Cinderella Travel Incineration Toilet Instruction Manual

May 15, 2024
Cinderella

CINDERELLA TRAVEL
Model Cinderella Travel
Cinderella Travel Incineration Toilet - Cover
Cinderella Travel Installation Manual
Installation of Cinderella Travel (Serial number):

GENERAL INFORMATION

NOTICE!
It is important to read this guide from start to finish and consider all the details of installing Cinderella Travel before you begin with the actual documentation and installation.
Temperatures indicated in the instruction are the maximum temperature you may expect with proper installation. Improper/faulty installations may result in higher temperatures.

WARRANTY
The three (3) years warranty of the Cinderella Travel will be null and void if found that an improper installation is carried out. Improper installation may affect the following:

  • Service intervals
  • Incineration deficiency
  • Lifetime of the toilet or parts
  • Warranty

PLANNING THE INSTALLATION
Before you begin, you should prepare a plan to cover several important elements. These elements include:

  • Be sure to check that you have sufficient space surrounding the toilet for ease of use and access for service and maintenance
  • Feeding and mounting the exhaust hose through the roof
  • Feeding and mounting the inlet air hose through the floor
  • Hatches for access to connections
  • Power cable routing
  • Gas supply routing
  • Location of the control panel

INSTALLATION

SKETCH OF AN INSTALLATION

Cinderella Travel Incineration Toilet - INSTALLATION 1

PLACING THE TOILET
The toilet has a Build-in module that must be built into the wall. You can also create a box around the Build-in module. Clearance between Build-in module and rear wall is  recommended, approx. 5 mm.
Please note that recommended panel thickness is 8 mm, and a thicker panel will reduce the space for insulation around the exhaust hose. Sufficient insulation space must be maintained, in order to maintain the insulation properties.
If the floor is molded in a hard plastic material, preventing you from placing the toilet where you would prefer it, the material may need to be removed, and a new floor installed, unless it is possible to modify parts of the floor. You should consider that the ash container insert regularly must be emptied. This will require at least 40 cm space in front of the toilet. There must be at least 5 cm clearance on each side of the toilet but keep user comfort in mind and provide extra space if possible.
The toilet has four fixing points to the floor. Remove ash container for access. If the bathroom has floor heating, take precautions when fixing the toilet to the floor. We also recommend that you place bowl liners in near and easy reach of the toilet for ease of use and to ensure correct use. Two different bowl liner holders are available from reseller/producer.

EXHAUST AIR
Exhaust hose with insulation is fed from roof feed-though flange to the toilet and secured at each end with a powerful hose clamp that is included in the installation kit. Avoid horizontal stretches (max. 60 cm) and turns as far as possible as this creates counter pressure and will cause increased stress on the toilet over time and the possibility of overheating. Bends should be as gentle as possible. Under no circumstances should negative fall or sharp 90° bends occur as this will cause overheating of the product. The insulation must not be squeezed as this affects the insulating and special care must be taken for proper sealing in both ends. Exhaust hose should be mounted to toilet and feed-through flange with sealant paste around the exhaust to avoid leakage.
On top of the roof feed-through flange, a chimney cap is mounted, this is included in the toilet box. If there are larger objects within one meter of chimney cap, or if there is snow on the roof that can prevent air low, an extension must be mounted between the flange and the chimney cap.
The roof feed-through flange must be placed in a flat area of the roof, to ensure proper sealing. Find a suitable place where the flange makes good contact with the roof and make a hole in the roof with an 83 mm hole saw. Take precautions when making the hole through the roof, to avoid electric cables.
Be sure to use enough sealant between the flange and roof to ensure no water ingress. Roof feed-through is in material quality EN 1.4016. Take necessary precautions to avoid galvanic corrosions.
Fasten roof feed-through flange with appropriate stainless-steel screws.

INLET AIR
An inlet air hose is included in the installation box. Use an 83 mm hole saw for implementation in flooring. An optional floor nozzle is available for double floors. Consider air supply into double floor compartment for sufficient air low.
If the wheel arch or other obstructions prevent the hose from going directly down, it can be bypassed, but make sure the hose is routed with gentle bends and as short a stretch as possible, maximum hose length 120 cm. Finish with floor nozzle under floor exterior. The hose may be insulated, if desired.
An air grate can be used in both loor and wall, but make sure you have a minimum 50 cm² light opening and that you protect against water intrusion. Please note that loor intake is preferred instead of wall intake. If the toilet in large parts of the year is used in cool climates that experience extreme cold for extended periods, condensation may form on the outside of the toilet. It may be advantageous to preheat the air in. This can be done using a radiator connected to the heating system that preheats the air.

GAS INSTALLATION
NOTICE!
Please note that a sticker is delivered with the toilet for marking of the gas shut-of valve and this sticker is mandatory in some countries.
Please be aware that regulations regarding gas installations in vehicles vary from country to country. The installation may require certified personnel in order to be approved. Be sure to research the local regulations where you live and adhere to these before installation.
The gas is supplied through an 8 mm pipe directly to the toilet with an angled compression fitting on top of the Build-in module. No adjustment of fitting is allowed. The toilet is designed to run on propane. If you know that you frequent areas with low quality propane, a liter should be considered. A separate gas shut-of valve is required when connecting to an existing gas supply line.
This will aid trouble shooting and allow operation of other appliances in case the toilet is dismounted. The connector is a brass compression coupling which takes ø8 pipe. Be sure to clamp the pipe close to the fitting to avoid stress fatigue in the pipe.

INSPECTION HATCH
There must be access to the top of the Build-in module for easy access to connections. This allows for annual inspection and leak testing of the gas connection.

CONTROL PANEL
Locate the desired placement of the control panel.
Create an opening for the signal cable and route the cable out here. The signal cable is a flat cable with approx. 20 mm width. Connect the signal cable together with the control cable and fasten the control panel. The signal cable can be connected in two ways, but only one way is correct. If you get a red light, and not a green, reconnect signal cable the opposite way. The signal cable is approx. 150 cm long.

CONNECTING AND TEST OF TOILET
Testing procedure after installation and before adding panels and closing hatches

  • Open main gas supply valve from gas container
  • Check for gas leakages on supply line
  • Turn on main switch located inside toilet, see illustration 5.
  • Open and close toilet lid
  • Start incineration on control panel
  • Wait 2-3 minutes for continuous incineration
  • Stop incineration by pressing incineration button until a long beep is heard (approx. 8 sec)
  • Close main gas supply valve from gas container

If you do not have the control panel in place yet, you can still test the toilet by connecting the control panel to the signal cable.

FINAL INSTALLATION

Adjust docking frame for equal clearance around outer shell. Some modiication might be necessary for perfect it. Please note: the docking frame is made for mounting behind the steel plate on the toilet.
This will give better clearance between outer shell and docking frame when operating the shell elevator. Operate the shell elevator to ensure that there is no contact during operation. When the toilet is tested, mount panels and close covers. Mount control panel if not mounted earlier.

DIMENSIONS

CUTOUT DIMENSION IN REAR WALL
The following dimensions act as a guideline for cut out in the interior wall of the room, behind where the Cinderella Travel will be positioned.

Cinderella Travel Incineration Toilet - Dimensions 1

DIMENSIONS FOR SHELL ELEVATOR

Cinderella Travel Incineration Toilet - Dimensions 2

FLOOR CONNECTION POINTS

Cinderella Travel Incineration Toilet - Dimensions 3

TECHNICAL INFORMATION

DIMENSIONS OF THE TOILET

Weight 20 kg
Height 540 mm
Seat height 490 mm
Width 390 mm
Depth 590 mm
Capacity 3-4 visits per hour
Max. depth operating shell elevator 613 mm + 100 mm Build-in Module
Max. height operating shell elevator 845 mm

TECHNICAL SPECIFICATIONS, ELECTRIC

Supply voltage 11-14.5 VDC
Red cable Positive
Supply fuse 10A
Peak load 4:00 AM
Power consumption (incineration) 1.3 A
Dimensional supply under 10 m 1.5 mm²
Dimensional supply 10 – 17 m 2.5 mm²

TECHNICAL SPECIFICATIONS

Inner diameter exhaust hose 60 mm
Insulation thickness 13 mm, approx. 102 mm diameter
Max temperature exhaust gases 118 ° C
Max temperature insulation exterior 55 ° C
Hole saw diameter for Roof feed-through flange 83 mm
Maximum length of exhaust hose 250 cm
Max temperature Build-in module 74 °C at 45 °C inlet temperature

TECHNICAL SPECIFICATIONS, GAS SUPPLY

Gas supply Ø 8 mm compression coupling
Gas supply connector material Brass
Gas type Propane or LPG
Gas pressure 30 mBar

TECHNICAL SPECIFICATIONS, AIR INLET

Diameter inlet air hose 75 mm
Maximum length inlet air hose 120 cm
Minimum air grating size 50 cm² light opening
Air consumption during incineration 52 m3/h

INCLUDED IN THE TOILET BOX

Cinderella Travel Incineration Toilet - Included in the toilet
box

INCLUDED IN THE INSTALLATION BOX

Cinderella Travel Incineration Toilet - Included in the installation
box

OPTIONAL, NOT INCLUDED

Document number: InD-000003
Revision number: 01
Travel | PM04CS08 |Cinderella Travel Installation Manual | 08.04.2021
Manufacturer:

When nature calls
Learn more about Cinderella
www.cinderellaeco.com

Cinderella Travel Incineration Toilet - Ending

Cinderella Eco Group
Sjøvikvegen 67, NO-6475 Midsund, Norway
www.cinderellaeco.com

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals