INSTALLATION PROCEDURES
The following installation procedures are guidelines for the installation of
the Power and End
Termination Kit. For translations other than English and local language
translation provided here, please contact Thermion. The English language
installation procedure shall govern.
Receiving, Storing and Handling
- Inspect materials for damage incurred during shipping.
- Report damages to the carrier for settlement.
- Identify parts against the packing list to ensure the proper type and quantity has been received.
- Store in a dry location.
PETK Power and End Termination Kits (per cable)
- PETK-1 for BSX, VSX-HT, RSX
- PETK-2 for HTSX, KSX, KSR, USX
- PETK-3 for HPT, FP
- PETK-3-ECM for HPT, FP
- PETK-3-ZT for HPT, FP
Kit Contents
Item| Qty.|
Description
---|---|---
1
|
1
| RTV Tube
2
|
1
| Power Connection Boot
3
|
1
| End Cap
4
|
1
| Tape Strip (PETK-3 Only)
5
|
1
| End Termination Caution Label
6
|
1
| Grommet (For PETK-3 Terminator kits only)
7
|
1
| Ground Sleeve
Note:
Wire pins may be required as per client/project specification (order
separately).
Warnings
- Due to the risk of electrical shock, arcing and fire caused by product damage or improper usage, installation or maintenance, a ground-fault protection device is required.
- Installation must comply with Thermon requirements (including form PN 50207U for Ex systems) and be installed in accordance with the regulations as per the norm EN IEC 60079-14 for hazardous areas (where applicable), or any other applicable national and local codes.
- Component approvals and performance ratings are based on the use of Thermon specified parts only.
- De-energize all power sources before opening enclosure.
- Keep ends of heating cable and kit components dry before and during installation.
- Minimum bending radius of heating cable is 32 mm (except HPT is 57 mm and FP is 19 mm).
- Individuals installing these products are responsible for complying with all applicable safety and health guidelines. Proper Personal Protective Equipment (PPE) should be utilized during installation. Contact Thermon if you have any additional questions.
- Avoid electrostatic charge. Clean only with a damp cloth.
Tools Required
PETK Certifications/Approvals1
Note:
- Certifications vary by cable type. See heating cable installation procedures for additional information
IMPORTANT!
Heating cable must be properly installed within expediter assembly and mounted
to pipe prior to terminating with PETK kit.
See Terminator Installation Instructions for expediter mounting details.
Terminator: Route cable through base entry and mount expediter to pipe using pipe band. Do not band over cable.
For HPT and FP cable exchange grommet supplied in Terminator kit with:
GRW-G provided in PETK-3
GRW-GT2 provided in PETK-3-ECM
GRW-G/Tstat provided in PETK-3-ZT
Step 1: Remove Heating Cable Over jacket and Separate Metallic Braid to
Form Pigtail
a. Cut and remove heating cable over jacket.
Do not cut metallic braid.
1b. Separate braid strands at edge of over jacket and pull cable through opening in braid.
1c. Twist braid into a pigtail. Trim ends of braid.
Step 2: Matrix Removal for BSX, VSX-HT, HTSX, RSX, KSX, KSR, USX Cables
2a. Cut and remove primary insulation jacket (BSX and RSX cables only).
2b. Cut a 4 mm strip of conductive matrix between the conductors.
Do not cut bus wire strands.
2c. Cut and remove the 4 mm matrix strip.
Step 2: Heating Element Removal for HPT and FP Cables
2a. Cut and remove primary insulation jacket.
NOTE: Bus connection must be no more than 50 mm (2”) from pipe as
addressed in connection kit instructions.
2b. Cut and remove fiberglass overlay and heating element. Push any
remaining heating element wire under the primary insulation jacket.
2c. Cut and remove pairing jacket.
Do not cut bus wire insulation.
Step 3: Install Power Boot on Heating Cables
3a. Apply RTV sealant to cable to cover distance of at least 3 mm and slide boot onto the end of the cable.
3b. Slide boot onto the end of the cable and green ground sleeve over twisted braid. Expose 13 mm (0.5”) of bus wire
3c. Crimp conductor wire pins on each conductor and on twisted braid if required as per client/project specification (order separately).
Step 4: End Termination for BSX, VSX-HT HTSX, RSX, KSX, KSR, USX Cables
4a. Cut and remove heating cable over jacket.
4b. Trim away exposed braid from cable.
4c. Fill the end cap with RTV sealant and apply a circumferential bead to
cable [minimum of 3 mm (0.12”) wide]. Slide end cap onto end of cable.
Step 4: End Termination for HPT and FP
4a. Trim the cable 75 mm (3”) from the bus connection.
4b. Cut and remove overjacket and trim away exposed braid from cable.
4c. Cut and remove primary insulation jacket.
4d. Cut and remove fiberglass overlay and heating element. Push any
remaining heating element wire under the primary insulation jacket.
4e. Cut and remove pairing jacket. Stagger cut one of the bus wires.
Do not cut bus wire strands.
4f. Tape bus wires individually and then together. Continue taping to
cover overjacket. Fill the end cap with RTV sealant and apply a
circumferential bead to cable [minimum of 3 mm (0.12”) wide]. Slide end cap
onto end of cable.
Cable Take-off for BSX, RSX, HTSX, KSX, KSR, USX and VSX-HT
European Headquarters: Boezemweg 25 • PO Box 205 • 2640 AE Pijnacker • The
Netherlands • Phone: +31 (0) 15-36 15 370
Corporate Headquarters: 100 Thermon Dr • PO Box 609 San Marcos, TX
78667-0609 • Phone:512-396-5801 •
1-800-820-4328
For the Thermon office nearest you visit us at . .
.www.thermon.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>