The following installation procedures are guidelines for the installation of the Power and End Termination Kit. For translations other than English and local language translation provided here, please contact Thermon. The English language installation procedure shall govern.
Receiving, Storing and Handling
- Inspect materials for damage incurred during shipping.
- Report damages to the carrier for settlement.
- Identify parts against the packing list to ensure the proper type and quantity has been received.
- Store in a dry location.
PETK Power and End Termination Kits (per cable)
PETK-1 | for BSX, VSX-HT, RSX |
---|---|
PETK-2 | for HTSX, KSX, KSR, USX |
PETK-3 | for HPT, FP |
PETK-3-ECM | for HPT, FP |
PETK-3-ZT | for HPT, FP |
PETK-8 | for DSX |
Kit Contents
Item | Qty. | Description |
---|---|---|
1 | 1 | RTV Tube |
2 | 1 | Power Connection Boot |
3 | 1 | End Cap |
4 | 1 | Tape Strip (PETK-3 Only) |
5 | 1 | End Termination Caution Label |
6 | 1 | Grommet (For PETK-3 Terminator kits only) |
7 | 1 | Ground Sleeve |
Note:
Wire pins may be required as per client/project specification (order
separately).
Warnings
- Due to the risk of electrical shock, arcing and fire caused by product damage or improper usage, installation or maintenance, a ground-fault protection device is required.
- Installation must comply with Thermon requirements (including form PN 50207U for Ex systems) and be installed in accordance with the regulations as per the norm EN IEC 60079-14 for hazardous areas (where applicable), or any other applicable national and local codes.
- Component approvals and performance ratings are based on the use of Thermon specified parts only.
- De-energize all power sources before opening enclosure.
- Keep ends of heating cable and kit components dry before and during installation.
- Minimum bending radius of heating cable is 32 mm (except HPT is 57 mm and FP is 19 mm).
- Individuals installing these products are responsible for complying with all applicable safety and health guidelines. Proper Personal Protective Equipment (PPE) should be utilized during installation. Contact Thermon if you have any additional questions.
- Avoid electrostatic charge. Clean only with a damp cloth.
Tools Required
PETK Certifications/Approvals 1
Note:
- Certifications vary by cable type. See heating cable installation procedures for additional information.
INSTALLATION PROCEDURES
IMPORTANT!
Heating cable must be properly installed within expediter assembly and mounted
to pipe prior to terminating with PETK kit.
See Terminator Installation Instructions for expediter mounting details.
Terminator: Route cable through base entry and mount expediter to pipe using
pipe band. Do not band over cable.
For HPT and FP cable exchange grommet supplied in Terminator kit with:
GRW-G provided in PETK-3
GRW-GT2 provided in PETK-3-ECM
GRW-G/Tstat provided in PETK-3-ZT
Step 1: Remove Heating Cable Over jacket and Separate Metallic Braid to Form Pigtail
-
a. Cut and remove heating cable over jacket
Do not cut metallic braid.
1b. Separate braid strands at edge of over jacket and pull cable through opening in braid.
1c. Twist braid into a pigtail. Trim ends of braid.
Step 2: Matrix Removal for DSX, BSX, VSX-HT, HTSX, RSX, KSX, KSR, USX Cables -
a. Cut and remove primary insulation jacket (BSX and RSX cables only).
2b. Cut a 4 mm strip of conductive matrix between the conductors.
Do not cut bus wire strands.
2c. Cut and remove the 4 mm matrix strip.
Step 2: Heating Element Removal for HPT and FP Cables
2a. Cut and remove primary insulation jacket.
NOTE: Bus connection must be no more than 50 mm (2”) from pipe as addressed in connection kit instructions.
2b. Cut and remove fiberglass overlay and heating element. Push any remaining heating element wire under the primary insulation jacket.
2c. Cut and remove pairing jacket.
Do not cut bus wire insulation.
Step 3: Install Power Boot on Heating Cables -
a. Apply RTV sealant to cable to cover distance of at least 3 mm and slide boot onto the end of the cable.
3b. Slide boot onto the end of the cable and green ground sleeve over twisted braid. Expose 13 mm (0.5”) of bus wire.
3c. Crimp conductor wire pins on each conductor and on twisted braid if required as per client/project specification (order separately).
Step 4: End Termination for DSX, BSX, VSX-HT HTSX, RSX, KSX, KSR, USX Cables -
a. Cut and remove heating cable over jacket.
4b. Trim away exposed braid from cable.
4c. Fill the end cap with RTV sealant and apply a circumferential bead to cable [minimum of 3 mm (0.12”) wide]. Slide end cap onto end of cable
Step 4: End Termination for HPT and FP
4a. Trim the cable 75 mm (3”) from the bus connection.
4b. Cut and remove overjacket and trim away exposed braid from cable.
4c. Cut and remove primary insulation jacket.
4d. Cut and remove fiberglass overlay and heating element. Push any remaining heating element wire under the primary insulation jacket.
4e. Cut and remove pairing jacket. Stagger cut one of the bus wires.
Do not cut bus wire strands.
4f. Tape bus wires individually and then together. Continue taping to
cover over jacket. Fill the end cap with RTV sealant and apply a
circumferential bead to cable [minimum of 3 mm (0.12”) wide]. Slide end cap
onto end of cable.
PETK
Cable Take-off for DSX, BSX, RSX, HTSX, KSX, KSR, USX and VSX-HT
For Power Connection Boot Termination
For End Cap Termination
NOTE: Images may not be printed to scale.
Cable Take-off for HPT and FP Heating Cables
For Power Connection Boot Termination
For End Cap Termination
NOTE: Images may not be printed to scale.
CUSTOMERS SUPPORT
European Headquarters: Boezemweg 25
PO Box 205
2640 AE Pijnacker
The Netherlands
Phone: +31 (0) 15-36 15 370
Corporate Headquarters: 100 Thermon Dr
PO Box 609 San Marcos, TX 78667-0609
Phone: 512-396-5801
1-800-820-4328
For the Thermon office nearest you visit us at . . .
www.thermon.com
© Thermon, Inc.
Printed in U.S.A.
Information subject to change.