THERMON Terminator ZP Power Connection Kit Instruction Manual
- June 9, 2024
- THERMON
Table of Contents
- Receiving, Storing And Handling
- Kit Contents
- Order Separately
- Dimensions
- Installation Precautions
- Tools Required
- Certifications/Approvals
- Installation Instructions
- Two Cable Layout Tips
- Three Cable Layout Tips
- Typical Wiring Details
- Support
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
THERMON Terminator ZP Power Connection Kit Instruction Manual
Receiving, Storing And Handling
- Inspect materials for damage incurred during shipping.
- Report damages to the carrier for settlement.
- Identify parts against the packing list to ensure the proper type and quantity has been received.
- Store in a dry location.
Kit Contents
Item | Quantity | Description |
---|---|---|
1 | 1 | Expediter Assembly |
Support Cap with O-RingThreaded Grommet Compressor Grommet
Support Base with O-Ring
2| 1| Junction Box Lid
3| 1| Junction Box Base with O-Ring
4| 1| Nut
5| 1| Banding
6| 1| Banding Guide
7| 1| Terminal Blocks with DIN Rail
(Refer to terminal specifications for maximum allowable wire size)
8| 1| Junction Box Cord
Order Separately
PETK Power and End Termination Kits (per cable)
Item | Quantity | Description |
---|---|---|
1 | 1 | RTV Tube |
2 | 1 | Power Connection Boot |
3 | 1 | End Cap |
4 | 1 | Tape Strip 6″ (PETK-3 only) |
5 | 1 | End Termination Caution Label |
6 | 1 | GRW-G Grommet (PETK-3 only) |
7 | 1 | Ground Sleeve |
Dimensions
Installation Precautions
- To minimize the potential for arcing and fire caused by product damage or improper installation use ground-fault protection. The National Electrical Code (NEC) and Canadian Electrical Code (CEC) require ground-fault protection of equipment for each branch circuit supplying electric heat tracing.
- Installation must comply with Thermon requirements and be installed in accordance with the NEC, CEC, or any other applicable national and local codes.
- Component approvals and performance ratings are based on the use of Thermon specified parts only. User supplied power connection fittings must be listed or certified for intended use.
- Avoid electrostatic charge. Clean only with a damp cloth.
- De-energize all power sources before opening enclosure.
- Keep ends of heating cable and kit components dry before and during installation.
- Individuals installing these products are responsible for complying with all applicable safety and health guidelines. Proper personal protective equipment, or PPE, should be utilized during installation. Contact Thermon if you have any additional questions.
Tools Required
Certifications/Approvals
P66/Type 4X -60°C ≤ Ta ≤ +55°C
Ordinary & Hazardous Locations
Class I, Division 2, Groups A, B, C, & D
Class II, Division 2, Groups F & G, Class III
Class I, Zone 1, AEx eb IIC T4-T6
Installation Instructions
-
Locate bus connection (HPT and FP only) and cable as shown. Cut end of cable at angle to aid in piercing grommet. Leave additional cable for expansion loop. See page 5 for multiple cable installation tips
-
Insert cable into expediter. If mounted on bottom or side of pipe, punch out weep hole Note: For HPT and FP cable, exchange grommet in Terminator with GRW-G provided in PETK-3.
-
Slide expediter toward pipe and route cable through support base entry.
-
Insert banding guide into expediter and snap into place.
-
Mount expediter to pipe using pipe band. Do not band over cable.
-
Cut off end of cable
-
Terminate cable with appropriate PETK termination kit. Refer to PETK installation instructions.
-
Push excess cable back through expediter. Tighten cap securely. Tape cable expansion loop to pipe.
-
For power connection applications: Use dimple molded into side of junction box base to locate center of hole, drill for user supplied power connection fittings per manufacturer’s recommendations.
-
Mount junction box base on expediter. Make sure to align slots to properly orient junction box base. Tighten nut securely
-
For power connection applications: Install power connection fittings (user supplied) and pull in power and ground wires.
-
Install quick mount terminal blocks.
-
Complete system wiring. Refer to typical wiring details on page 5. Tightening torque 1.5 Nm– 1.8 Nm (1.1 ft-lb–1.3 ft-lb)
-
Install junction box lid and twist hand tight. Insert screwdriver into ratchet slots located on side of junction box base
-
Use screwdriver to ratchet on junction box lid. Lid will rotate 30 degrees.
-
Lid latch mechanism fully engaged. To remove lid, repeat steps 14 and 15 but in the opposite direction.
Two Cable Layout Tips
Locate bus connection (HPT and FP only) and cable as shown. Cut end of cable
at angle to aid in piercing grommet. Leave additional cable for expansion loop
Insert two cables into expediter.
Note: For HPT and FP cable, exchange grommet in Terminator with GRW-G
provided in PETK-3.
Three Cable Layout Tips
Locate bus connection (HPT and FP only) and cable as shown. Cut end of cable
at angle to aid in piercing grommet. Leave additional cable for expansion
loop.
Insert three cables into expediter.
Note: For HPT and FP cable, exchange grommet in Terminator with GRW-G
provided in PETK-3.
Mount expediter with three cables. Do not band over cable.
Typical Wiring Details
Power Connection (1 to 3 Cables). For 3 cable power connections, additional
terminal blocks will be required when using 10mm2 (#8 AWG) power supply wiring
In-Line Splice and T-Splice
End Termination (1 to 2 Heating Cables) Remove jumpers for 2 cable
terminations.
Support
Corporate Headquarters:
-
100 Thermon Dr
-
PO Box 609 San Marcos, TX 78667-0609
-
Phone: 512-396-5801
-
1-800-820-4328
For the Thermon office nearest you visit us at . . . www.thermon.com
Form No. PN50845-0320 © Thermon, Inc. -
Printed in U.S.A.
-
Information subject to change.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>