greenworks GWU-BAT-5.0 Power nHub LFP Battery Installation Guide

June 1, 2024
Greenworks

GWU-BAT-5.0 Power nHub LFP Battery

“`html

Product Specifications:

  • Battery Model: Greenworks Lithium-ion Battery 100 Ah
  • Product Name: BMS (GWU-BAT-BMS)
  • IP Rating: IP65
  • Installation Modes: Floor Mounting

Product Usage Instructions:

Installation Prerequisites:

Ensure that the installation location meets the following
conditions:

  • The battery module is rated at IP65 for outdoor and indoor
    installation.

  • Avoid direct sunlight and moisture exposure for outdoor
    installations.

  • For initial installation, the battery modules’ manufacture
    dates should not exceed a 3-month interval.

Steps for Floor Mounting:

Step 1: Place Base

  1. Remove the dust cover from the Base.
  2. Insert M8*85 screws from the bottom of the Base to ensure it is
    even.

Step 2: Locate Base Position

Distance from equipment to ceiling/ground should be reserved for
capacity expansion. Follow Scheme C for reference.

  1. Place the Base 1.57 in./40 mm away from the wall and mark the
    locations accurately on both sides.

Step 3: Place Battery Module on Base

  1. Remove the top and bottom dust covers from the Battery
    Module.

  2. Place the Battery Module on the Base.

Frequently Asked Questions (FAQ):

Q: Can the battery module be installed outdoors?

A: Yes, the battery module is rated at IP65 and can be installed
both outdoors and indoors. Ensure to avoid direct sunlight and
moisture exposure for outdoor installations.

Q: What should be considered for the first installation of

battery modules?

A: The manufacture dates of battery modules should not exceed a
3-month interval for the first installation.

“`

I

Packing List

Note: The Quick Installation Guide briefly describes required installation steps. If you have any question, please refer to the User Manual delivered with the BMS for details.

BMS (GWU-BAT-BMS):

All Accessories Required for Two Installation Modes

Quick Installation Guide
—- Greenworks Lithium-ion Battery 100 Ah

BMS x 1

User Manual x 1

One Battery Module (GWU-BAT-5.0H×1):

Transverse Plate x 1 Expansion Screw x 6 Adjustment Screw x 4

M5*8 Countersunk Head Screw x 4

Washer x 6

Wall Bracket x 2 Expansion Bolt x 4 Platen (2 holes) x 2 Washer x 2

Base Support x 2

M5*20 Countersunk Screw x 6

Self-tapping Screw x 6

Base for BAT50-G2 Battery:

Tapping Screw x 2 M5*10 Phillips-head Screw x 10

Battery Module x 1 Platen (3 holes) x 2 Quick Installation Guide x 1

Base x 1

II

Installation Prerequisites

Ensure that the installation location meets the following conditions:
Y The building is designed to withstand earthquakes Y The location is far from the sea to avoid salt water and humidity, over 3280.84 ft/1000 m Y The floor is flat and level Y There are no flammable or explosive materials, at a minimum of 2.95 ft/0.9 m Y The ambience is shady and cool, away from heat and direct sunlight Y The temperature and humidity remain at a constant level Y There is minimal dust and dirt in area Y There are no corrosive gases present, including ammonia and acid vapor Y Where charging and discharging, the ambient temperature ranges from 32°F/0°C to 113°F/45°C
In practice, the requirements of battery installation may be different due to enviroment and locations. In that case, follow up the exact requirements of the local laws and standards.
Note!
The Greenworks battery module is rated at IP65 and thus can be installed outdoors as well as indoors. However, if installed outdoors, the battery pack shall not be exposed to direct sunlight and moisture.
Note!
If the ambient temperature exceeds the operating range, the battery pack will stop running to protect itself. The optimal temperature range for operation is 14°F/-10°C to 122°F/50°C. Frequent exposure to harsh temperatures may deteriorate its performance and lifetime.
Note!
For the first installation, the interval among manufacture dates of battery modules shall not exceed 3 months.

IV

Steps (Floor Mounting)

Please reserve enough distance from the equipment to the ceiling/ground for capacity expansion. Take Scheme C as an example.

Step 1: Place Base. (1) Remove the dust cover.

(2) Insert M8*85 screws from the bottom of Base, to ensure that the Base is even.

Step 2: Locate the Base 1.57 in./40 mm away from the wall, accurately mark the location of the Base on both sides with a pen.

III

Overview (Floor Mounting)

Scheme A

BMS

2 Wall Bracket 2 Expansion Bolt

31.81 in./808 mm

Battery

2 Tapping Screw 2 Washer

Battery

14 M510 Screw 2 * Platen (3 holes)

Base

4 * Platen (2 holes)

Distance from the equipment: To left side: 11.81 in./300 mm To right side: 11.81 in./300 mm

Scheme B

BMS Battery

4 Wall Bracket 4 Expansion Bolt

43.62 in./1,108 mm

Battery Battery

4 Tapping Screw 4 Washer 20 M510 Screw 4 Platen (3 holes) 4 Platen (2 holes)

Base
Distance from the equipment: To left side: 11.81 in./300 To right side: 11.81 in./300 mm

Scheme C BMS

Battery Battery Battery Battery

55.43 in./1,408 mm

4 Wall Bracket 4 Expansion Bolt 4 Tapping Screw 4 Washer 24 M510 Screw 4 Platen (3 holes) 6 Platen (2 holes)

Base
Distance from the equipment: To left side: 11.81 in./300 mm To right side: 11.81 in./300 mm

BMS Battery Battery
Base
BMS Battery Battery Battery
Base
BMS Battery Battery Battery Battery
Base

BMS Battery Battery
Base
BMS Battery Battery Battery
Base
BMS Battery Battery Battery Battery
Base

M8*85×4

Note! (a) Use a spirit level to measure the sides of the Base to ensure they are even. (b) If not, please adjust the Adjustment Screws by a torque wrench being to ensure that the Base is even.
Step 3: Place Battery Module on the Base. (1) Remove the top and bottom dust covers. (2) Place the Battery Module on the Base.

Mark

14.057mimn
Right View

14.057minm

Step 5: (1) Attach M5 * 10 screw to Wall Bracket but be sure not to tighten; (2) Place Wall Bracket to the wall, align its holes to the holes on the Battery, and use a spirit level to ensure it’s even; (3) Accurately mark the location of the Wall Bracket on both sides; (4) Draw circles according to the actual stub spacing; (5) Remove the Wall Bracket, and then drill the two holes (at least 3.54 in./90 mm) by a Drill (Ø 0.39 in./10 mm).

(1)

(2)

Note!
If the Base is shifted after placing a Battery Module, move it to its original location according to the mark previously drawn.

Mark

(3) Fix the Platen (2 holes) using M5 10 Phillips-head screw, and secure M510 screws at both sides (Torque: 2.2-2.5 N·m).

Attach screw but not tighten

Platen (2 holes) × 2 M510 Screw × 4 2.2-2.5 N·m
Step 4: Place two Battery Modules in turn, and secure both left and right sides using M5
10 countersunk screws (Tighten torque: 2.22.5 N·m). Refer to the Step 3 (3). Please secure Platen and M5*10 screws immediately after placing a Battery Module.

Ø 0.39 in./10 mm for Wall Bracket
3.54 in./ 90° 90 mm
Note! Electric drill dust collector is recommended.
Step 6: Place Expansion Bolts.

Step 3 (3)

Platen (2 holes) × 4 M5*10 Screw × 8 2.2-2.5 N·m

Step 7: Place the Wall Bracket on the wall where the mark is drawn previously, and secure it using Tapping Screws and Washers.
Mark
Attach screw but not tighten, and align the hole location of
battery Tapping Screw × 2
Washer × 2 Wall Bracket × 2
Step 8: Place the fourth battery module.
Let the Platen down
Step 9: Fix the Platen (3 holes), and tighten M510 screws on both sides (Torque: 2.2-2.5 N·m).
Platen (3 holes) × 2 M5
10 Screw × 6 2.2-2.5 N·m

Step 10: (1) Attach M5 10 screw to Wall Bracket but be sure not to tighten; (2) Place such Wall Bracket to the wall, align its holes to the holes on the Battery Module, and use a spirit level to ensure it’s even; (3) Accurately mark the location of the Wall Bracket on both sides with a pen; (4) Draw circles according to the actual stub spacing; (5) Remove the Wall Bracket, and drill two holes (at least 3.54 in/90 mm) by a Drill (Ø 0.39 in./10 mm); (6) Place Expansion Bolts; (7) Secure Wall Brackets. Refer to the Steps 5, 6, 7 and 8.
Step 5, 6, 7 and 8
Mark
Let the Platen down
Tapping Screw × 2 Washer × 2
Wall Bracket × 2
Note! Electric drill dust collector is recommended.
Step 11: Place BMS on the Battery Module. (1) Remove the bottom dust cover.
(2) Place BMS, fix the Platen (3 holes) on both sides, and then tighten M5
10 screws (Torque: 2.2-2.5 N·m). Refer to Step 9.
Step 9
Platen (3 holes) × 2 M5*10 Screw × 6 2.2-2.5 N·m
Note! The holes on BMS is for secure inverter. For details, please refer to GWU-GreenE User Manual.

V

Overview (Wall Mounting)

Scheme A

BMS Battery
Battery Base

31.81 in./808 mm

2 Wall Bracket 2 Expansion Bolt 2 Tapping Screw 2 Washer 14 M510 Screw 2 Platen (3 holes) 4 Platen (2 holes)

BMS Battery
Battery Base

Distance from the equipment: To left side: 11.81 in./300 mm To right side: 11.81 in./300 mm To the ground : 23.62 in./600 mm (The distance is reserved for increase of battery, and a battery’s height is 11.81 in./300 mm.)

Scheme B

BMS Battery
Battery Base

BMS Battery Battery
Battery Base

43.62 in./1,108 mm

4 Wall Bracket 4 Expansion Bolt 4 Tapping Screw 4 Washer 20 M510 Screw 4 Platen (3 holes) 4 Platen (2 holes)

BMS Battery
Battery
Battery Base

BMS Battery
Battery Battery Base

Distance from the equipment: To left side: 11.81 in./300 mm To right side: 11.81 in./300 mm To the ground: > 11.81 in./300 mm (The distance is reserved for increase of battery, and a battery’s height is 11.81 in./300 mm.)
Scheme C

BMS Battery Battery
Battery Battery
Base

55.43 in./1,408 mm

4 Wall Bracket 4 Expansion Bolt 4 Tapping Screw 4 Washer 24 M510 Screw 4 Platen (3 holes) 6 Platen (2 holes)

Distance from the equipment: To left side: 11.81 in./300 mm To right side: 11.81 in./300 mm To the ground: It shall be decided according to the local regulations.

BMS Battery Battery
Battery Battery
Base

BMS Battery Battery Battery
Battery Base

Step 5: Place Battery Module on the Base. (1) Remove the top and bottom dust covers. (2) Place the Battery Module on the Base.

Step 7: (1) Attach the M5 * 10 screw to Wall Bracket but be sure not to tighten; (2) Place such Wall Bracket to the wall, align its holes to the holes on the Battery Module, and use a spirit level to ensure it’s even; (3) Accurately mark the location of the Wall Bracket on both sides with a pen; (4) Draw circles according to the actual stub spacing; (5) Remove the Wall Bracket, and then drill the two holes (at least 3.54 in./90 mm) by a Drill (Ø 0.39 in./10 mm).

Mark

(1)

(2)

(3) Fix the Platen (2 holes) using M5 10 Phillips-head screw, and secure M510 screws at both sides (Torque: 2.2-2.5 N·m).

Attach screw but not tighten
Ø 0.39 in./10 mm for Wall Bracket
90° 3.54 in./ 90 mm

Platen (2 holes) × 2 M510 Screw × 4 2.2-2.5 N·m
Step 6: Place two Battery Modules in turn, and secure both left and right sides with screws (4 × M5
20 countersunk screw) (Tighten torque: 2.2-2.5 N·m). Refer to the Step 5 (3). Please secure Platen and M5*10 screws immediately after placing a Battery Module.
Step 5 (3)

Note! Electric drill dust collector is recommended.
Step 8: Place Expansion Bolts into the two holes (the Expansion Bolt is not required in case of solid wood wall).

VI

Steps (Wall Mounting)

Please reserve enough distance from the equipment to the ceiling/ground for capacity expansion. Take Scheme C as an example.
Step 1: There are two ways to install Transverse Plate to Base Support due to 4 kinds of Stub Spacing, with details as follows: (a) 28 in./711.20 mm or 32 in./812.80 mm; (b) 20 in./508.00 mm or 24 in./609.60 mm. (1) Insert Transverse Plate to Base Support; (2) Secure the Transverse Plate and Base Support using screws (2×M5*8 countersunk head screw) (Tighten torque: 2.2-2.5 N·m). See figure below.

32 28

in./812.80 in./711.20

mm mm

M5*8 × 2 2.2-2.5 N·m

2204inin..//560089..0600mmmm

M5*8 × 2 2.2-2.5 N·m

(a)

(b)

Step 2: (1) Place the assembled Transverse Plate and Base Support on the wall, look the cylindrical plastic bubble spirit level on the Transverse Plate. If the bubble isn’t in the center, slightly bow it to the horizontal. (2) Then determine the position of holes. (3) Mark it with a pen. (4) Remove it and drill the four holes (at least 3.54 in./90 mm) by Drill (Ø 0.47 in./12 mm for concrete wall, or Ø 0.31 in./8 mm solid wood wall).

Step 3: (1) Place the assembled Transverse Plate and Base Support to the wall (or solid wood stub); (2) Attach the Expansion Screw to the holes but be sure not to tighten; (3) Check whether the bubble spirit level is horizontal; (4) Hammer Expansion Screws with a rubber mallet (except solid wood wall), and tighten it with torque wrench.

32 in./812.80 mm

Ø 0.47 in./12 mm for Base Support
90º 3.54 in./ 90 mm

32 in./812.80 mm

Bubble spirit level
Ground Note: The distance from the Base to the ground is decided according to the local regulations.

(1) Concrete Wall
Ø 0.31 in./8 mm for Base Support
90º 1.97 in./ 50 mm
(2) Solid Wood Wall

Bubble spirit level

x 4
Ø 0.31 in./8 mm For solid wood wall
x 4
Ø 0.47 in./12 mm For concrete wall

Note: In case of solid wood wall, please directly tighten the screws with torque wrench instead of hammering them with rubber mallet.

Note: The bubble spirit level on the Transverse Plate can be used as an auxiliary tool, additionally, please prepare a spirit level to measure whether the Plate is even or not.

Step 4: Place the base. (1) Remove the dust cover.

(2) Place Base on the Base Support and secure both left and right sides with screws (4 × M5*20 countersunk screw) (Tighten torque: 2.2-2.5 N·m).

32 in./812.80 mm

Step 9: Place the Wall Bracket on the wall where the mark is drawn previously, and then secure the Wall Brackets on the wall using Tapping Screws and Washers.
Mark
Attach screw but not tighten, and align the hole location of battery
Tapping Screw × 2 Washer × 2
Wall Bracket × 2

M520 Screw × 4 2.2 – 2.5 N·m
Step 12: (1) Attach the M5
10 screw to Wall Bracket but be sure not to tighten; (2) Place such Wall Bracket to the wall, align its holes to the holes on the Battery Module, and use a spirit level to ensure it’s even; (3) Accurately mark the location of the Wall Bracket on both sides with a pen; (4) Draw circles according to the actual stub spacing; (5) Remove the Wall Bracket, and then drill the two holes (at least 3.54 in./90 mm) by a Drill (Ø 0.39 in./10 mm); (6) Place Expansion Bolts; (7) Secure Wall Brackets using Tapping Screws and Washers. Refer to the Steps 7, 8, 9 and 10.
Steps 7, 8, 9 and 10
Mark

Step 10: Place the fourth battery module.

Let the Platen down
Tapping Screw × 2 Washer × 2
Wall Bracket × 2

Let the Platen down

Note! Electric drill dust collector is recommended.
Step 13: Place BMS on the Battery Module. (1) Remove the bottom dust cover.

Step 11: Fix the Platen (3 holes), and secure M5*10 screws on both sides(Torque: 2.2-2.5 N·m).

(2) Place BMS, fix the Platen (3 holes) on both sides, and then tighten M5*10 screws (Torque: 2.2-2.5 N·m). Refer to Step 11.
Step 11

Step 5 (3)

Platen (3 holes) × 2 M5*10 Screw × 6 2.2-2.5 N·m

Platen (3 holes) × 2 M5*10 Screw × 6 2.2-2.5 N·m

Platen (2 holes) × 4 M5*10 Screw × 8 2.2-2.5 N·m

Note!
The holes on BMS is for secure inverter. For details, please refer to GWU- GreenE User Manual.

VII

Wiring

Making a BMS communication cable
To ensure normal operation of BMS and inverter, a BMS communication cable is required to be made before wiring. The specific definition of the communication cable is shown as follows:

Sequence 1

2

3

4

5

6

7

8

BMS

/

GND / BMS_H BMS_L /

A1

B1

The wire order of the communication cable is as follows:

12 3 4 5 6 7 8

  1. Orange stripes on white 2) Orange 3) Green stripes on white 4) Blue 5) Blue stripes on white 6) Green 7) Brown stripes on white 8) Brown

Note! The BMS communication cable shall have a shield layer.

Before wiring, 1. Unscrew the cap at BMS clockwise; 2. Unscrew the screws at BAT+ and BAT- respectively.

BMS DIP

BAT+

BAT-

POWER

After wiring

Insert the orange power line into the orange socket Insert the black power line into the black socket Screw the communication line into the communication socket
Note! Don’t violently remove cables when they are locked.

VIII

Commissioning

Steps for commissioning are shown as follows: Press the left side door panel
Open the air switch’s guard and toggle switch, to ensure that the inverter does charge to the battery Press the right side door panel
Press the button for 1 to 2 sec, and then the system starts

Press the left side door panel

On

Off

Press the right side door panel
BMS DIP

BAT+

BATPOWER

Black Start: Press the POWER button and hold it for 20 sec; release the button after the four SOC indicators flash blue alternately. But, we do not recommend the use of Black Start as it may cause the port to be charged, resulting in an electric shock.
If the batteries have not been used for more than 9 months, these batteries must be charged to at least SOC 50 % each time. For the first installation, the interval among manufacture dates of battery modules shall not exceed 3 months. If a battery is replaced or added for capacity expansion, each battery’s SOC should be consistent. The max. SOC difference should be between ±5%. If users want to increase their battery system capacity, please ensure that the SOC of the existing system capacity is about 40%. The manufacture date of the new battery shall not exceed 6 months; in case of exceeding 6 months, please charge the new battery to around 40%.
The equipment can support capacity expansion. There are two circumstances in case the user wants to increase a battery module: 1. For floor mounting, remove the inverter before increase of battery module; 2. For wall mounting, if the distance from the equipment to the ground is enough, do not remove the inverter; otherwise, the inverter shall be removed.
320102088001

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Greenworks User Manuals

Related Manuals