VEVOR 0.5-H Electric Hoist Manual Trolley User Manual
- June 1, 2024
- VEVOR
Table of Contents
VEVOR 0.5-H Electric Hoist Manual Trolley
Specifications:
- Model: 0.5-H, 1T-H
- Load Capacity: 0.5 Ton (1100 lbs) for 0.5-H model, 1 Ton (2200 lbs) for 1T-H model
- I-beam / H-beam track: Rail width of 2.36-4.72 inches (60-120mm) for 0.5-H model, 2.68-4.33 inches (68-110mm) for 1T-H model
- Colour: Orange
Product Usage Instructions
Installation of Trolley onto Beam:
- Ensure to read all manual instructions carefully before operating the trolley.
- The trolley is designed for horizontally transporting loads by hand through an electric hoist under normal atmospheric conditions.
- Match the trolley with the appropriate electric hoist based on the load capacity.
- When coupling the trolley with the hoist, adjust with the required spacer washers to ensure proper alignment.
- Assemble nuts to the suspension pin securely.
Safety Inspection:
Perform a safety inspection before each use to ensure all components are in
proper working condition.
Maintenance:
Avoid prolonged exposure to sunlight to prevent aging of the trolley.
FAQ:
Q: What is the intended purpose of the manual trolley?
A: The trolley is designed for horizontally transporting loads by hand
through an electric hoist under normal atmospheric conditions.
Q: How should I match the trolley with the electric hoist?
A: The 1100lbs trolley is suitable for a PA200-PA500 electric hoist,
while the 2200lbs trolley matches the needs of the job for the PA600-PA1000
electric hoist.
Q: What should I do during trolley and hoist coupling?
A: Adjust the trolley with spacer washers to ensure proper alignment and
secure nuts to the suspension pin.
NEED HELP? CONTACT US!
Have product questions? Need technical support? Please feel free to contact
us:
Technical Support and E-Warranty Certificate www.vevor.com/support
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won’t inform you again if there are any technology or software updates on our product.
Installation of trolley onto beam
- The preferred method of installation is from the end of the beam, with the chain hoist and the trolley coupled. After installation, check that all the nuts are correctly tightened. Fit the travel limit stops (not provided) at the end of the runway.
- When there is no space between the end of the beam and building, first remove the side plate from the suspension shaft. After placing the side plate on the other side of the flange, re-assemble and re-install side plate as it was before. Also, bend securely the split pin of the shaft stopper pin. After installation, check that all the nuts are correctly tightened.
Safety Inspection
- The danger exists when heavy loads are transported, particularly when the equipment is not being used properly or is poorly maintained. Because accidents and serious injury could result, special safety precautions apply to the operation, maintenance. The hoist may lift and hold a load more than the rated loads. Check that structure for mounting the trolley has sufficient strength.
- Check that the correct Trolley and the capacity of lifting equipment attached to the Trolley are suitable for the job at hand. Visually check that the Trolley has been delivered and/or stored in a safe and undamaged condition.
- Slacken off the suspension pin nuts & spread the side plates so that the wheels can be slipped over the runway beam. Screw the nuts firmly against the washers. Then suspend a light load to the trolley to ensure that all four wheels contact the runway beam. Screw the nuts tightly against the washers, then secure them with lockouts. NUTS MUST BE TIGHT.
- Suspend the Maximum Safe Working Load to the trolley, and then run the unit slowly along the full length of the runway beam to ensure satisfactory operation. Once the unit is fitted – check that the clearance between the beam’s outer edge and the trolley wheel is equal on both sides. Also, check that the Beam End Stops have been fitted to the beam.
- Ensure that the load bar has been assembled correctly. The Loadbar should also be checked for wear, defects, and deformations, or
superficial/corrosion marks before every use.
Intended purpose
This trolley is designed for horizontally transporting loads by hand, through
an electric hoist under normal atmospheric conditions of the workplace. The
1100lbs trolley is suitable for a PA200-PA500 electric hoist. The 2200lbs
trolley Match the needs of the job for the PA600-PA1000 electric hoist.
Main structure
- Side Locking Nut
- Trolley Pin
- Side Plate
- Steel Wheel
- Casing Gaskets
- Bracket
- Mounting Hole
MAINTENANCE
Model | 0.5- H | 1T- H |
---|
Load Capacity
| Ton| 0.5| 1
lbs| 1100| 2200
I-beam /| |
H-beam track| 2.36-4.72| 2.68-4.33
Rail width inches| (60-120mm)| (68-110mm)
(mm)| |
Colour| Orange
When the trolley and the hoist are coupled, the trolley must be adjusted with the adjusting spacers. Assemble the required number of spacer washers equally to the inside of the trolley side plates so that the dimension between the Trolley Wheel Flanges is about 1/4inch (6mm) greater than the runway beam width. Then assemble the nuts to the suspension pin.
- Avoid prolonged exposure to the sun to avoid aging.
Technical Support and E-Warranty Certificate www.vevor.com/support
Manual Trolley
Model: 0.5-H, 1T-H
We continue to be committed to provide you tools with competitive price.
“Save Half”, “Half Price” or any other similar expressions used by us only
represents an estimate of savings you might benefit from buying certain tools
with us compared to the major top brands and does not necessarily mean to
cover all categories of tools offered by us.
You are kindly reminded to verify carefully when you are placing an order with
us if you are actually saving half in comparison with the top major brands.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>