Deye SG01LP1 SUN 5-8 K Hybrid Inverter User Manual
- June 15, 2024
- Deye
Table of Contents
- Deye SG01LP1 SUN 5-8 K Hybrid Inverter
- Product Information
- Product Usage Instructions
- Product Overview
- Installation
- Operation
- LCD Display Icons
- Mode
- Fault Information and Processing
- Limitation of Liability
- Datasheet
- FAQ
- About This Manual
- Safety Introductions
- Installaon
- BUU5FNQ 4FOTPS
- MBDLXJSF
- MBDLXJSF
- BUUFSZQBDL
- BDLVQ-PBE
- BUUFSZQBDL
- BDLVQ-PBE
- BUUFSZQBDL
- BDLVQ-PBE
- BUUFSZQBDL
- BDLVQ-PBE
- 1IBTF*OWFSUFS/P NBTUFS
- 1IBTF.BTUFSJOWFSUFS
- BDLVQ-PBE
- 1IBTF.BTUFSJOWFSUFS
- 1IBTF.BTUFSJOWFSUFS
- 1IBTF*OWFSUFS/P NBTUFS
- 1IBTF.BTUFSJOWFSUFS
- BDLVQ-PBE
- OPERATION
- LCD Display Icons
- .41BHF -PBE(SBQI #BUUFSZ4FUUJOH 4ZTUFN8PSL.PEF (SJE4FUUJOH (FO1PSU6TF
- BTJD4FUUJOH “EWBODFE’VODUJPO %FWJDFJOGP
- BUUFSZWPMUBHFMPX
- .4EJTDPOOFDUFEXIFO#.4@&SS4UPQJTBDUJWF
- .4DPNNVOJDBUJPOGBVMU JGEPOnUXBOUUPTFFUIJTIBQQFO
- .4@&SS4UPQJUFNPOUIF-$%
- FJMVO
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Deye SG01LP1 SUN 5-8 K Hybrid Inverter
Product Information
Specifications:
- Product Name: Hybrid Inverter
- Functions: Inverter, Solar Charger, Battery Charger
- Size: Portable
- Display: LCD
- Input Voltage: AC/Solar
- Input Terminals: DC
- Ports: RS 485, CAN, Function, Meter_CON, Parallel
- MPPT: 2
- Input Sources: PV, Grid, Generator
Product Usage Instructions
Safety Introductions
Safety signs:
- The DC input terminals of the inverter must not be grounded.
- The AC and DC circuits must be disconnected separately, and the maintenance personnel must wait for 5 minutes before they are completely powered off before they can start working.
- Surface high temperature, Please do not touch the inverter case.
- Prohibit disassembling inverter case, there existing shock hazard, which may cause serious injury or death, please ask qualified person to repair.
- Please read the instructions carefully before use.
- Do Not put it in the waste bin! Recycle it by licensed professional!
Product Introductions
This is a multifunctional inverter, combining functions of inverter, solar charger, and battery charger to offer uninterrupted power support with portable size. Its comprehensive LCD display offers user configurable and easy accessible button operation such as battery charging, AC/solar charging, and acceptable input voltage based on different applications.
Product Overview
- Inverter Indicators
- LCD display
- Function Buttons
- DC Switch
- Power on/off button
- RS 485 port
- CAN Port
- Battery input connectors
- Function Port
- Meter_CON port
- Parallel port
- PV input with two MPPT
- Grid
- Generator input
Installation
Installation instructions can be found in the user manual pages 05-29. The instructions include information on electrical connections, power supply, and safety precautions.
Operation
The operation of the hybrid inverter is explained in detail on page 30 of the user manual. It includes information on how to turn on/off the inverter, battery charging, and AC/solar charging.
LCD Display Icons
The meaning and function of each LCD display icon can be found on pages 31-43 of the user manual. The icons represent various statuses and settings of the inverter.
Mode
Different modes of operation are explained on pages 43-45 of the user manual. These modes include battery mode, solar mode, and AC mode.
Fault Information and Processing
Information on fault detection, troubleshooting, and processing can be found on pages 45-48 of the user manual. This section provides guidance on identifying and resolving common issues.
Limitation of Liability
This section on page 48 of the user manual explains the limitation of liability for any damages or malfunctions caused by the hybrid inverter.
Datasheet
The technical specifications and performance data of the hybrid inverter can be found on pages 49-50 of the user manual. This provides detailed information for reference.
Appendix I
Additional information and resources can be found in Appendix I on pages
51-52 of the user manual.
Appendix II
Further details and supplementary information can be found in Appendix II
on page 53 of the user manual.
FAQ
Q: Where can I obtain the latest version of the manual?
A: The latest manual can be acquired via service@deye.com.cn
R
Hybrid Inverter
User Manual
About This Manual
The manual mainly describes the product informaon, guidelines for installaon,
operaon and maintenance. The manual cannot include complete informaon about
the photovoltaic (PV) system.
How to Use This Manual
Read the manual and other related documents before performing any operaon on
the inverter. Documents must be stored carefully and be available at all mes.
Contents may be periodically updated or revised due to product development.
The informaon in this manual is subject to change without noce. The latest
manual can be acquired via service@deye.com.cn
Safety Introductions
Safety signs
The DC input terminals of the inverter must not be grounded.
The AC and DC circuits must be disconnected separately, and the maintenance
personnel must wait for 5 minutes before they are completely powered off
before they can start working.
Surface high temperature, Please do not touch the inverter case.
Prohibit disassembling inverter case, there exisng shock hazard, which may
cause serious injury or death, please ask qualified person to repair.
Please read the instrucons carefully before use.
Do Not put it in the waste bin! Recycle it by licensed professional!
· This chapter contains important safety and operang instrucons. Read and keep
this manual for future reference.
· Before using the inverter, please read the instrucons and warning signs of
the baery and corresponding secons in the instrucon manual. · Do not
disassemble the inverter. If you need maintenance or repair, take it to a
professional service center. · Improper reassembly may result in electric
shock or fire. · To reduce risk of electric shock, disconnect all wires before
aempng any maintenance or cleaning. Turning off the unit will not reduce this
risk. · Cauon: Only qualified personnel can install this device with baery. ·
Never charge a frozen baery. · For opmum operaon of this inverter, please
follow required specificaon to select appropriate cable size. It is very
important to correctly operate this inverter. · Be very cauous when working
with metal tools on or around baeries. Dropping a tool may cause a spark or
short circuit in baeries or other electrical parts, even cause an explosion. ·
Please strictly follow installaon procedure when you want to disconnect AC or
DC terminals. Please refer to “Installaon” secon of this manual for the
details. · Grounding instrucons – this inverter should be connected to a
permanent grounded wiring system. Be sure to comply with local requirements
and regulaon to install this inverter. · Never cause AC output and DC input
short circuited. Do not connect to the mains when DC input short circuits.
2. Product Introducons
This is a mulfunconal inverter, combining funcons of inverter, solar charger
and baery charger to offer uninterrupble power support with portable size. Its
comprehensive LCD display offers user configurable and easy accessible buon
operaon such as baery charging, AC/solar charging, and acceptable input
voltage based on different applicaons.
2.1 Product Overview
1 2 3 4
5
8
9 10 11 12 17
1: Inverter Indicators 2: LCD display 3: Funcon Buons 4: DC Switch 5: Power
on/off buon 6: RS 485 port
6 7
15 14 13
16
7: CAN Port 8: Baery input connectors 9: Funcon Port 10: Meter_CON port 11: Parallel port 12: PV input with two MPPT
13: Grid
14: Generator input
15: Load
16: WiFi Interface
17: DRMs Port (*Note: For US model, it doesn’t have this port)
Product Size
Inverter Size
Product Features
– Supports Split phase 120/240Vac, Three-phase 120/208Vac system. – Self-
consumpon and feed-in to the grid. – Auto restart while AC is recovering. –
Programmable supply priority for baery or grid. – Programmable mulple operaon
modes: On grid, off grid and UPS. – Configurable baery charging
current/voltage based on applicaons by LCD seng. – Configurable
AC/Solar/Generator Charger priority by LCD seng. – Compable with mains voltage
or generator power. – Overload/over temperature/short circuit protecon. –
Smart baery charger design for opmized baery performance – With limit funcon,
prevent excess power overflow to the grid. – Supporng WIFI monitoring and
build-in 2 strings of MPP trackers – Smart seable three stages MPPT charging
for opmized baery performance. – Time of use funcon. – Smart Load Funcon.
2.4 Basic System Architecture
The following illustraon shows basic applicaon of this inverter. It also
includes following devices to have a Complete running system. – Generator or
Ulity – PV modules Consult with your system integrator for other possible
system architectures depending on your requirements. This inverter can power
all kinds of appliances in home or office environment, including motor type
appliances such as refrigerator and air condioner.
WiFI GPRS
Cloud services
AC cable DC cable phone
Solar
Backup Load
On-Grid Home Load
Grid CT
Battery
Smart Load
Grid-connected Inverter
Generator ATS
Installaon
Parts List
Check the equipment before installaon. Please make sure nothing is damaged in
the package. You should have received the items in the following package:
Hybrid inverter x1
Stainless steel an-collision bolt M8×80 x4
Parallel communicaon cable x1
L-type Hexagon wrench x1
User manual
User manual x1
Wi-Fi-Plug(oponal) x1
Baery temperature sensor x1
Sensor Clamp US x2 / EU x1
Magnec ring for baery x 1
Magnec ring for BMS communicaon cable
x 1
3.2 Mounng instrucons Installaon Precauon
This Hybrid inverter is designed for outdoor use(IP65), Please make sure the
installaon site meets below condions: · Not in direct sunlight · Not in areas
where highly flammable materials are stored. · Not in potenal explosive areas.
· Not in the cool air directly. · Not near the television Antenna or antenna
cable. · Not higher than altude of about 2000 meters above sea level. · Not in
environment of precipitaon or humidity(>95%) Please AVOID direct sunlight,
rain exposure, snow laying up during installaon and operaon. Before connecng
all wires, please take off the metal cover by removing screws as shown below:
Considering the following points before selecng where to install:
· Please select a vercal wall with load-bearing capacity for installaon,
suitable for installaon on concrete or other non-flammable surfaces,installaon
is shown below. · Install this inverter at eye level in order to allow the LCD
display to be read at all mes. · The ambient temperature is recommeded to be
between -40~60¥ to ensure opmal operaon. · Be sure to keep other objects and
surfaces as shown in the diagram to guarantee sufficient heat dissipaon and
have enough space for removing wires.
500mm
500mm
For proper air circulaon to dissipate heat, allow a clearance of approx. 50cm
to the side and approx. 50cm above and below the unit. And 100cm to the front.
Mounng the inverter
Remember that this inverter is heavy! Please be careful when liing out from
the package. Choose the recommend drill head(as shown in below pic) to drill 4
holes on the wall, 82-90mm deep. 1. Use a proper hammer to fit the expansion
bolt into the holes. 2. Carry the inverter and holding it, make sure the
hanger aim at the expansion bolt,fix the
inverter on the wall. 3. Fasten the screw head of the expansion bolt to finish
the mounng.
1
NN JO
2
3
_NN < JO
UP JO
3.3 Baery connecon
For safe operaon and compliance, a separate DC over-current protector or
disconnect device is required between the baery and the inverter. In some
applicaons, switching devices may not be required but over-current protectors
are sll required. Refer to the typical amperage in the table below for the
required fuse or circuit breaker size.
Model 5/6kW 7.6/8kW
Wire Size 2AWG 1AWG
Cable(mm 2 ) 35 50
Chart 3-2 Cable size
Torque value(max) 24.5Nm 24.5Nm
All wiring must be performed by a professional person.
Connecng the baery with a suitable cable is important for safe and efficient
operaon of the system. To reduce the risk of injury, refer to Chart 3-2 for
recommended cables. Please follow below steps to implement baery connecon: 1.
Please choose a suitable baery cable with correct connector which can well fit
into the baery terminals. 2. Use a suitable screwdriver to unscrew the bolts
and fit the baery connectors in, then fasten the bolt by the screwdriver, make
sure the bolts are ghtened with torque of 24.5 N.M in clockwise direcon 3.
Make sure polarity at both the baery and inverter is correctly connected.
30mm
30mm
For 7.6kW/8kW model, baery connector screw size: M10
22mm
10.5mm
DC Baery Input
Pass the baery power cable through the magnec ring and wrap it around the magnec ring two mes.
Pass the BMS communicaon cable through the magnec ring and wrap it around the magnec ring four mes.
4. In case of children touch or insects go into the inverter, Please make sure the inverter connector is fasten to waterproof posion by twist it clockwise.
Installaon must be performed with care.
Before making the final DC connecon or closing DC breaker/disconnect, be sure posive(+) must be connect to posive(+) and negave(-) must be connected to negave(-). Reverse polarity connecon on baery will damage the inverter.
3.3.2 Funcon port definion
*OWFSUFS
34 $”/
“54
.FUFS@$0/ 1BSBMMFM@” 1BSBMMFM@#
%3.T
RS 485: RS 485 port for baery
BUU5FNQ 4FOTPS
$5-
(FOTUBSUVQ /03FMBZ
7$PJM /&#PBFSOVUIEUSBM
communicaon. CAN: CAN port for baery communicaon. Parallel A: Parallel communicaon port 1 CAN interface Parallel B: Parallel communicaon port 2 CAN interface
DRMs: for Australia market only.
$5-
(*Note: For US model, it doesn’t have
TEMP (1,2): baery temperature sensor for
this port)
lead acid baery.
CT-L1 (3,4): current transformer (CT1) for
“zero export to CT”mode clamps
on L1 when in split phase system.
CT-L2 (5,6): current transformer (CT2) for
“zero export to CT”mode clamps
on L2 when in split phase system.
G-start (7,8): dry contact signal for startup the diesel generator.
When the “GEN signal” is acve, the open contact (GS) will switch on (no
voltage output).
DPJM DPPOQUFBODU
SFMBZ
G-valve (9,10): reserved. RSD (11,12): provide 12Vdc output when
inverter is on.
(
4
GS (diesel generator startup signal)
ATS: 230V output port when inverter is on
Note: For – EU model (7.6/8kW,230V@50Hz),
1pcs CT is needed only, and the secondary
side of the CT should be connected to
5&6 port (CT-L2).
3.3.3 Temperature sensor connecon for lead-acid baery
5FNQTFOTPS
3.4 Grid connecon and backup load connecon
· Before connecng to the grid, a separate AC breaker must be installed between
the inverter and the grid, and also between the backup load and the
inverter.This will ensure the inverter can be securely disconnected during
maintenance and fully protected from over current. The recommended of AC
breaker is 40A for 5kW and 63A for 8kW.
· There are three terminal blocks with “Grid” “Load”and “GEN” markings. Please
do not misconnect input and output connectors.
All wiring must be performed by a qualified personnel.It is very important for
system safety and efficient operaon to use appropriate cable for AC input
connecon. To reduce risk of injury, please use the proper recommended cable as
below.
Model
Wire Size
Cable(mm 2 )
Torque value(max)
5/6kW
12AWG
4
7.6/8kW
10AWG
6
1.2Nm 1.2Nm
Chart 3-3 Recommended Size for AC wires
Please follow below steps to implement AC input/output connecon:
1. Before making Grid, load and Gen port connecon, be sure to turn off AC
breaker or disconnector first.
2. Remove insulaon sleeve 10mm length, unscrew the bolts, insert the wires
according to polaries indicated on the terminal block and ghten the terminal
screws. Make sure the connecon is complete.
3FHJPO&6
GRID GEN PORT LOAD
GRID
NL
GEN PORT
NL
3FHJPO64
LOAD
NL
L1 N L2
GRID
L1 N L2
GEN PORT
L1 N L2
LOAD
Be sure that AC power source is disconnected before aempng to wire it to the unit.
3. Then, insert AC output wires according to polaries indicated on the
terminal block and ghten terminal. Be sure to connect corresponding N wires
and PE wires to related terminals as well.
4. Make sure the wires are securely connected. 5. Appliances such as air
condioner are required at least 2-3 minutes to restart because it is
required to have enough me to balance refrigerant gas inside of circuit. If a
power shortage occurs and recovers in short me, it will cause damage to your
connected appliances. To prevent this kind of damage, please check
manufacturer of air condioner if it is equipped with me-delay funcon before
installaon. Otherwise, this inverter will trigger overload fault and cut off
output to protect your appliance but somemes it sll causes internal damage to
the air condioner
3.5 PV Connecon
Before connecng to PV modules, please install a separately DC circuit breaker
between inverter and PV modules. It is very important for system safety and
efficient operaon to use appropriate cable for PV module connecon. To reduce
risk of injury, please use the proper recommended cable size as below.
Model 5/6/7.6/8kW
Wire Size 12AWG Chart 3-4 Cable size
Cable(mm2 ) 4
To avoid any malfuncon, do not connect any PV modules with possible current
leakage to the inverter. For example, grounded PV modules will cause current
leakage to the inverter. When using PV modules, please ensure the PV+ & PV- o
f solar panel is not connected to the system ground bar.
It is requested to use PV juncon box with surge protecon. Otherwise, it will
cause damage on inverter when lightning occurs on PV modules.
3.5.1 PV Module Selecon:
When selecng proper PV modules, please be sure to consider below parameters:
- Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open
circuit voltage of
inverter. 2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage. 3) The PV modules used to connected to this inverter shall be Class A rang cerfied according
to lEC 61730.
Inverter Model
5kW
6kW
7.6kW
8kW
PV Input Voltage
370V (125V~500V)
PV Array MPPT Voltage Range No. of MPP Trackers
150V-425V 2
No. of Strings per MPP Tracker
1+1
2+1
2+2
Chart 3-5
PV Module Wire Connecon:
Please follow below steps to implement PV module connecon: 1. Remove insulaon
sleeve 10 mm for posive and negave conductors. 2. Suggest to put bootlace
ferrules on the end of posive and negave wires with a proper
crimping tool. 3. Check correct polarity of wire connecon from PV modules and
PV input connectors. Then,
connect posive pole (+) of connecon wire to posive pole (+) of PV input
connector. Connect negave pole (-) of connecon wire to negave pole(-)of PV
input connector. Close the switch and make sure the wires are ghtly fixed.
3.6 CT Connecon
(Region:EU)
(SJE
(&/ -PBE
/-
/-
/-
*OWFSUFS
(Region:US)
8IJUFXJSF
MBDLXJSF
/-
(SJE
$5
–
/
*GUIFEBUBSFBECZUIF$5JTXSPOH
ZPVDBOUSZUPQPJOU UIFEJSFDUJPOPGUIF$5UPUIFHSJE
$5
“SSPXQPJOUJOH UPJOWFSUFS
5IFQSJNBSZTJEFPGUIF$5 OFFETUPCFDMBNQFEPOUIF (SJEMJWFMJOF
(SJE (&/ -PBE
/–
/–
/–
*OWFSUFS
8IJUFXJSF
MBDLXJSF
/–
(SJE
*GUIFEBUBSFBECZUIF$5JTXSPOH
ZPVDBOUSZUPQPJOU UIFEJSFDUJPOPGUIF$5UPUIFHSJE
$5 –
$5 –
/
$5
“SSPXQPJOUJOH UPJOWFSUFS
5IFQSJNBSZTJEFPGUIF$5 OFFETUPCFDMBNQFEPOUIF (SJEMJWFMJOF
3.6.1 Meter Connecon
(Region:EU )
(SJE
(&/ -PBE
/-
/-
/-
/-
*OWFSUFS
.FUFS@$0/ 1BSBMMFM@” 1BSBMMFM@#
“$ #SFBLFS
System connecon diagram for the CHNT meter
%%46%/3″-.&5&3
Grid input
12
Output
34
RS 485
7
“JNQL8I
$)/5%%46
CHINT meter
RS485A RS485B
%%46%/3″-.&5&3 7
“JNQL8I
(SJE -/
*OWFSUFS
34
(SJE
(&/ -PBE
/-
/-
/-
.FUFS@$0/ 1BSBMMFM@” 1BSBMMFM@#
System connecon diagram for the Eastron meter
1
2
230V/2T
Input
13
Output
24
L
L
N
N
5 6 7 8 9 10 A B GND 1+COM 2+
3
4
&”4530/4%. Pic 7.1 EASTRON meter
RS 485 GND
56 7
A B GND
“$ #SFBLFS
RS485A RS485B
1
2
230V/2T
5 6 7 8 9 10 A B GND 1+COM 2+
3
4
/-
(SJE -/
(Region:US)
*OWFSUFS
5ISFF1IBTF4NBSU.FUFS
4&5 &4$
$)/5%546
L1 L2 (1,4,7,10) L3
RS 485
CHINT meter
.FUFS@$0/ 1BSBMMFM@” 1BSBMMFM@#
(3,6,9,10)
RS485A RS485B
(SJE (&/ -PBE
/–
/–
/–
“$ #SFBLFS
– –
5ISFF1IBTF4NBSU.FUFS
4&5 &4$
(SJE
– –
/
*OWFSUFS
.FUFS@$0/ 1BSBMMFM@” 1BSBMMFM@#
&BTUSPO
1234
L1 L2 L3
(1,2,3,4)
5 6 7 8
&BTUSPO4%..PECVT7
RS 485
B A G
RS485B RS485A GND
Eastron meter
5678
L3 L2 L1 (5,6,7,8)
RS485A RS485B
78
5 6
(SJE (&/ -PBE
/–
/–
/–
“$ #SFBLFS
– –
/– /–
&BTUSPO
/
(SJE
– –
Note: When the inverter is in the off-grid state, the N line needs to be
connected to the earth. Note: In final installaon,breaker cerfied according to
IEC 60947-1 and IEC 60947-2 shall be installed with the equipment. 3.7 Earth
Connecon(mandatory) Ground cable shall be connected to ground plate on grid
side, this prevents electric shock if the original protecve conductor fails.
3.8 WIFI Connecon
For the configuraon of Wi-Fi Plug, please refer to illustraons of the Wi-Fi
Plug. The Wi-Fi Plug is not a standard configuraon, it’s oponal.
3.9 Wiring System for Inverter
(Region:EU)
DC Breaker
PV
BMS
Battery
DC Breaker AC Breaker Diesel generator
This diagram is an example for grid systems without special requirements on electrical wiring connecon. Note: The back-up PE line and earthing bar must be grounded properly and effecvely. Otherwise the back-up funcon may be abnormal when the grid fails.
Hybrid Inverter
L N PE Load CT
L N PE Grid
AC Breaker
AC Breaker
AC Breaker CT
E-BAR
L
N Load
PE
L
N Grid
PE
E-BAR
L N PE
Home Loads
DC Breaker
PV
BMS
Battery
DC Breaker AC Breaker Diesel generator
This diagram is an example for applicaon that Neutral connects together with PE in distribuon box. Such as: Australia, New Zealand, South Africa, etc. (Please follow local wiring regulaons!)
Hybrid Inverter
L N PE or Load CT
L N PE Grid
AC Breaker
Do not connect this terminal when the neutral wire and PE wire are connected
together.
AC Breaker CT
E-BAR
AC Breaker
N-BAR E-N Link
E-BAR
L
N Load
PE
L
N Grid
PE
L N PE
Home Loads
(Region:US)
PV
DC Breaker
BMS
Battery
DC Breaker
GEN PORT
AC Breaker
L1 L2 N PE
L1 L2 N PE or
Load
Hybrid Inverter
CT
L1 L2 N PE
Grid
AC Breaker
AC Breaker
AC Breaker CT1 CT2
E-BAR
E-N LINK
E-BAR
L1 L2 N PE
Home Loads
L1 L2
N Load
PE
L1 L2
N Grid
PE
3.10 Typical applicaon diagram of diesel generator
(Region:EU)
$”/
-XJSF
/XJSF
1&XJSF
*OWFSUFS
æ%$#SFBLFSGPSCBUUFSZ 46/,4(“%$CSFBLFS 46/,4(“%$CSFBLFS “$#SFBLFSGPSHFOQPSU
46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS “$#SFBLFSGPSCBDLVQMPBEQPSU 46/,4(“”$CSFBLFS
46/,4(“”$CSFBLFS
æ%$ #SFBLFS
*OWFSUFS
G-start (7,8): dry contact signal for startup the diesel generator.
DPJM DPPOQUFBODU
SFMBZ
(
4
GS (diesel generator startup signal)
(SPVOE
3FNPUFMZDPOUSPMTJHOBMMJOF
BUUFSZQBDL
(FOFSBUPS 1& / –
/ 1&
BDLVQ-PBE
3.11 Single phase (230Vac) parallel connecon diagram
(Region:EU)
$”/
-XJSF
/XJSF
1&XJSF
*OWFSUFS /P TMBWF
1BSBMMFM” 1BSBMMFM#
(SPVOE
*OWFSUFS
æ%$ #SFBLFS
æçè%$#SFBLFSGPSCBUUFSZ 46/,4(“%$CSFBLFS 46/,4(“%$CSFBLFS
êìî”$#SFBLFSGPSHSJEQPSU 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
éëí”$#SFBLFSGPS CBDLVQMPBEQPSU 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
ï”$#SFBLFS %FQFOETPO)PNF-PBE
*OWFSUFS /P TMBWF
ç%$ #SFBLFS
*OWFSUFS /P NBTUFS
è%$ #SFBLFS
é ê ë ì
í
BUUFSZQBDL
î
$5
5IFQSJNBSZTJEFPGUIF$5 OFFETUPCFDMBNQFEPOUIF (SJEMJWFMJOF
ï
(SJE 1& / –
“SSPXQPJOUJOH UPJOWFSUFS
.BTUFSJOWFSUFS
4MBWF*OWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 01
A Phase B Phase C Phase
Paral. Set3
Advanced Function
Parallel Master Slave
Modbus SN 02
A Phase B Phase C Phase
Paral. Set3
)PNF-PBE
4MBWF*OWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 03
A Phase B Phase C Phase
Paral. Set3
/ 1&
BDLVQ-PBE
3.12 Split phase (120/240Vac) parallel connecon diagram
(Region:US)
$”/
-XJSF
/XJSF
1&XJSF
*OWFSUFS
*OWFSUFS /P TMBWF
/– /– /–
(SJE (&/ -PBE
1BSBMMFM” 1BSBMMFM#
(SPVOE
æ%$ #SFBLFS
æçè%$#SFBLFSGPSCBUUFSZ 46/,4(“%$CSFBLFS 46/,4(“%$CSFBLFS 46/,4(“%$CSFBLFS
46/,4(“%$CSFBLFS êìî”$#SFBLFSGPSHSJEQPSU 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS éëí”$#SFBLFSGPS CBDLVQMPBEQPSU
46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
ï”$#SFBLFS %FQFOETPO)PNF-PBE
*OWFSUFS /P TMBWF
ç%$ #SFBLFS
*OWFSUFS /P NBTUFS
è%$ #SFBLFS
/– /– /–
(SJE (&/ -PBE
ê
é
ë
ì
í
BUUFSZQBDL
î
$5
5IFQSJNBSZTJEFPGUIF$5 OFFETUPCFDMBNQFEPOUIF (SJEMJWFMJOF
“SSPXQPJOUJOH UPJOWFSUFS
$5 $5
(SJE 1& /- –
ï”$ #SFBLFS
.BTUFSJOWFSUFS
4MBWF*OWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 01
A Phase B Phase C Phase
Paral. Set3
Advanced Function
Parallel Master Slave
Modbus SN 02
A Phase B Phase C Phase
Paral. Set3
)PNF-PBE
4MBWF*OWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 03
A Phase B Phase C Phase
Paral. Set3
– – / 1&
BDLVQ-PBE
(Region:EU)
$”/
-XJSF
*OWFSUFS /P TMBWF
*OWFSUFS
æ%$ #SFBLFS æçè%$#SFBLFSGPSCBUUFSZ 46/,4(“%$CSFBLFS 46/,4(“%$CSFBLFS
êìî”$#SFBLFSGPS(&/QPSU 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS éëí”$#SFBLFSGPS
CBDLVQMPBEQPSU 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
BUUFSZQBDL
*OWFSUFS /P TMBWF
ç%$ #SFBLFS
*OWFSUFS /P NBTUFS
è%$ #SFBLFS
/XJSF
1&XJSF
(SJE
(&/ -PBE
/-
/-
/-
1BSBMMFM” 1BSBMMFM#
(SPVOE
(SJE
(&/ -PBE
/-
/-
/-
é ê
ë
(SJE
(&/ -PBE
/-
/-
/-
ì
í î
(FOFSBUPS
1& / –
.BTUFSJOWFSUFS
4MBWF*OWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 01
A Phase B Phase C Phase
Paral. Set3
Advanced Function
Parallel Master Slave
Modbus SN 02
A Phase B Phase C Phase
Paral. Set3
4MBWF*OWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 03
A Phase B Phase C Phase
Paral. Set3
/ 1&
BDLVQ-PBE
3.13 Parallel connecon for 230/400 three phase
æçè%$#SFBLFSGPSCBUUFSZ
46/,4(“%$CSFBLFS 46/,4(“%$CSFBLFS
é”$#SFBLFSGPSCBDLVQMPBEQPSU
46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
ê”$#SFBLFSGPSHSJEQPSU
46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
ë”$#SFBLFS %FQFOETPO)PNF-PBE
$”/
-XJSF
/XJSF
1&XJSF
1BSBMMFM” 1BSBMMFM#
“1IBTF*OWFSUFS/P NBTUFS
1IBTF*OWFSUFS/P NBTUFS
$1IBTF*OWFSUFS/P NBTUFS
(SJE (&/ -PBE
(SJE (&/ -PBE
(SJE (&/ -PBE
$”/34 #BUUFSZQBDL
æ%$ #SFBLFS ê”$#SFBLFS
ç%$ #SFBLFS
è%$ #SFBLFS
(SPVOE
é”$#SFBLFS – – – /1&
)PNFMPBE
ë”$#SFBLFS
$5 $5 $5 – – -/ 1&
$5
“SSPXQPJOUJOH UPJOWFSUFS
/#”3
&#”3 “1IBTF.BTUFSJOWFSUFS
1IBTF.BTUFSJOWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 01
A Phase B Phase C Phase
Paral. Set3
Advanced Function
Parallel Master Slave
Modbus SN 02
A Phase B Phase C Phase
Paral. Set3
BDLVQ-PBE
$1IBTF.BTUFSJOWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 03
A Phase B Phase C Phase
Paral. Set3
(SJE
(Region:EU)
3.14 pcs Parallel connecon for 120/208 three phase
1BSBMMFM” 1BSBMMFM#
/– *OWFSUFS/P NBTUFS
(SJE (&/ -PBE
$”/34 #BUUFSZQBDL
æ%$ #SFBLFS
)PNFMPBE
é”$#SFBLFS
1BSBMMFMDPNNVOJDBUJPODBCMF
/– *OWFSUFS/P NBTUFS
(SJE (&/ -PBE
ç%$ #SFBLFS
æç%$#SFBLFSGPSCBUUFSZ
44446666////,,,,444(((4(“”””%%%%$$$$CCCSSSCFFFSBBBFLLLBFFFLSSSFS
è”$#SFBLFSGPSCBDLVQMPBEQPSU 444666///,,,44((4(“””””$$”$CCSSCFFSBBFLLBFFLSSFS
46/,4(“”$CSFBLFS
é”$#SFBLFSGPSHSJEQPSU 444666///,,,44((4(“””””$$”$CCSSCFFSBBFLLBFFLSSFS
46/,4(“”$CSFBLFS
ê”$#SFBLFS %FQFOETPO)PNF-PBE (SPVOE
è”$#SFBLFS
L1 –
L2 —
L3 –
N
PE
ê”$#SFBLFS $5 $5 $5
L1 –
L2 —
L3 –
N PE
$5
“SSPXQPJOUJOH UPJOWFSUFS
/#”3
CBDLVQ-PBE
&#”3 “1IBTF.BTUFSJOWFSUFS
1IBTF.BTUFSJOWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 01
A Phase B Phase C Phase
Paral. Set3
Advanced Function
Parallel Master Slave
Modbus SN 02
A Phase B Phase C Phase
Paral. Set3
(Region:US)
3.15 Parallel connecon for 120/208 three phase (Region:US)
1BSBMMFM” 1BSBMMFM#
/– *OWFSUFS/P NBTUFS
(SJE (&/ -PBE
/– *OWFSUFS/P NBTUFS
(SJE (&/ -PBE
$”/34 #BUUFSZQBDL
æ%$ #SFBLFS
)PNFMPBE
ê”$#SFBLFS
ç%$ #SFBLFS
/– *OWFSUFS/P NBTUFS
(SJE (&/ -PBE
æçè%$#SFBLFSGPSCBUUFSZ
46/,4(“%$CSFBLFS 46/,4(“%$CSFBLFS 46/,4(“%$CSFBLFS 46/,4(“%$CSFBLFS
é”$#SFBLFSGPSCBDLVQMPBEQPSU
46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
ê”$#SFBLFSGPSHSJEQPSU
46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
ë”$#SFBLFS %FQFOETPO)PNF-PBE
(SPVOE
è%$ #SFBLFS
é”$#SFBLFS
L1 —
L2 —
L3 —
N
PE
ë”$#SFBLFS $5 $5 $5
L1 —
L2 —
$5
L3 —
N
PE
/PUFUIFTU$5OFFETUPCFDPOOFDUFE UIFQPSUPGNBTUFS”IZCSJEJOWFSUFS
UIFTFDPOE$5OFFETUPCFDPOOFDUFEUIF QPSUPGUIFNBTUFS”IZCSJEJOWFSUFS
5IFUISJE$5OFFETUPCFDPOOFDUFEUP QPSUPGUIFNBTUFS#IZCSJEJOWFSUFS
“SSPXQPJOUJOH UPJOWFSUFS
/#”3
CBDLVQ-PBE
&#”3 “1IBTF.BTUFSJOWFSUFS
1IBTF.BTUFSJOWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 01
A Phase B Phase C Phase
Paral. Set3
Advanced Function
Parallel Master Slave
Modbus SN 02
A Phase B Phase C Phase
Paral. Set3
$1IBTF.BTUFSJOWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 03
A Phase B Phase C Phase
Paral. Set3
æçè%$#SFBLFSGPSCBUUFSZ
46/,4(“%$CSFBLFS 46/,4(“%$CSFBLFS
é”$#SFBLFSGPSCBDLVQMPBEQPSU
46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
ê”$#SFBLFSGPS(&/QPSU
46/,4(“”$CSFBLFS 46/,4(“”$CSFBLFS
$”/
-XJSF
/XJSF
1&XJSF
1BSBMMFM” 1BSBMMFM#
“1IBTF*OWFSUFS/P NBTUFS
1IBTF*OWFSUFS/P NBTUFS
$1IBTF*OWFSUFS/P NBTUFS
$”/34 #BUUFSZQBDL
æ%$ #SFBLFS ê”$#SFBLFS
– – -/
(FOFSBUPS 1&
ç%$ #SFBLFS
è%$ #SFBLFS
(SPVOE
é”$#SFBLFS – – -/1&
/#”3
&#”3 “1IBTF.BTUFSJOWFSUFS
1IBTF.BTUFSJOWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 01
A Phase B Phase C Phase
Paral. Set3
Advanced Function
Parallel Master Slave
Modbus SN 02
A Phase B Phase C Phase
Paral. Set3
BDLVQ-PBE
$1IBTF.BTUFSJOWFSUFS
Advanced Function
Parallel Master Slave
Modbus SN 03
A Phase B Phase C Phase
Paral. Set3
(Region:EU)
OPERATION
Power ON/OFF
Once the unit has been properly installed and the baeries are connected well,
simply press On/Off buon(located on the le side of the case) to turn on the
unit. When system without baery connected, but connect with either PV or grid,
and ON/OFF buon is switched off, LCD will sll light up(Display will show OFF),
In this condion, when switch on ON/OFF buon and select NO baery,system can sll
working.
4.2 Operaon and Display Panel
The operaon and display panel, shown in below chart, is on the front panel of
the inverter. It includes four indicators, four funcon keys and a LCD display,
indicang the operang status and input/output power informaon.
DC AC Normal Alarm
LED Indicator Green led solid light Green led solid light Green led solid light Red led solid light
Messages PV Connecon normal Grid Connecon normal Inverter operang normal Malfuncon or warning
Chart 4-1 LED indicators
Function Key Esc Up
Down Enter
Description To exit seng mode To go to previous selecon To go to next selecon
To confirm the selecon
Chart 4-2 Funcon Buons
LCD Display Icons
Main Screen
The LCD is touchscreen, below screen shows the overall informaon of the
inverter.
05/28/2019 15:34:40
0 8.30 12
KW
ON
25%
0 -2.00 8 KW
0 -3.00 8 KW
0 3.00 8 KW
1.The icon in the center of the home screen indicates that the system is
Normal operaon. If it turns into “comm./F01~F64” , it means the inverter has
communicaon errors or other errors, the error message will display under this
icon(F01-F64 errors, detail error info can be viewed in the System Alarms
menu).
2.At the top of the screen is the me.
3.System Setup Icon, Press this set buon,you can enter into the system setup
screen which including Basic Setup, Baery Setup, Grid Setup, System Work Mode,
Generator port use, Advanced funcon and Li-Ba info.
4.The main screen showing the info including Solar, Grid, Load and Baery. Its
also displaying the energy flow direcon by arrow. When the power is
approximate to high level, the color on the panels will changing from green to
red so system info showing vividly on the main screen.
· PV power and Load power always keep posive. · Grid power negave means sell
to grid, posive means get from grid. · Baery power negave means charge, posive
means discharge.
5.1.1 LCD operaon flow chart
.BJO4DSFFO
4PMBS1BHF (SJE1BHF *OWFSUFS1BHF #BUUFSZ1BHF -PBE1BHF
4ZTUFN4FUVQ
4PMBS(SBQI (SJE(SBQI
.41BHF -PBE(SBQI #BUUFSZ4FUUJOH 4ZTUFN8PSL.PEF (SJE4FUUJOH (FO1PSU6TF
BTJD4FUUJOH “EWBODFE’VODUJPO %FWJDFJOGP
5.2 Solar Power Curve
Solar
Power: 2923W PV1-V: 0V PV1-I: 0A
P1: 0W
Grid Tie Power: 2923W
PV2-V: 0V
PV2-I: 0.1A
P2: 0W
Today=0.3 KWH
Total =3.90 KWH
Energy
This is Solar Panel detail page. Solar Panel Generaon.
Grid Tie Power: when there’s a string inverter AC couple at the grid or load
side of hybrid inverter and there’s a meter installed for the string inverter,
then the hybrid inverter LCD will show the string inverter output power on its
PV icon. Please make sure the meter can communicate with the hybrid inverter
successfully.
Voltage, Current, Power for each MPPT.
Solar Panel energy for Day and Total. Press the “Energy “buon will enter into
the power curve page.
Inverter
Power: 44W 0.0Hz
L1: 240V l1:0.6A
DC-T:52.6C AC-T:41.0C
This is Inverter detail page.
Inverter Generaon. 0.0Hz: frequency aer DC/AC.
Voltage, Current, Power for each Phase.
*DC-T: mean DC-DC temperature,
AC-T: mean Heat-sink temperature.
*Note: this part info is not avaiable for some LCD FW.
Load
Power: 0W L: 0V
This is Load detail page.
Load Power.
Today=0.0 KWH Voltage, Power for each Phase.
Total =0.40 KWH
Load consumpon for Day and Total.
Energy
When you check “Selling First” or “Zero export to Load” on system work mode page, the informaon on this page is about backup load which connect on Load port of hybrid inverter. When you check “Zero export to CT”on system work mode page, the informaon on this page is including backup load and home load. Press the “Energy ” buon will enter into the power curve page.
Grid
This is Grid detail page.
Stand-by
Power: 0W
0.0Hz
L1: 0V L2: 0V
CT1: 0W CT2: 0W
BUY
Today=2.2KWH
Total =11.60 KWH
SELL
Today=0.0KWH
Total =8.60 KWH
Status, Power, Frequency. L1&L2: Voltage for each Phase
CT1&CT2: External Current Sensor Power LD1&LD2: Internal Current Sensor Power.
BUY: Energy from Grid to Inverter, SELL: Energy from Inverter to Grid.
LD1: 0W LD2: 0W
Energy Press the “Energy ” buon will enter into the power curve page.
Batt
Stand-by SOC: 36% U:50.50V I:-58.02A Power: -2930W Temp:30.0C
Li-BMS
This is Baery detail page. if you use Lithium Baery, you can enter BMS page.
5.3 Curve Page-Solar & Load & Grid
Li-BMS
Mean Voltage:50.34V Charging Voltage :53.2V Total Current:55.00A Discharging Voltage :47.0V Mean Temp :23.5C Charging current :50A
Sum Data
Total SOC :38%
Discharging current :25A
Dump Energy:57Ah Request Force Charge
Details Data
Request Force Charge: It indicates the BMS requests hybrid inverter to charge the baery acvely.
Li-BMS
Volt Curr Temp
1 50.38V 19.70A 2 50.33V 19.10A 3 50.30V 16.90A 4 0.00V 0.00A 5 0.00V 0.00A 6 0.00V 0.00A 7 0.00V 0.00A 8 0.00V 0.00A 9 0.00V 0.00A 10 0.00V 0.00A 11 0.00V 0.00A 12 0.00V 0.00A 13 0.00V 0.00A 14 0.00V 0.00A 15 0.00V 0.00A
30.6C 31.0C 30.2C 0.0C 0.0C 0.0C 0.0C 0.0C 0.0C 0.0C 0.0C 0.0C 0.0C 0.0C 0.0C
SOC
52.0% 51.0% 12.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Energy
26.0Ah 25.5Ah 6.0Ah 0.0Ah 0.0Ah 0.0Ah 0.0Ah 0.0Ah 0.0Ah 0.0Ah 0.0Ah 0.0Ah
0.0Ah 0.0Ah 0.0Ah
Charge Fault Volt Curr 0.0V 0.0A 0|0|0 53.2V 25.0A 0|0|0 53.2V 25.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0 0.0V 0.0A 0|0|0
Sum Data
Details Data
Solar Power Production:Day
3000W 100%
80% 60% 40% 20%
2019-5-28
1 3 5 7 9 11 13 15 17 19 21 23
CANCEL
Day
Month
Year
Total
System Solar Power:Month
2000Wh
5-2019
2000
1600
1200
800
400
0 05 10 15 20 25 30
CANCEL
Day
Month
Year
Total
System Solar Power:Year
KWh 200 160 120 80 40
2019
1 2 3 4 5 6 7 8 9 10 11 12
CANCEL
Day
Month
Year
Total
System Grid Power:Total
2000KWh
TOTAL
2000
1600
1200
800
400
0 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
CANCEL
Day
Month
Year
Total
Solar power curve for daily, monthly, yearly and total can be roughly checked on the LCD, for more accuracy power generaon, pls check on the monitoring system. Click the up and down arrow to check power curve of different period.
5.4 System Setup Menu
System Setup
Battery Setting
Basic Setting
System Work Mode
Grid Setting
Advanced Function
Gen Port Use
Device Info.
This is System Setup page.
5.5 Basic Setup Menu
Basic Setting
Time Syncs
Year
2019
Beep
Month
03
Auto Dim
Day
17
Basic Set
24-Hour
Hour
09
Minute
15
Factory Reset
Lock out all changes
Factory Reset: Reset all parameters of the inverter. Lock out all changes:
Enable this menu for seng parameters that require locking and cannot be set
up. Before performing a successful factory reset and locking the systems, to
keep all changes you need to type in a password to enable the seng. The
password for factory sengs is 9999 and for lock
out is 7777.
PassWord
X–X–X–X
1
2
4
5
7
8
CANCEL
0
DEL 3 6 9 OK
Factory Reset Password: 9999
Lock out all changes Password: 7777
System selfchek: Aer cking this item, it needs input the password. The default
password is 1234
5.6 Baery Setup Menu
Battery Setting
Baery capacity: it tells Deye hybrid inverter to know your baery bank size.
Batt Mode
Use Ba V: Use Baery Voltage for all the sengs (V).
Lithium Use Batt V
Batt Capacity Max A Charge
400Ah 40A
Use Ba %: Use Baery SOC for all the sengs (%). Batt Max. A charge/discharge: Max baery charge/discharge Mode current(0-90A for 3.6kW model, 0-120A for 5kW model,
Use Batt %
Max A Discharge 40A
0-135A for 6kW model, 0-190A for 7.6/8kW model). For AGM and Flooded, we recommend Ah baery
No Batt
size x 20%= Charge/Discharge amps.
Activate Battery
Disable Float Charge
. For Lithium, we recommend Ah baery size x 50% = Charge/Discharge amps.
. For Gel, follow manufacturer’ s instrucons.
No Ba: ck this item if no baery is connected to the
system.
Acve baery: This feature will help recover a baery that is over discharged by slowly charging from
the solar array or grid.
Disable Float Charge: For the lithium baery with BMS communicaon, the inverter will keep the
charging voltage at the current voltage when the BMS charging current requested is 0. It is used to help
prevent baery from being overcharged.
Battery Setting
Start
30%
A
40A
Gen Charge
Gen Signal
Gen Force
This is Baery Setup page.
30%
40A Grid Charge
Start =30%: Percent S.O.C at 30% system will AutoStart a connected generator
to charge the baery bank.
Batt
Set2 A = 40A: Charge rate of 40A from the aached generator in Amps.
Grid Signal
Gen Charge: uses the gen input of the system to charge baery bank from an
aached generator.
Gen Signal: Normally open relay that closes when the Gen Start signal state is
acve.
This is Grid Charge, you need select.
Start =30%: No useJust for customizaon.
A = 40A: It indicates the Current that the Grid charges the Baery.
Grid Charge: It indicates that the grid charges the baery. Grid Signal:
Disable.
Gen Force: When the generator is connected, it is forced to start the generator without meeng other condions.
07/08/2021 11:11:10 Thu
This page tells the PV and diesel generator power the load and baery.
0 2.00 7 KW 76%
0 -1.39 5 KW
ON
Signal on
0 0.00 5 KW
0
2.00 KW
5
Generator
Power: 1392W L1: 228V
Freq:50.0Hz
Today=0.0 KWH Total =2.20 KWH
This page tells generator output voltage, frequency, power. And, how much energy is used from generator.
Battery Setting
Lithium Mode Shutdown Low Batt Restart
00 10% 20% 40%
Lithium Mode: This is BMS protocol.Please reference the document(Approved Baery).
Shutdown 10%: It indicates the inverter will shutdown
Batt Set3
if the SOC below this value.
Low Ba 20%: It indicates the inverter will alarm if the SOC below this value.
Restart 40%: Baery voltage at 40% AC output will resume.
Battery Setting
Float V
53.6V
Absorption V
57.6V
Shutdown
20%
Low Batt
35%
Restart
50%
Equalization V 57.6V Equalization Days 30 days
TEMPCO(mV/C/Cell)
-5
Equalization Hours 3.0 IPVST
Batt Resistance 25mOhms
There are 3 stages of charging the Baery .
This is for professional installers, you can keep it
Batt if you do not know.
Set3
Shutdown 20%:The inverter will shutdown if the SOC
below this value.
Low Ba 35%: The inverter will alarm if the SOC below this value.
Restart 50%: Baery SOC at 50% AC output will resume.
Recommended baery sengs
Battery Type
AGM (or PCC) Gel Wet
Lithium
Absorption Stage
Float Stage
Torque value (every 30 days 3hr )
14.2V (57.6V)
13.4V (53.6V)
14.2V (57.6V)
14.1V (56.4V)
13.5V (54.0V)
14.7V (59.0V)
13.7V (55.0V)
14.7V (59.0V)
Follow its BMS voltage parameters
5.7 System Work Mode Setup Menu
System Work Mode
Selling First Zero Export To Load
8000 Max Solar Power
Solar Sell
Work Mode1
Zero Export To CT
Solar Sell
Max Sell Power 8000 Zero-export Power 20
Energy pattern
BattFirst
LoadFirst
Grid Peak Shaving 8000 Power
Work Mode Selling First: This Mode allows hybrid inverter to sell back any
excess power produced by the solar panels to the grid. If me of use is acve,
the baery energy also can be sold into grid. The PV energy will be used to
power the load and charge the baery and then excess energy will flow to grid.
Power source priority for the load is as follows: 1. Solar Panels.
2. Grid.
3. Baeries (unl programable % discharge is reached).
Zero Export To Load: Hybrid inverter will only provide power to the backup load connected. The hybrid inverter will neither provide power to the home load nor sell power to grid. The built-in CT will detect power flowing back to the grid and will reduce the power of the inverter only to supply the local load and charge the baery.
Solar
Backup Load
On-Grid Home Load
Grid
Battery
Zero Export To CT: Hybrid inverter will not only provide power to the backup
load connected but also give power to the home load connected. If PV power and
baery power is insufficient, it will take grid energy as supplement. The
hybrid inverter will not sell power to grid. In this mode, a CT is needed. The
installaon method of the CT please refer to chapter 3.6 CT Connecon. The
external CT will detect power flowing back to the grid and will reduce the
power of the inverter only to supply the local load, charge baery and home
load.
Solar Battery
Backup Load
On-Grid Home Load
Grid CT
Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is acve, the surplus energy can be sold back to grid. When it is acve, PV Power source priority usage is as follows: load consumpon and charge baery and feed into grid. Max. sell power: Allowed the maximum output power to flow to grid Zero-export Power: for zero-export mode, it tells the grid output power. Recommend to set it as 20-100W to ensure the hybrid inverter won’ t feed power to grid. Energy Paern: PV Power source priority. Ba First: PV power is firstly used to charge the baery and then used to power the load. If PV power is insufficient, grid will make supplement for baery and load simultaneously. Load First: PV power is firstly used to power the load and then used to charge the baery. If PV power is insufficient, grid will make supplement for baery and load simultaneously. Max Solar Power: allowed the maximum DC input power Grid Peak-shaving: when it is acve, grid output power will be limited within the set value. If the load power exceeds the allowed value, it will take PV energy and baery as supplement. If sll can’t meet the load requirement, grid power will increase to meet the load needs.
System Work Mode
Grid Charge Gen
Time Of Use Time Power Batt 01:00 5:00 5000 49.0V 05:00 9:00 5000 50.2V 09:00 13:00 5000 50.9V 13:00 17:00 5000 51.4V 17:00 21:00 5000 47.1V 21:00 01:00 5000 49.0V
System Work Mode
Grid Charge Gen
Time Of Use Time Power Batt 01:00 5:00 5000 80% 05:00 8:00 5000 40% 08:00 10:00 5000 40% 10:00 15:00 5000 80% 15:00 18:00 5000 40% 18:00 01:00 5000 35%
Work Mode2
Work Mode2
Time of use: it is used to program when to use grid or generator to charge the
baery, and when to discharge the baery to power the load. Only ck “Time Of
Use” then the follow items (Grid, charge, me, power etc.) will take effect.
Note: when in selling first mode and click me of use, the baery power can be
sold into grid. Grid charge: ulize grid to charge the baery in a me period.
Gen charge: ulize diesel generator to charge the baery in a me period. Time:
real me, range of 01:00-24:00. Power: Max. discharge power of baery allowed.
Ba(V or SOC %): baery SOC % or voltage at when the acon is to happen.
For example: During 01:00-05:00, when baery SOC is lower than 80%, it will use
grid to charge the baery unl baery SOC reaches 80%.
During 05:00-08:00 and 08:00-10:00, when baery SOC is higher than 40%, hybrid
inverter will discharge the baery unl the SOC reaches 40%.
During 10:00-15:00, when baery SOC is higher than 80%, hybrid inverter will
discharge the baery unl the SOC reaches 80%.
During 15:00-18:00, when baery SOC is higher than 40%, hybrid inverter will
discharge the baery unl the SOC reaches 40%.
During 18:00-01:00, when baery SOC is higher than 35%, hybrid inverter will
discharge the baery unl the SOC reaches 35%.
System Work Mode
Mon Tue Wed Thu Fri
Sat Sun
Work Mode4
It allows users to choose which day to execute the seng of “Time of Use”. For example, the inverter will execute the me of use page on Mon/Tue/Wed/Thu/Fri/Sat only.
5.8 Grid Setup Menu
Grid Setting
Unlock Grid Setting
Grid Mode Grid Frequency
Grid Type
General Standard
0/16
50HZ INV Output Voltage
60HZ
240V 220V
230V
Single Phase
200V
Grid Set1
120/240V Split Phase
120/208V 3 Phase
Unlock Grid Seng:before changing the grid parameters, please enable this with
password of 7777. Then it is allowed to change the grid parameters.
Grid Mode: General StandardaUL1741 & IEEE1547a CPUC RULE21aSRD-UL-1741aCEI
0-21aEN50549_CZa Australia_AaAustralia_BaAustralia_CaNewZealanda
VDE4105aOVE_Direcve_R25aEN50549_CZ_PPDS_L16Aa NRS097aG98G99aG98G99_NIaESB
Networks(Ireland). Please follow the local grid code and then choose the
corresponding grid standard.
Grid Setting/Connect
Normal connect: The allowed grid voltage/frequency
Normal connect
Normal Ramp rate 60s
range when the inverter first me connect to the grid. Normal Ramp rate: It is the startup power ramp.
Low frequency 48.00Hz High frequency 51.50Hz Grid Reconnect aer trip: The allowed grid voltage
Low voltage 185.0V High voltage 265.0V Set2 /frequency range for the inverter connects the grid
Reconnect after trip Reconnect Ramp rate 60s
aer the inverter trip from the grid. Reconnect Ramp rate:It is the reconnecon power ramp.
Low frequency 48.20Hz High frequency 51.30Hz
Reconnecon me: The waing me period for the
Low voltage 187.0V
High voltage
263.0V
inverter connects the grid again.
PF: Power factor which is used to adjust inverter
Reconnection Time
60s
PF
1.000
reacve power.
Grid Setting/IP Protection
Over voltage U>(10 min. running mean) 260.0V
HV3 265.0V
HF3 51.50Hz
HV2 265.0V — 0.10s
HF2 51.50Hz — 0.10s
HV1 265.0V — 0.10s
HF1 51.50Hz — 0.10s
LV1 185.0V — 0.10s
LF1 48.00Hz — 0.10s
LV2 185.0V — 0.10s
LF2 48.00Hz — 0.10s
LV3 185.0V
LF3 48.00Hz
HV1: Level 1 overvoltage protecon point;
HV2: Level 2 overvoltage protecon point; 010s–Trip me.
HV3: Level 3 overvoltage protecon point.
Grid
LV1: Level 1 undervoltage protecon point;
Set3
LV2: Level 2 undervoltage protecon point;
LV3: Level 3 undervoltage protecon point.
HF1: Level 1 over frequency protecon point; HF2: Level 2 over frequency protecon point; HF3: Level 3 over frequency protecon point.
LF1: Level 1 under frequency protecon point; LF2: Level 2 under frequency protecon point; LF3: Level 3 under frequency protecon point.
Grid Setting/F(W)
F(W) Over frequency
Droop f
Start freq f
50.20Hz Stop freq f
Start delay f
0.00s
Stop delay f
Under frequency
Start freq f
49.80Hz
Droop f Stop freq f
Start delay f
0.00s
Stop delay f
40%PE/Hz 50.20Hz
0.00s
Grid Set4
40%PE/Hz 49.80Hz
0.00s
FW: this series inverter is able to adjust inverter output power according to grid frequency. Droop f: percentage of nominal power per Hz For example, “Start freq f50.2Hz, Stop freq f50.2, Droop f=40%PE/Hz” when the grid frequency reaches 50.2Hz, the inverter will decrease its acve power at Droop f of 40%. And then when grid system frequency is less than 50.2Hz, the inverter will stop decreasing output power. For the detailed setup values, please follow the local grid code.
Grid Setting/V(W) V(Q)
V(W)
V1 109.0% P1 100% V2 110.0% P2 20% V3 111.0% P3 20% V4 111.0% P4 20%
V(Q)
Lock-in/Pn 5%
Lock-out/Pn 20%
Grid Set5
V1 90.0%
Q1 44%
V2 95.7%
Q2 0%
V3 104.3% Q3 0%
V4 112.2% Q4 -60%
V(W): It is used to adjust the inverter acve power according to the set grid voltage. V(Q): It is used to adjust the inverter reacve power according to the set grid voltage. This funcon is used to adjust inverter output power (acve power and reacve power) when grid voltage changes. Lock-in/Pn 5%: When the inverter acve power is less than 5% rated power, the VQ mode will not take effect. Lock-out/Pn 20%: If the inverter acve power is increasing from 5% to 20% rated power, the VQ mode will take effect again.
For example: V2=110%, P2=20%. When the grid voltage reaches the 110% mes of rated grid voltage, inverter output power will reduce its acve output power to 20% rated power. For example: V1=90%, Q1=44%. When the grid voltage reaches the 90% mes of rated grid voltage, inverter output power will output 44% reacve output power. For the detailed setup values, please follow the local grid code.
Grid Setting/P(Q) P(F)
P(Q)
P1 0% P2 0% P3 0% P4 0%
Q1 0% Q2 0% Q3 0% Q4 0%
P(PF)
Lock-in/Pn 50%
Lock-out/Pn 50%
Grid Set6
P1 0%
PF1 -2.400
P2 0%
PF2 0.000
P3 0%
PF3 0.000
P4 0%
PF4 6.000
P(Q): It is used to adjust the inverter reacve power according to the set acve power. P(PF): It is used to adjust the inverter PF according to the set acve power. For the detailed setup values, please follow the local grid code. Lock- in/Pn 50%: When the inverter output acve power is less then 50% rated power, it won’t enter the P(PF) mode. Lock-out/Pn 50%: When the inverter output acve power is higher then 50% rated power, it will enter the P(PF) mode. Note : only when the grid voltage is equal to or higher than 1.05mes of rated grid voltage, then the P(PF) mode will take effect.
Grid Setting/LVRT
L/HVR
HV1 115%
Reserved: This funcon is reserved.It is not recommended.
Grid Set7
LV1 50%
5.9 Generator Port Use Setup Menu
GEN PORT USE
Mode Generator Input
Rated Power
8000W
AC couple on grid side AC couple on load side GEN connect to Grid input
SmartLoad Output
On Grid always on
Power AC Couple Fre High
500W
52.00Hz
Micro Inv Input ON 100% OFF 95%
PORT Set1
Generator input rated power: allowed Max. power from diesel generator. GEN connect to grid input: connect the diesel generator to the grid input port. Smart Load Output: This mode ulizes the Gen input connecon as an output which only receives power when the baery SOC and PV power is above a user programmable threshold. e.g. Power=500W, ON: 100%, OFF=95%: When the PV power exceeds 500W, and baery bank SOC reaches 100%, Smart Load Port will switch on automacally and power the load connected. When the baery bank SOC < 95% or PV power < 500w, the Smart Load Port will switch off automacally.
Smart Load OFF Ba · Baery SOC at which the Smart load will switch off. Smart
Load ON Ba · Baery SOC at which the Smart load will switch on. Also, the PV
input power should exceed the seng value (Power)
simultaneously and then the Smart load will switch on. On Grid always on: When
click “on Grid always on” the smart load will switch on when the grid is
present. Micro Inv Input: To use the Generator input port as a micro-inverter
on grid inverter input (AC coupled), this feature will also work with “Grid-
Tied” inverters.
Micro Inv Input OFF: when the baery SOC exceeds seng value, Microinveter or
grid-ed inverter will shut down. Micro Inv Input ON: when the baery SOC is
lower than seng value, Microinveter or grid-ed inverter will start to work. AC
Couple Fre High: If choosing”Micro Inv input”, as the baery SOC reaches
gradually seng value (OFF), During the process, the microinverter output power
will decrease linear. When the baery SOC equals to the seng value (OFF), the
system frequency will become the seng value (AC couple Fre high) and the
Microinverter will stop working. Stop exporng power produced by the
microinverter to the grid. Note: Micro Inv Input OFF and On is valid for some
certain FW version only. AC couple on load side: connecng the output of on-
grid inverter at the load port of the hybrid inverter. In this
situaon, the hybrid inverter will not able to show the load power correctly.
AC couple on grid side: this funcon is reserved. Note: Some firmware versions
don’t have this funcon.
5.10 Advanced Funcon Setup Menu
Advanced Function
Solar Arc Fault ON Clear Arc_Fault
System selfcheck
Backup Delay 0ms
Gen peak-shaving
Func Set1
DRM Signal ISLAND MODE
CT Ratio 20001
BMS_Err_Stop
CEI 0-21 Report
*OWFSUFS
MPBEQPSU
– / “54
7
TIFMM (SPVOEDBCMF
FYUFSOBMSFMBZ
DPJM DPPOQUFBODU
Solar Arc Fault ON:This is only for US. System selfcheck: Disable. this is
only for factory. Gen Peak-shaving: Enable When the power of the generator
exceeds the rated value of it, the inverter will provide the redundant part to
ensure that the generator will not overload. DRM: For AS4777 standard. Backup
Delay: When the grid cuts off, the inverter will give output power aer the
seng me. For example, backup delay: 3ms. the inverter will give output power
aer 3ms when the grid cuts off. Note: for some old FW version, the funcon is
not available BMS_Err_Stop: When it is acve, if the baery BMS failed to
communicate with inverter, the inverter will stop working and report fault.
Signal ISLAND MODE: when “signal island mode” is checked and the inverter
connects the grid, the ATS port voltage will be 0. When “signal island mode”
is checked and the inverter disconnected from the grid, the ATS port voltage
will output 230Vac voltage. With this feature and outside NO type relay, it
can realize N and PE disconnecon
or bond.
More details, please refer to le side picture.
Advanced Function
DC 1 for WindTurbine
DC 2 for WindTurbine
V1
90V
0.0A
V7
210V
9.0A
V2
110V
1.5A
V8
230V
10.5A
V3
130V
3.0A
V9
250V
12.0A
V4
150V
4.5A
V10 270V
13.5A
V5
170V
6.0A
V11
290V
15.0A
V6
190V
7.5A
V12 310V
16.5A
5IJTJTGPS8JOE5VSCJOF *”
Wind
Set2
67
Advanced Function
Parallel Master Slave
Modbus SN 00
A Phase B Phase C Phase
Ex_Meter For CT A Phase B Phase C Phase
Meter Select
CHNT-3P
0/4
CHNT-1P Eastron-3P Eastron-1P
Grid Side INV Meter2
Ex_Meter For CT: when in Three phase system with CHNT Three phase energy meter (DTSU666), click corresponding phase where hybrid inverter is connected. e.g. when the hybrid inverter output connects to A phase, please click A Paral. Phase. Set3 Meter Select: select the corresponding meter type according to the meter installed in the system. Grid Side INV Meter2: when there’s a string inverter AC couple at the grid or load side of hybrid inverter and there’s a meter installed for the string inverter, then the hybrid inverter LCD will show the string inverter output power on its PV icon. Please make sure the meter can communicate with the hybrid inverter successfully.
0O-PBE”$DPVQMF
On-Grid Inverter
AC cable DC cable
0O(SJE”$DPVQMF
AC cable DC cable
Solar
Battery
Smart Load
%%46%/3″-.&5&3
7
“JNQL8I
Meter
Backup Load
On-Grid Home Load
CT
Grid
Solar
Battery
Smart Load
Backup Load
On-Grid Inverter
On-Grid Home Load
%%46%/3″-.&5&3
7
“JNQL8I
Meter
CT
Grid
Advanced Function
ATS ON
Low Noise Mode Low Power Mode<Low Batt
ATS: It is related with ATS port voltage. it is beer in “uncheck” posion.
Low Noise Mode: In this mode, inverter will work in
Func Set4
“low noise mode”.
Low Power Mode<Low Ba: if selected and when baery SOC is less then “Low Bat” value, the self-consumpon power of inverter will be from grid and baery simultaneously. If unselected, the self-consumpon power of inverter will be mainly from grid.
5.11 Device Info Setup Menu
LDie-BvMiceSInfo.
Volt
HMCIu:rrVerT0eI3nm0vp2erteSrOICD:
1E6n0e1rg0y1200C1harge FFlaauslth MAIN:VeVr o0lt-52C1u3r-r0717
1 2
55A00..33la83rVVm11s99..17C00oAAde3310..06CC
52.0% 51.0%
2256..50AAOhh cc50u3.0.r2VrVed205.0.0AA
0|0|0 0|0|0
3 F5604.30HVe1a6t.s9i0nAk_H30i.g2ChTe1m2.p0%_Fau6.l0tAh201593.-20V3-1251.0A150:5|06|0
4 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
5 F06.400VHe0a.t0s0iAnk_H0.0igChTe0m.0p%_Fau0.l0tAh20109.0-V03-00.80A
100:|406|0
DSeuvmice DInaftoa
6 F06.040VHe0a.t0s0iAnk_H0.0igChTe0m.0p%_Fau0.l0tAh20109.0-V03-00.80A
100:|405|0
7 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
8 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
9 0.00V 0.00A 0.0C 10 0.00V 0.00A 0.0C
0.0% 0.0%
0.0Ah 0.0V 0.0A 0|0|0
0.0Ah 0.0V 0.0A 0|0|0 Details
11 0.00V 0.00A 0.0C 12 0.00V 0.00A 0.0C
0.0% 0.0%
0.0Ah 0.0V 0.0A 0|0|0 Data
0.0Ah 0.0V 0.0A 0|0|0
13 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
14 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
15 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
This page show Inverter ID, Inverter version and alarm codes.
HMI: LCD version MAIN: Control board FW version
6. Mode
Mode I:Basic
AC cable DC cable COM cable
Solar
Backup Load On-Grid Home Load
Battery
Mode II: With Generator
CT Grid
AC cable DC cable
Solar
Backup Load
On-Grid Home Load
Battery
Mode III: With Smart-Load
Grid CT Generator
AC cable DC cable
Solar
Backup Load
On-Grid Home Load
Battery
Mode IV: AC Couple
0O(FO”$DPVQMF
CT
Grid
Smart Load
AC cable DC cable
Solar Battery
On-Grid Home Load
CT
Grid
Backup Load
On-Grid Inverter
0O-PBE”$DPVQMF
AC cable DC cable
Solar
Battery
Smart Load
0O(SJE”$DPVQMF
On-Grid Inverter Backup Load
On-Grid Home Load
CT
Grid
AC cable DC cable
Backup Load
Solar Battery
Smart Load
On-Grid Inverter On-Grid Home Load
CT
Grid
The 1st priority power of the system is always the PV power, then 2nd and 3rd
priority power will be the baery bank or grid according to the sengs. The last
power backup will be the Generator if it is available.
7. Fault informaon and processing
The energy storage inverter is designed according to the grid-connected
operaon standard and meets the safety requirements and electromagnec
compability requirements. Before leaving the factory, the inverter undergoes
several rigorous tests to ensure that the inverter can operate reliably.
If any of the fault messages listed in Table 7-1 appear on your inverter and
the fault has not been removed aer restarng, please contact your local dealer
or service center. You need to have the following informaon ready.
1. Inverter serial number; 2. Distributor or service center of the inverter ;
3. On-grid power generaon date; 4. The problem descripon (including the fault
code and indicator status displayed on the LCD)
is as detailed as possible. 5. Your contact informaon.In order to give you a
clearer understanding of the inverter’s fault
informaon, we will list all possible fault codes and their descripons when the
inverter is not working properly.
Error code
Description
Solutions
8IFOJOWFSUFSJTJO4QMJUQIBTF 7BD
PSUISFFQIBTF
‘
(‘%*@3FMBZ@’BJMVSF
TZTUFN 7BD
TZTUFN
UIFCBDLVQMPBEQPSU/MJOF
OFFETUPDPOOFDUHSPVOE
*GUIFGBVMUTUJMMFYJTUT
QMFBTFDPOUBDUVTGPSIFMQ
8IFOUIFHSJEUZQFBOEGSFRVFODZDIBOHFEJUXJMMSFQPSU’
8IFOUIFCBUUFSZNPEFXBTDIBOHFEUPo/PCBUUFSZpNPEF
JUXJMMSFQPSU’
‘PSTPNFPME’8WFSTJPO
JUXJMMSFQPSU’XIFOUIFTZTUFN
‘
8PSLJOHNPEFDIBOHF XPSLNPEFDIBOHFE
(FOFSBMMZ
JUXJMMEJTBQQFBSBVUPNBUJDBMMZXIFOTIPXT’
*GTUJMMTBNF
BOEUVSOPGGUIF%$TXJUDIBOE”$TXJUDIBOE
XBJUGPSPOFNJOVUFBOEUIFOUVSOPOUIF%$”$TXJUDI
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
“$TJEFPWFSDVSSFOUGBVMU
‘
“$PWFSDVSSFOUGBVMU PGIBSEXBSF
1MFBTFDIFDLXIFUIFSUIFCBDLVQMPBEQPXFSBOEDPNNPO MPBEQPXFSBSFXJUIJOUIFSBOHF 3FTUBSUBOEDIFDLXIFUIFSJUJTJOOPSNBM
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
%$TJEFPWFSDVSSFOUGBVMU
$IFDL17NPEVMFDPOOFDUBOECBUUFSZDPOOFDU
‘
%$PWFSDVSSFOUGBVMUPG UIFIBSEXBSF
8IFOJOUIFPGGHSJENPEF
UIFJOWFSUFSTUBSUVQXJUICJHQPXFS MPBE
JUNBZSFQPSU’1MFBTFSFEVDFUIFMPBEQPXFSDPOOFDUFE
5VSOPGGUIF%$TXJUDIBOE”$TXJUDIBOEUIFOXBJUPOF
NJOVUF
UIFOUVSOPOUIF%$”$TXJUDIBHBJO
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
‘
5[@&NFSH4UPQ@’BVMU 1MFBTFDPOUBDUZPVSJOTUBMMFSGPSIFMQ
-FBLBHFDVSSFOUGBVMU
‘
“$MFBLBHFDVSSFOUJT USBOTJFOUPWFSDVSSFOU
$IFDL17TJEFDBCMFHSPVOEDPOOFDUJPO 3FTUBSUUIFTZTUFN_UJNFT
*GUIFGBVMUTUJMMFYJTUT
QMFBTFDPOUBDUVTGPSIFMQ
17JTPMBUJPOSFTJTUBODFJTUPPMPX
‘
%$JOTVMBUJPOJNQFEBODF GBJMVSF
$IFDLUIFDPOOFDUJPOPG17QBOFMTBOEJOWFSUFSJTGJSNMZBOE DPSSFDUMZ $IFDLXIFUIFSUIF1&DBCMFPGJOWFSUFSJTDPOOFDUFEUPHSPVOE
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
1MFBTFXBJUGPSBXIJMFBOEDIFDLXIFUIFSJUJTOPSNBM
‘
5IF%$CVTCBSJT VOCBMBODFE
8IFOUIFIZCSJEJOTQMJUQIBTFNPEF
BOEUIFMPBEPG-BOE MPBEPG-JTCJHEJGGFSFOU
JUXJMMSFQPSUUIF’ 3FTUBSUUIFTZTUFN_UJNFT
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
8IFOJOQBSBMMFMNPEF
DIFDLUIFQBSBMMFMDPNNVOJDBUJPODBCMF
DPOOFDUJPOBOEIZCSJEJOWFSUFSDPNNVOJDBUJPOBEESFTTTFUUJOH
‘
1BSBMMFM$”/#VTGBVMU %VSJOHUIFQBSBMMFMTZTUFNTUBSUVQQFSJPE
JOWFSUFSTXJMMSFQPSU’
XIFOBMMJOWFSUFSTBSFJO0/TUBUVT
JUXJMMEJTBQQFBSBVUPNBUJDBMMZ
*GUIFGBVMUTUJMMFYJTUT
QMFBTFDPOUBDUVTGPSIFMQ
Error code ‘
Description “$0WFSDVSSFOUGBVMU
Solutions $IFDLUIFCBDLVQMPBEDPOOFDUFE
NBLFTVSFJUJTJOBMMPXFE QPXFSSBOHF *GUIFGBVMUTUJMMFYJTUT
QMFBTFDPOUBDUVTGPSIFMQ
/P6UJMJUZ
1MFBTFDPOGJSNHSJEJTMPTUPSOPU
‘
/P”$HSJE
$IFDLUIFHSJEDPOOFDUJPOJTHPPEPSOPU
$IFDLUIFTXJUDICFUXFFOJOWFSUFSBOEHSJEJTPOPSOPU
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
$IFDLUIFIZCSJEJOWFSUFSXPSLJOHTUBUVT*GUIFSFTQDT
‘
1BSBMMFMTZTUFNTUPQ
IZCSJEJOWFSUFSJTJO0”TUBUVT
UIFPUIFSIZCSJEJOWFSUFST NBZSFQPSU’GBVMUJOQBSBMMFMTZTUFN
*GUIFGBVMUTUJMMFYJTUT
QMFBTFDPOUBDUVTGPSIFMQ
(SJEWPMUBHFGBVMU
$IFDLUIF”$WPMUBHFJTJOUIFSBOHFPGTUBOEBSEWPMUBHFJO
‘
“$MJOFMPXWPMUBHF
TQFDJGJDBUJPO $IFDLXIFUIFSHSJE”$DBCMFTBSFGJSNMZBOEDPSSFDUMZ
DPOOFDUFE
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
(SJEGSFRVFODZPVUPGSBOHF
‘
“$PWFSGSFRVFODZ
$IFDLUIFGSFRVFODZJTJOUIFSBOHFPGTQFDJGJDBUJPOPSOPU $IFDLXIFUIFS”$DBCMFTBSFGJSNMZBOEDPSSFDUMZDPOOFDUFE
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
(SJEGSFRVFODZPVUPGSBOHF
‘
“$MPXFSGSFRVFODZ
$IFDLUIFGSFRVFODZJTJOUIFSBOHFPGTQFDJGJDBUJPOPSOPU $IFDLXIFUIFS”$DBCMFTBSFGJSNMZBOEDPSSFDUMZDPOOFDUFE
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
BUUFSZWPMUBHFMPX
‘
%$CVTCBSWPMUBHFJT UPPMPX
$IFDLXIFUIFSCBUUFSZWPMUBHFJTUPPMPX *GUIFCBUUFSZWPMUBHFJTUPPMPX
VTJOH17PSHSJEUPDIBSHFUIF CBUUFSZ
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
JUUFMMTUIFDPNNVOJDBUJPOCFUXFFOIZCSJEJOWFSUFSBOECBUUFSZ
.4EJTDPOOFDUFEXIFO#.4@&SS4UPQJTBDUJWF
‘
.4DPNNVOJDBUJPOGBVMU JGEPOnUXBOUUPTFFUIJTIBQQFO
ZPVDBOEJTBCMF
.4@&SS4UPQJUFNPOUIF-$%
*GUIFGBVMUTUJMMFYJTUT
QMFBTFDPOUBDUVTGPSIFMQ
“3$GBVMUEFUFDUJPOJTPOMZGPS64NBSLFU
‘
“3$GBVMU
$IFDL17NPEVMFDBCMFDPOOFDUJPOBOEDMFBSUIFGBVMU
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
)FBUTJOLUFNQFSBUVSFJTUPPIJHI
‘
)FBUTJOLIJHIUFNQFSBUVSF $IFDLXIFUIFSUIFXPSLFOWJSPONFOUUFNQFSBUVSFJTUPPIJHI
GBJMVSF
5VSOPGGUIFJOWFSUFSGPSNJOTBOESFTUBSU
4FFLIFMQGSPNVT
JGDBOOPUHPCBDLUPOPSNBMTUBUF
Chart 7-1 Fault informaon
Under the guidance of our company, customers return our products so that our
company can provide service of maintenance or replacement of products of the
same value. Customers need to pay the necessary freight and other related
costs. Any replacement or repair of the product will cover the remaining
warranty period of the product. If any part of the product or product is
replaced by the company itself during the warranty period, all rights and
interests of the replacement product or component belong to the company.
Factory warranty does not include damage due to the following reasons: ·
Damage during transportaon of equipment · Damage caused by incorrect
installaon or commissioning · Damage caused by failure to comply with operaon
instrucons, installaon instrucons or maintenance instrucons · Damage caused by
aempts to modify, alter or repair products · Damage caused by incorrect use or
operaon · Damage caused by insufficient venlaon of equipment · Damage caused
by failure to comply with applicable safety standards or regulaons · Damage
caused by natural disasters or force majeure (e.g. floods, lightning,
overvoltage, storms, fires, etc.) In addion, normal wear or any other failure
will not affect the basic operaon of the product. Any external scratches,
stains or natural mechanical wear does not represent a defect in the product.
8.Limitaon of Liability
In addion to the product warranty described above, the state and local laws
and regulaons provide financial compensaon for the product’s power connecon
(including violaon of implied terms and warranes). The company hereby declares
that the terms and condions of the product and the policy cannot and can only
legally exclude all liability within a limited scope.
9. Datasheet
Model Battery Input Date
SUN-5K-SG01LP1 SUN-6K-SG01LP1 SUN-7.6K-SG01LP1 SUN-8K-SG01LP1
-US
-US
-US/EU
-US/EU
Baery Type
Lead-acid or Li-Ion
Baery Voltage Range(V)
40-60
Max. Charging Current(A)
120
135
190
190
Max. Discharging Current(A)
120
135
190
190
Charging Curve
3 Stages / Equalizaon
External Temperature Sensor
yes
Charging Strategy for Li-Ion Baery
Self-adapon to BMS
PV String Input Data Max. DC Input Power(W) PV Input Voltage(V) MPPT Range(V) Start-up Voltage(V)
6500
7800
9880
370(125-500)
150-425
125
10400
PV Input Current(A)
13+13
26+13
26+26
26+26
Max.PV Isc(A) No. of MPPT Trackers
22+22
44+22
44+44 2
44+44
No. of Strings Per MPPT Tracker
1+1
2+1
2+2
2+2
AC Output Data Rated AC Output and UPS Power(W) 5000
6000
7600
8000
Max. AC Output Power(W)
5500
6600
8360
8800
Peak Power(off grid)
2 mes of rated power, 10 S
AC Output Rated Current(A) Max. AC Current(A) Max. Connuous AC Passthrough(A) Power Factor
20.8/24 22.9/26.4
25/28.8 31.7/36.5 34.5/33 33.3/38.536.4/34.8 27.5/31.7 34.8/40.2 38/36.3
36.7/42.3 40/38.3
50 0.8 leading to 0.8 lagging
Output Frequency and Voltage
50 / 60Hz; 120 / 240Vac (split phase), 208Vac (2 / 3 phase), 220/230Vac (single phase)
Grid Type
Split phase; 2 / 3 phase; Single Phase
Total Harmonic Distoron (THD) DC current injecon
<3% (of nominal power) <0.5% ln
Efficiency Max. Efficiency
97.60%
Euro Efficiency
97.00%
MPPT Efficiency Protection
99%
PV Arc Fault Detecon
Integrated
PV Input Lightning Protecon
Integrated
An-islanding Protecon
Integrated
PV String Input Reverse Polarity Protecon
Integrated
Insulaon Resistor Detecon
Integrated
Residual Current Monitoring Unit
Integrated
Output Over Current Protecon
Integrated
Output Shorted Protecon
Integrated
Surge Protecon Over Voltage Category
DC Type II / AC Type II DC Type II / AC Type III
Model Certifications and Standards
SUN-5K-SG01LP1 SUN-6K-SG01LP1 SUN-7.6K-SG01LP1 SUN-8K-SG01LP1
-US
-US
-US/EU
-US/EU
Grid Regulaon
EN 50549,UNE 217002,NRS 097,IEEE 1547.1,SRD V2.0
EMC / Safety Regulaon
General Data Operang Temperature Range(¥) Cooling Noise(dB) Communicaon with
BMS Weight(kg) Cabinet size(mm) Protecon Degree
Installaon Style Warranty
IEC/EN 61000-6-1/2/3/4, IEC/EN 62109-1, IEC/EN 62109-2, FCC,UL 1741
-40 to +60¥, >45¥ Derang Smart cooling <30 dB RS485; CAN 32
420W×670H×233D (Excluding connectors and brackets) IP65
Wall-mounted 5 years
10. Appendix I
Definion of RJ45 Port Pin for BMS
/P
341JO
34
.FUFS@$0/
(/%
(/%
34”
34#
RS485 Port
$”/1JO
(/%
$”/) $”/-
CAN Port
Meter_CON port 5IJTQPSUJTVTFEUPDPOOFDUUIFFOFSHZNFUFS Note: some hardware versions hybrid inverter don’t support conencng the energy meter
RS232
/P
8’34 59 39
%(/%
7ED
8’34
This RS232 port is used to connect the wifi datalogger
11. Appendix II
1. Split Core Current Transformer (CT) dimension: (mm) 2. Secondary output
cable length is 4m.
Lead Outside
Ver: 2.2, 2023-09-17
“EE/P4PVUI:POH+JBOH3PBE
%BRJ
FJMVO
/JOH#P
$IJOB 5FM
‘BY
&NBJMTFSWJDF!EFZFDPNDO 8FCXXXEFZFJOWFSUFSDPN
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>