KIT BUILDINGS SYSTEMS C2020 Container Shelter Instruction Manual

May 15, 2024
KIT BUILDINGS SYSTEMS

Front wall for C2020/C2040
Front wall with winch door
Assemble on Standard or High Cube Container

KIT BUILDINGS SYSTEMS C2020 Container Shelter

Parts List

Code Description Q t y
1 Base plate for mechanical door 2
2 Base for standing leg 2
3 Added lower door track to suit for HQ container 2
3L Left lower door track 1
3R Right lower door track 1
4L Left upper door track 1
4R Right upper door track 1
5 Added standing leg to suit for HQ container 2
5R Right side lower standing leg 1
5L Left side lower standing leg 1
6 Upper standing leg 2
7 Horizontal tube 2
8 Mechanical door beam 1
8A Mechanical door beam shrinkage 1
9 Suspender tube 1
10 Square tube for mechanical wheel 1
11 Mechanical wheel 1
12 Bottom tension tube 2
13 Splint 8
14 Mechanical door pipe 7 groups
15 Front wall cover 1
16 Rope 1 bundle
17 Bolts 10*30 2
18 Bolts 10*90 46
19 Clip/iron 5
20 Carriage screw 10*80 4
21 Ground nail 8
22 Carriage screw 8*80 14

A—Front wall assembly

KIT BUILDINGS SYSTEMS C2020 Container Shelter - Front wall
assembly

As Above Figures shows, find out all spare parts for the front wall.

KIT BUILDINGS SYSTEMS C2020 Container Shelter - front
wall

Make sure the pacing, and then use screws to connect those spare parts together.

KIT BUILDINGS SYSTEMS C2020 Container Shelter - spare parts
together

After assembly the front wall, find out the front cover, use ropes to tie the front cover to the front wall.There are some dropping tubes(No.14) need to be insert into the door cover, use steel wire to insert into all these dropping tubes one by one, and go through  the pully from top to bottom & from bottom to top. Tie the end of the steel wire to the winch wheel. Thus when you move the winch wheel, the door could be go up and down.

SHELTER
ASSEMBLYMANUAL
Container Shelter
Model #C2020/W6mx L6mx H2m
Model#C2040/W6mxL12mxH2m

KIT BUILDINGS SYSTEMS C2020 Container Shelter -
SHELTER

Parts List

Part Code Description C2020 Qty C2040 Qty
L1 Female square tube base plate used for corner (with screw) 2 2
L2 Male square tube base plate used for corner (with screw) 2 2
R1 Square tube at middle (with screw) 4 12
1 Three way fitting 2 2
2 Four way fitting 3 7
3 Top bent tube 10 18
4 Sidewall bent tube 10 18
5 Top roof purlin 4 8
6 Connection purlin 16 32
7 Lower tension tube for roof cover 2groups 2groups
7A Tie down ratchet 10 18
7B Band for Tie down ratchet 10 18
8 Angle iron 4 4
9 Roof cover 1 1
10 Round plastic cap used for lower tensioning tube ( No. 7 ) 4 4
11 Ropes 1 dozen 1 dozen
12 Plastic Plug 30*50 mm used for square tube ( No. L1 & L2 ) 4 4
13 Bolt M8x70mm 90 162
14 Butterfly bolt 8 16
15 Connector used for fixing square tubes
(with screw and clip) 6 10
16 Bolt 10*60mm used for fixing square tube 6 14

SPECIFICATION

Width: 6m
Height: 2m
Length: 6m/12m

IMPORTANT—–READ MANUAL FIRST

Improper site preparation, Assembly and Maintenance may invalidate warranty and cause unnecessary and costly mistake. If you have any questions contact your local dealer.
For User Friendly assembly we have identified each individual component with the part code as indicated in the parts list. Please refer to the part code numbers and drawing to ensure problem free assembly.
It’s necessary to tighten the roof fabric enough to avoid “hammocks” on the roof and also re-tighten once or twice again after a few months of use. This is important when assembly in cold weather (autumn and winter) because the fabric is stiff then and when we  got the sun and warm weather afterwards it will make the fabric “slack” again and need to be re-tighten before next winter.
It’s the owners responsibility to take of snow immediately if not slide off by itself.

READ ALL INSTRUCTIONS BEFORE ASSEMBLY

  1. Keep work area clean. Cluttered areas invite injuries. Do not set up near snow drifts, in slippery places, in high winds, or wet location.
  2. Keep children away. All children should be kept away from the work area.
  3. Don’t over reach. Keep proper footing and balance at all times.
  4. Do not assemble in under the influence of alcohol or drugs. Read warning labels on prescriptions to determine if your judgment or reflexes are impaired while taking drugs. If there is any doubt, do not assemble.
  5. Be aware of possible windy conditions; fasten the bases in concrete if these conditions are likely to occur. Remove the cover during hurricane.
  6. Be careful with power and heat sources. Do not keep heat sources near the tarpaulin. Do not expose to open flame.
  7. Be aware of personal safety during assembly and use. Be careful not to pinch fingers with clips and tubes when assembling: when using makes sure there is adequate ventilation for exhaust and other dangerous fumes.

A –EQUIPMENT AND TOOLS FOR INSTALLATION

  1. Measuring tape
  2. String for alignment
  3. Step ladder
  4. Sledge hammer
  5. Wrench
  6. Scissors

INSTALLATION PROCESS

A—BASE INSTALLATION
Please refer to the diagram (Figure 1) to place the base plates.

KIT BUILDINGS SYSTEMS C2020 Container Shelter - BASE
INSTALLATION

KIT BUILDINGS SYSTEMS C2020 Container Shelter - BASE INSTALLATION
2

  1. The measure is from center to center of the tubes. Referring to the above diagram and confirm the place of the base plates. ENSURE THAT THE FOUNDATIONS IS SQUARE.

  2. Fix the base plate (No. L1/ L2 / R1) and Connecting pieces (No.15) by bolt (No. 16) according to Figure 1.
    Note: The connector (NO.15) please refer to NO.A & NO.B ,the Base plate for inner arch frame please refer to NO.C & NO.D, the Base plate for corners please refer to NO.E & NO.F as below:
    KIT BUILDINGS SYSTEMS C2020 Container Shelter - Base
plate

  3. Insert the Plastic Plug 30*50 mm (No. 12) into the ends of square tube. ( No. L1 & L2 )

B–FRAME INSTALLATION

KIT BUILDINGS SYSTEMS C2020 Container Shelter - FRAME
INSTALLATION

  1. As Figure 2 shown find one piece of Three-way fitting (No. 1), two pieces of Top bent tube (No. 3) and two pieces of Sidewall bent tubes (No. 4). To connect them by Screw M8x70mm ( No. 13 ) .Which makes one group of arch. Please NOTE the direction  of the screw. DO NOT install the screws on the top of the truss where the fabric will rest.
  2. Life an assembled arch into one base plate and force the other end of the arch into the opposite base plate.
  3. When finishing the installation of first two arches, connect the Connection purlin between two arches by using screw M8x70(No. 13. There is 4 pieces of Connection purlins (part code 6)and 1 piece of Top roof purlin (part code 5) between each arch.
    Then install the third arch into base plate and connect the purlin. By turns the assembly for the frame is finished.

C–INSTRUCTION FOR COVERATTACHED

KIT BUILDINGS SYSTEMS C2020 Container Shelter - INSTRUCTION FOR
COVERATTACHED

KIT BUILDINGS SYSTEMS C2020 Container Shelter - INSTRUCTION FOR
COVERATTACHED 2

KIT BUILDINGS SYSTEMS C2020 Container Shelter - INSTRUCTION FOR
COVERATTACHED 3

KIT BUILDINGS SYSTEMS C2020 Container Shelter - INSTRUCTION FOR
COVERATTACHED 4

Install the Roof Cover
NOTE: DO NOT install the cover onto the frame of your building in high wind conditions. A slight breeze is the most advantageous for cover installation. To take advantage of the breeze, pull the cover up over the arches with the breeze blowing in the cover like a  sail filled with air.

  1. Put the Roof cover (No. 9) EVENLY, CARFULLY AND SLOWLY on the frame. Adjust the cover so that it is square and evenly centered on the frame.
  2. Weld the Angle seats (No. 8) on each container and use Rope (No. 11) to knit the cover on the two side arches, finally tie the Roof cover to the Angle seats.
  3. Cut pockets according to the position of the base plates and put the Lower Tension tubes for roof cover (No. 7) into the pocket of roof cover. Then use the Rope (No. 11) to tie down the Lower tension tubes like the Figure
  4. Finally install the Plastic plug for base rail section (part code 10) into two end of the Lower tension tubes.
    NOTE: DO NOT LEAVE THE ROOF COVER UNATTACHED UNDER ANY CIRCUMSTANCES until the final assembly and tightening has been completed.
    The process is quite easy. But some tightening adjustments will be necessary to produce a flat, tensioned roof cover. Please adjust the roof cover every month.
    Please Note:
    KIT BUILDINGS SYSTEMS C2020 Container Shelter - the tape
wrapped
    Please use the tape wrapped around the gap between the steel skeleton after installing.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)