RELIABILT 07-2980 Galvanized Steel Wall Mount Mailbox Instruction Manual

June 16, 2024
RELIABILT

**RELIABILT 07-2980 Galvanized Steel Wall Mount Mailbox Instruction Manual

**

INSTRUCTION

RELIABILT and logo design are trademarks or registered trademarks of LF, LLC.
All rights reserved.

Thank you for purchasing this RELIABILT product. We’ve created these easy-to- follow instructions to ensure you spend your time enjoying the product instead of putting it together. But, if you need more information than what is provided here, please visit Lowes.com, search the item number and refer to the Guides & Documents tab on the product’s page.

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list.

If any part is missing or damaged, do not attempt to assemble the product.

Estimated Assembly Time : 10-20 minutes.

TOOLS REQUIRED (NOT INCLUDED)

  • Level

  • Phillips Screwdriver

  • Measuring Tape

  • Drill

INSTALLATION OVERVIEW

  1. Using the template, mark screw holes. Check with level before drilling. Then, drill two 7/32”pilot holes(for masonry wall)or drill two 3/32”pilot holes (for wood wall, no anchors needed).

  2. For brick or other masonry walls, insert the anchor into the wall. Install screws, ensuring to leave a gap of ¼” between wall and screw head. Anchors are not needed for a wood wall.
    INSTALLATION OVERVIEW

  3. Mount mailbox on screws and tighten fully.

Use this guide to mark the bottom hole location – make sure the page is level before marking.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

RELIABILT User Manuals

Related Manuals