Cinderella Travel Incineration Toilets Instruction Manual
- June 13, 2024
- Cinderella
Table of Contents
CINDERELLA TRAVEL
Model Cinderella Travel
Cinderella Travel Installation Manual for Europe
Installation of Cinderella Travel (Serial number):
GENERAL INFORMATION
NOTICE!
It is important to read this guide from start to finish and consider all the
details of installing Cinderella Travel before you begin with the actual
documentation and installation.
Temperatures indicated in the instruction are the maximum temperature you may
expect with proper installation. Improper/faulty installations may result in
higher temperatures.
WARRANTY
The three (3) years warranty of the Cinderella Travel will be null and void if
found that an improper installation is carried out. Improper installation may
affect the following:
- Service intervals
- Incineration efficiency
- Lifetime of the toilet or parts
- Warranty
PLANNING THE INSTALLATION
Before you begin, you should prepare a plan to cover several important
elements. These elements include:
- Be sure to check that you have sufficient space surrounding the toilet for ease of use and access for service and maintenance
- Feeding and mounting the exhaust hose through the roof
- Feeding and mounting the inlet air hose through the floor
- Hatches for access to connections
- Power cable routing
- Gas supply routing
- Location of the control panel
INSTALLATION
SKETCH OF AN INSTALLATION
PLACING THE TOILET
The toilet has a Build-in module that must be built into the wall. You can
also create a box around the Build-in module. Clearance between Build-in
module and rear wall is recommended, approx. 5 mm.
Please note that recommended panel thickness is 8 mm, and a thicker panel will
reduce the space for insulation around the exhaust hose. Sufficient insulation
space must be maintained, in order to maintain the insulation properties.
If the floor is molded in a hard plastic material, preventing you from placing
the toilet where you would prefer it, the material may need to be removed, and
a new floor installed, unless it is possible to modify parts of the floor. You
should consider that the ash container insert regularly must be emptied. This
will require at least 40 cm space in front of the toilet. There must be at
least 5 cm clearance on each side of the toilet but keep user comfort in mind
and provide extra space if possible.
The toilet has four fixing points to the floor. Remove ash container for
access. If the bathroom has floor heating, take precautions when fixing the
toilet to the floor. We also recommend that you place bowl liners in near and
easy reach of the toilet for ease of use and to ensure correct use. Two
different bowl liner holders are available from reseller/producer.
EXHAUST AIR
Exhaust hose with insulation is fed from roof feed-though flange to the toilet
and secured at each end with a powerful hose clamp that is included in the
installation kit. Avoid horizontal stretches (max. 60 cm) and turns as far as
possible as this creates counter pressure and will cause increased stress on
the toilet over time and the possibility of overheating. Bends should be as
gentle as possible. Under no circumstances should negative fall or sharp 90°
bends occur as this will cause overheating of the product. The insulation must
not be squeezed as this affects the insulating and special care must be taken
for proper sealing in both ends. Exhaust hose should be mounted to toilet and
feed-through flange with sealant paste around the exhaust to avoid leakage.
On top of the roof feed-through flange, a chimney cap is mounted, this is
included in the toilet box.
If there are larger objects within one meter of chimney cap, or if there is
snow on the roof that can prevent air flow, an extension must be mounted
between the flange and the chimney cap.
The roof feed-through flange must be placed in a flat area of the roof, to
ensure proper sealing. Find a suitable place where the flange makes good
contact with the roof and make a hole in the roof with an 83 mm hole saw. Take
precautions when making the hole through the roof, to avoid electric cables.
Be sure to use enough sealant between the flange and roof to ensure no water
ingress. Roof feed- through is in material quality EN 1.4016. Take necessary
precautions to avoid galvanic corrosions.
Fasten roof feed-through flange with appropriate stainless-steel screws.
INLET AIR
An inlet air hose is included in the installation box. Use an 83 mm hole saw
for implementation in flooring.
An optional floor nozzle is available for double floors.
Consider air supply into double floor compartment for sufficient air flow.
When installing inlet air with the hose, fasten the metal air inlet cassette
delivered with the appliance to the bottom of the build in module and fasten
the hose to this cassette.
If the wheel arch or other obstructions prevent the hose from going directly
down, it can be bypassed, but make sure the hose is routed with gentle bends
and as short a stretch as possible, maximum hose length 120 cm. Finish with
floor nozzle under floor exterior. The hose may be insulated, if desired.
An air grate can be used in both floor and wall, but make sure you have a
minimum 50 cm² light opening and that you protect against water intrusion.
Please note that floor intake is preferred instead of wall intake. If the
toilet in large parts of the year is used in cool climates that experience
extreme cold for extended periods, condensation may form on the outside of the
toilet. It may be advantageous to preheat the air in. This can be done using a
radiator connected to the heating systemthat preheats the air.
GAS INSTALLATION
NOTICE!
Please note that a sticker is delivered with the toilet for marking of the gas shut-off valve and this sticker is mandatory in some countries.
Please be aware that regulations regarding gas installations in vehicles vary
from country to country. The installation may require certified personnel in
order to be approved. Be sure to research the local regulations where you live
and adhere to these before installation.
The gas is supplied through an 8 mm pipe directly to the toilet with an angled
compression fitting on top of the Build-in module. No adjustment of fitting is
allowed. The toilet is designed to run on propane.
If you know that you frequent areas with low quality propane, a filter should
be considered. A separate gas shut-off valve is required when connecting to an
existing gas supply line.
This will aid trouble shooting and allow operation of other appliances in case
the toilet is dismounted.
The connector is a brass compression coupling which takes ø8 pipe. Be sure to
clamp the pipe close to the fitting to avoid stress fatigue in the pipe.
INSPECTION HATCH
There must be access to the top of the Build-in module for easy access to
connections. This allows for annual inspection and leak testing of the gas
connection.
CONTROL PANEL
Locate the desired placement of the control panel.
Create an opening for the signal cable and route the cable out here. The
signal cable is a flat cable with approx. 20 mm width. Connect the signal
cable together with the control cable and fasten the control panel. The signal
cable can be connected in two ways, but only one way is correct. If you get a
red light, and not a green, reconnect signal cable the opposite way. The
signal cable is approx. 150 cm long.
CONNECTING AND TEST OF TOILET
Testing procedure after installation and before adding panels and closing hatches
- Open main gas supply valve from gas container
- Check for gas leakages on supply line
- Turn on main switch located inside toilet, see illustration 5.
- Open and close toilet lid
- Start incineration on control panel
- Wait 2-3 minutes for continuous incineration
- Stop incineration by pressing incineration button until a long beep is heard (approx. 8 sec)
- Close main gas supply valve from gas container If you do not have the control panel in place yet, you can still test the toilet by connecting the control panel to the signal cable.
FINAL INSTALLATION
Adjust docking frame for equal clearance around outer shell. Some modification
might be necessary for perfect fit. Please note: the docking frame is made for
mounting behind the steel plate on the toilet.
This will give better clearance between outer shell and docking frame when
operating the shell elevator. Operate the shell elevator to ensure that there
is no contact during operation. When the toilet is tested, mount panels and
close covers. Mount control panel if not mounted earlier.
DIMENSIONS
CUTOUT DIMENSION IN REAR WALL
The following dimensions act as a guideline for cut out in the interior wall
of the room, behind where the Cinderella Travel will be positioned.
DIMENSIONS FOR SHELL ELEVATOR
FLOOR CONNECTION POINTS
TECHNICAL INFORMATION
DIMENSIONS OF THE TOILET
Weight| 20 kg
Height| 540 mm
Seat height| 490 mm
Width| 390 mm
Depth| 590 mm
Capacity| 3-4 visits per hour
Max. depth operating shell elevator| 613 mm + 100 mm Build-in Module
Max. height operating shell elevator| 845 mm
TECHNICAL SPECIFICATIONS, ELECTRIC
Supply voltage| 11-14.5 VDC
Red cable| Positive
Supply fuse| 10A
Peak load| 4:00 AM
Power consumption (incineration)| 1.3 A
Dimensional supply under 10 m| 1.5 mm²
Dimensional supply 10 – 17 m| 2.5 mm²
TECHNICAL SPECIFICATIONS
Inner diameter exhaust hose| 60 mm
Insulation thickness| 13 mm, approx. 102 mm diameter
Max temperature exhaust gases| 118 ° C
Max temperature insulation exterior| 55 ° C
Hole saw diameter for Roof feed-through flange 83 mm| 83 mm
Maximum length of exhaust hose| 250 cm
Max temperature Build-in module| 74 °C at 45 °C inlet temperature
TECHNICAL SPECIFICATIONS, GAS SUPPLY
Gas supply| Ø 8 mm compression coupling
Gas supply connector material| Brass
Gas type| Propane or LPG
Gas pressure| 30 mBar
TECHNICAL SPECIFICATIONS, AIR INLET
Diameter inlet air hose| 75 mm
Maximum length inlet air hose| 120 cm
Minimum air grating size| 50 cm² light opening
Air consumption during incineration| 52 m3 /h
INCLUDED IN THE TOILET BOX
INCLUDED IN THE INSTALLATION BOX
OPTIONAL, NOT INCLUDED
Cinderella Eco Group
Sjøvikvegen 67, NO-6475 Midsund, Norway
www.cinderellaeco.com
Document number: InD-000003
Revision number: 02
Travel | PM04CS08EU |Cinderella Travel Installation Manual for Europe |
01.03.2023
When nature calls
Learn more about Cinderella
www.cinderellaeco.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>