall plate using the 22 mm screws into the holes provided.
26 | Energysaver flue installation guide: 10848-C 03-15
Connecting the condensate drain tube
The condensate drain kit is provided with the ESKIT03 (p. 9). It is used for
vertical flue installations that require draining of condensate back into the
heater.
1. Insert one end of the drain tube into the rubber drain outlet of the
condensate trap.
Rubber drain outlet
2. Carefully mark and drill a 10 mm deep hole in the rear panel of the heater–refer model dimensions below. For models 309FT, 559FT, and 561FT you must drill through the raised rear panel as well as the back panel of the heater.
Drain tube
Take care not to drill deeper than 10 mm into the back panel of the heater as this may CAUTION damage internal components , such as the heat exchanger.
3. Feed approximately 60 mm of the free end of the drain tube through the
hole created in step 2, ensuring that any condensate can drain into the
condensate tray of the heater.
DO NOT allow the drain tube to come into contact with any part of the heat
CAUTION exchanger.
4. Secure the drain tube to the rear of the appliance with a pipe clip.
RHFE-309FT
RHFE-559FT
RHFE-561FT
75* 120
RHFE-1005FT
510** 100
115*
115*
80
120
All vertical measurements are from floor level.
- The horizontal measurement for the 309, 559, and 561 are taken from the edge of the raised rear panel.
** The horizontal measurement for the 1005 is taken from the inside edge of the rear panel.
Energysaver flue installation guide: 10848-C 03-15 | 27
Experience our innovation
Rinnai.co.nz 0800 746 624
http://www.youtube.com/rinnainz http://www.facebook.com/rinnainz
Energysaver flue installation guide: 10848-C 03-15
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>