  1. Determine quantities of enclosure and accessories required per wall or run. If the installation is wall-to-wall, run the backplate to within ½” of adjoining walls). If the run ends with an end cap, extend the backplate beyond the end of the required enclosure 1-1/2″ for 3″ end cap and 6″ for 9″ end cap.
  2. Mount the backplate (full or partial) to the wall at the prescribed height (Refer to Submittal Drawing) making sure that it is straight and level. If valve compartments are being used, make sure that an equivalent amount of backplate is installed.
  3. Hot Water Systems or Steam Systems (Two Pipe): Vertical wall brackets are used with bracket mounted hangers to support the elements). Hot water systems do not require a pitch for the element. If a second tier (row) of element is to be installed, mount the bracket mounted hangers to the vertical wall bracket using the 5/16-18 carriage bolt and nut supplied before installation of the vertical brackets to the wall.
  4. Install two (2) vertical brackets per element length up to 6′-0″ in length. Three (3) vertical brackets with a bracket mounted hangers per element length 6′-6″ up to 12′-6″ (8′-0″ for ¾” copper/aluminium) | of length. (Accessories do not require brackets). Insert the top of the bracket into the ‘V’ bend of the backplate (Full or Partial) and insert it onto the horizontal flange of the Partial backplate. Secure brackets to the wall using fasteners (as specified) by others. Supply/Return Pipe hangers (if required) can be mounted to the wall adjacent to the water bracket (every other one).
  5. Lay out the heating element as required. Place slide cradle onto the bottom of element at each bracket location. The element cradle has two legs that angle out slightly. Position the legs between the fins so there is tension against the legs. This holds the cradles in position. For Two Pipe Steam systems adjust the element pitch by raising the bracket mounted hanger and tightening the nut to secure hanger into position. Second-tier elements mounted on the bracket-mounted hangers can be adjusted up or down. Check submittal drawing for correct position of the element in. For copper tube elements, flush the loop or series with system water after soldering to neutralize the remaining flux material and prevent corrosive action and resulting pinhole leaks.
  6.  The enclosure can now be installed. Start the enclosure at the left end of the run working clockwise. The enclosure back bend mounts crept into tens of pace one. um, Russ completes securing the bottom of enclosure to wall with fasteners supplied by others. Do not tighten these fasteners until accessories are installed.
  7. Install overlapping accessories as indicated on room schedule. All accessories are overlapping. Valve Compartments are installed the same as enclosure. The top back bend is slipped between the wall and the backplate. The accessory bottom returns to the wall and is secured with fasteners supplied by others.

MAINTENANCE

Before each heating season, remove accessories and enclosure panels to inspect finned tube elements for accumulation of dust or prove distan ayatom oil ang biharto dean ions. (machine oil) onto each ball bearing (where applicable) located in the water brackets or bracket mounted hangers. Replace the cover and accessories.

GENERAL LAYOUT

STERLING-JVB-SS-Versa-Line-Commercial-Finned-Tube-Radiation-
fig-1

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

STERLING User Manuals

Related Manuals