DYNOJET PC6-17012 Power Commander 6 Installation Guide
- June 3, 2024
- Dynojet
Table of Contents
POWER COMMANDER 6
Installation Guide for PC6-17012
Model Coverage: 2006-2011 Kawasaki ZX-14R
PC6-17012 Power Commander 6
PARTS LIST
1 POWER COMMANDER 6
1 INSTALLATION GUIDE
1 USB CABLE
2 DYNOJET DECALS
2 POWER COMMANDER DECALS
2 VELCRO STRIPS
1 ALCOHOL SWAB
2 ZIP TIES
PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION.
THE IGNITION MUST BE TURNED OFF BEFORE INSTALLATION.
INPUT ACCESSORY GUIDE
OPTIONAL ACCESSORY INPUTS
Map
(Input 1 or 2) The PC6 has the ability to hold 2 different base maps. You can
switch on the fl y between these two base maps when you hook up a switch to the
MAP inputs. You can use any open/close type switch. The polarity of the wires
is not important.
Shifter
(Input 1 or 2) Used for clutch-less full-throttle upshifts. Insert the wires
from the Dynojet quick shifter into either Input 1 or Input 2. The polarity
of the wires is not important. Set to Input 2 by default.
Speed
If your application has a speed sensor then you can tap into the signal side
of the sensor and run a wire into this input. This will allow you to calculate
gear position in the Control Center Software. Once gear position is set up you
can alter your map based on gear position and setup gear-dependent kill times
when using a quick shifter.
Analog
This input is for a 0-5v signal such as engine temp, boost, etc. Once this
input is established you can alter your
fuel curve based on this input in the Power Core software.
Launch You can connect a wire to either Input 1 or Input 2 and then the other
end to a switch. This switch when engaged (continuity) will only allow the RPM
to be raised to a certain limit (set in the software). When released, you
will have full RPM.
WIRE CONNECTIONS
To input wires into the PC6 first remove the rubber plug on the backside of the
unit and loosen the screw for the corresponding input. Using a 22-24 gauge
wire, strip about 10mm from its end. Push the wire into the hole of the PC6
until it stops and then tightens the screw. Make sure to reinstall the rubber
plug.
NOTE: If you tin the wires with solder it will make inserting them
easier.
2 2006-2011 KAWASAKI ZX-14R
INSTALLING THE POWER COMMANDER 6
-
Remove the left-hand fairing and inner fairing.
-
Remove the bolts that hold the coolant reserve bottle to the engine.
Let the bottle hang out of the way temporarily. -
Disconnect the stock wiring harness from the throttle body harness.
These connectors are BROWN in color and are located under the throttle bodies.
PC6-17012 -
Lay the PC6 next to the gauge panel temporarily and route the PC6 harness along the stock wiring harness to the throttle body connection. Use the supplied zip ties to secure the PC6 wiring harness.
-
Connect the PC6 in line with the stock wiring harness and throttle body harness.
-
Attach the ground wire from the PC6 to the engine using one of the left engine cover bolts.
-
Reinstall the coolant bottle.
-
Install the PC6 to the left-hand ram air tube. Use the supplied velcro to secure the PC6.
-
Reinstall the bodywork.
This bike uses a servo to hold the throttle plate open during cold starts. Make sure the bike is up to operating temperature BEFORE resetting the throttle position on the PCV software.
Download the latest map files from our website at
dynojet.com/tunes.
Optional inputs:
Speed – YELLOW wire of speed sensor on the front sprocket cover.
12v source for Autotune – the RED wire of the Ignition Switch harness. Located
underneath the L.H. ram air tube (near PC6 install).
2006-2011 KAWASAKI ZX-14R
PUSH THE LIMIT
2191 MENDENHALL DRIVE, NORTH LAS VEGAS,
NV 89081 – 800-992-4993 –
DYNOJET.COM
© 2006-2022 DYNOJET RESEARCH ALL RIGHTS RESERVED
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>