Panduit VS-CKP4-000 Veri Safe Insulation Piercing Connection Kit Instruction Manual
- June 17, 2024
- PANDUIT
Table of Contents
VeriSafe Insulation-Piercing
Connection Kits
Insulation-Piercing Connectors for
VeriSafe AVT Sensor Lead Tapping on Copper Conductors
T-PMPI-322EN
Rev. 03 [12-2019]
INSTALLATION INSTRUCTIONS
Models: VS-CKP14-6, VS-CKP4-000
VS-CKP4-000 Veri Safe Insulation Piercing Connection Kit
© Panduit Corp. 2019
Connection Kit Contents: contains connectors and ferrules for
installation of VeriSafe AVT
Panduit VSC Series Insulation-Piercing Connectors
CONNECTION KIT CATALOG PART NUMBER| “RUN” Wire (CODE WIRE)| “TAP” Wire AWG
(Terminated w/ Ferrule)| CONNECTOR| FERRULE
---|---|---|---|---
MIN. AWG
[METRIC, mm2]| MAX. AWG
[METRIC, mm2]| Catalog P/N| Quantity| Catalog P/N| Quantity
VS-CKP14-6| 14 AWG [2.1, r]| 6 AWG [13.3, r]| 14 AWG STR
Class K (Terminated w/ Ferrule)| VSC6| 3| F80-12| 12
VS-CKP4-000| 4 AWG [21.2, r]| 3/0 AWG STR [85, r]| VSC3/0| 3| F80-12| 12
IMPORTANT:
- Must install Ferrules on Tap Wires before terminating Tap Wires into Panduit VSC Connector.
- Terminate Tap Wires into Panduit VSC Connector before installing Connector on a Phase Wire.
- Read Page 2; contains Safety Information and operating limits for Connector per product listing.
TO REDUCE THE RISK OF INJURY, USER MUST READ INSTALLATION INSTRUCTIONS BEFORE ATTEMPTING TO INSTALL
NOTE: In the interest of higher quality and value, Panduit products are
continually being improved and updated. Consequently, pictures may vary from
the enclosed product.
NOTE: Updates to this Installation Instructions may be available. Check
www.panduit.com for the latest version of this
manual.
Email: techsupport@panduit.com
EU Website: www.panduit.com/emea
EU Email:
emeatoolservicecenter@panduit.com
Safety Information
This installation instructions contains information and warnings which must be followed to ensure safe termination and operation of the Insulation-piercing Connectors and an AVT Device.
- Always de-energize panel and verify absence of voltage in the panel before attempting to install connector. Do not install connector on an energized conductor.
- Installer must also follow all AVT safety, installation, commissioning and operating steps from the AVT Device Manual.
- Connector is intended for one-time installation and use. Do not reuse nor re-install connector.
Connector Ratings Information
- Panduit VSC Series Insulation-Piercing Connectors are intended for simplifying installation and connection of PANDUIT VeriSafe AVT Absence of Voltage Testers to phase (run) conductors.
- Panduit VSC Series Insulation-Piercing Connectors must be used within the rated operating environment and installed according to the Listed product ratings in this Table
Panduit CATALOG P/N (VSC Connector) | VSC6 | VSC3/0 |
---|---|---|
MAX. Operating Temperature (°C) | 90°C | |
MAX. Operating Voltage (Volts) | 600V | |
RUN WIRE | Torque-driver SAE Hex Size (Main Fastener) | 5/16” |
Installation Torque (Required) | 40 in-lb | |
[4.52 N⋅m] | 80 in-lb |
[9.04 N⋅m]
Minimum Rated Wire Size, AWG [Metric, mm2, rigid]| 14 SOL
14 STR
[2.1, r]| 4 SOL
4 STR
[21.2, r]
Maximum Rated Wire Size, AWG [Metric, mm2, rigid]| 6 SOL
6 STR
[13.3, r]| 3/0 STR [85, r]
TAP WIRE| Torque-driver Installation Bit Size| T10 Torx
Torque-driver Installation Tool (recommended)| Wiha P/N 28502
Installation Torque (Required)| 7 in-lb [0.79 N⋅m]
Listed
Tap Wire and Ferrule Combinations
[Tap Wire Size/Type and Panduit Ferrule P/N]| #1| TAP Wire| 14 AWG STR Class K
F80-12 ferrule
Ferrule
2
| TAP Wire| 16 AWG STR Class K
F78-12 ferrule
Ferrule
3
| TAP Wire| 18 AWG STR Class K
F76-12 ferrule
Ferrule
Recommended Crimp Tool (Panduit P/N)| CT-1160
Overview of Installation Process (Connector)
Before proceeding, refer to the simplified flow-chart below, which indicates
the steps taken for each connector during installation. Understand these steps
before proceeding further with illustrated details.
Step-by-Step Installation Procedure
Step-by-step illustrated instructions for installation are as follows;
STEPS 1 thru 3: Prepare Sensor Leads (see FIGURE 1)
- Prepare (strip) AVT device sensor leads.
- Crimp ferrules onto sensor leads.
- Make locating mark on sensor leads.
*STEP 4: Review Connector Features (see FIGURE 2 and FIGURE 2)
STEP 5: Loosen factory-tightened MAIN FASTENER (see FIGURE 2)**
TERMINAL SCREWS ARE ACCESSIBLE FROM THE TWO PORTS. TERMINAL SCREWS ADJUST THE
CONNECTOR TERMINALS. CONNECTOR TERMINALS ARE USED TO TERMINATE TAP WIRES (AVT
SENSOR LEADS) IN CONNECTOR
TAP WIRE INSERTION PORTS ARE FOR INSERTING A PAIR OF COLOR-CODED, CRIMPED AND
FULLY-INSERTED TAP WIRES (AVT SENSOR LEADS) INTO THE CONNECTOR TERMINALS
*Note: Connector may feature integrated Wire Management Protrusions for
optional use.
After Tap Wires are terminated into Connector, (after Installation Step 11)
the Protrusions can be used to restrain Tap Wires near Connector using cable
ties or other acceptable methods.
STEP 6(a): Review Connector Features (see FIGURES 3 and 4)
STEP 6(b): Remove TAP TORQUE Reminder Label (see FIGURES 3 and 4)
Inspect location of factory-tightened TERMINAL in each TAP WIRE port in
connector.
- Each TERMINAL SCREW and TERMINAL was shipped in a factory-tightened state.
- In a factory-tightened state, the TERMINAL blocks access to and restricts insertion of TAP WIRE.
- Installer must loosen TERMINAL SCREW and push down to ensure TERMINAL position permits insertion of TAP WIRE.
- REMOVE TAP TORQUE reminder label before proceeding to STEP 7.
STEP 7: Loosen TERMINAL SCREWS and push TERMINAL into proper position (See
FIGURE 5)
STEP 8: Verify TERMINALS are in proper position and TAP WIRE can be fully-
inserted (FIGURE 6)
- Loosen TERMINAL SCREW two turns and push down on SCREW to move TERMINAL.
- Verify position of TERMINAL and repeat loosening two turns and repeat push down on the SCREW.
- Repeat until TERMINAL is in the position shown in FIGURE 6. DO NOT completely loosen screw.
- Verify that TERMINAL is positioned at the bottom of port, permitting full-insertion of TAP WIRE.
- TERMINAL must be positioned at bottom of port, permitting full-insertion of TAP WIRE (see FIGURE 6)
STEPS 9 – 11: Insert Crimped Wires into TERMINALS and Tighten TERMINAL
SCREWS (FIGURE 7)
STEPS 12 – 13: Position Connector onto RUN WIRE and Tighten MAIN FASTENER
(FIGURE 8)
9. Insert a crimped, color-coded pair of AVT sensor leads into TAP WIRE
terminals.
10. Verify fully-inserted AVT sensor leads by verifyingthat “location mark”
(STEP 3) is flush with the connector body at wire insertion port.
11. Use torque-driver (T10 Torx drive) to tighten terminal screws to the
specified TORQUE.
12. Properly position connector onto phase conductor (RUN WIRE). Keep RUN
WIRE centered with circular recess during next step.
13. Use SAE Hex torque-driver to tighten MAIN FASTENER until the specified
TORQUE value is achieved and maintained for 5 seconds.
DOC#: T-PMPI-322EN
www.panduit.com
Panduit Corp.
USA Technical Support
Tel: 800-777-3300
Panduit Europe • EMEA Service Center
Tel: +31 546 580 452 • Fax: +31 546 580 441
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>