CHIEF LG2 Series LED Wall Mounts Instruction Manual
- June 15, 2024
- Chief
Table of Contents
LG2 Series LED Wall Mounts
Product Information
Specifications
-
Models: TILD1X4LG2-L, TILD1X5LG2-M, TILD1X4LG2-M, TILD1X3LG2-L,
TILD1X5LG2-L, TILD1X5LG2-R, TILD1X4LG2-R, TILD1X3LG2-M,
TILD1X3LG2-R, TILVAB2 -
Mounting System: LED Wall Mounts
-
Accessory: TILVAB2
Product Usage Instructions
Installation
Follow the steps below to properly install the LED wall
mounts:
-
Identify the appropriate model for your application.
-
Ensure that the mounting system is not damaged. If it is
damaged, do not use it and return it to a service center for
examination and repair. -
Use the provided tools (small level, 7/32, 3/8, 1/2 drill bits)
for installation. -
Choose a suitable location for mounting the LED wall
mounts. -
Drill holes according to the instructions for your specific
model. Refer to the legend for drilling instructions in different
languages. -
Attach the LED wall mounts securely to the wall using
appropriate screws or bolts. -
Adjust the position of the wall mounts as needed.
-
If using the TILVAB2 accessory, follow the additional
installation instructions provided.
Product Safety
Ensure safety while using the LED wall mounts by following these
important instructions:
-
Read and thoroughly understand all instructions before
installation. -
Use the mounting system only for its intended use as described
in the instructions. -
Do not use attachments that are not recommended by the
manufacturer. -
Never operate the mounting system if it is damaged. Return it
to a service center for examination and repair. -
Do not use the mounting system outdoors.
FAQ
Q: Can I attach any type of panels to the LED wall mounts?
A: No, the LED wall mounts are designed for use with LED panels
only. Do not attach panels that exceed 20 lbs (9.07 kg) regardless
of their size or design.
Q: What should I do if I encounter any issues during
installation?
A: If you encounter any issues during installation, refer to the
troubleshooting section in the user manual or contact our customer
support for assistance.
Q: Can I use the LED wall mounts outdoors?
A: No, the LED wall mounts are not designed for outdoor use.
Using them outdoors may result in damage to the product.
INSTALLATION INSTRUCTIONS
(Standard three-upright configuration shown for each model. Configuration will
vary based on application)
TILD1X4LG2-L
TILD1X5LG2-M
TILD1X4LG2-M
TILD1X3LG2-L
TILD1X5LG2-L
TILD1X5LG2-R TILD1X4LG2-R
TILD1X3LG2-M TILD1X3LG2-R
TILVAB2 Accessory
LG2 Series LED Wall Mounts / Accessory
Spanish Product Description German Product Description Portuguese Product
Description
Italian Product Description Dutch Product Description French Product
Description
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Installation Instructions
DISCLAIMER
Legrand | AV and its affiliated corporations and subsidiaries (collectively
“Legrand | AV”), intend to make this manual accurate and complete. However,
Legrand | AV makes no claim that the information contained herein covers all
details, conditions or variations, nor does it provide for every possible
contingency in connection with the installation or use of this product. The
information contained in this document is subject to change without notice or
obligation of any kind. Legrand | AV makes no representation of warranty,
expressed or implied, regarding the information contained herein. Legrand | AV
assumes no responsibility for accuracy, completeness or sufficiency of the
information contained in this document.
Chief® is a registered trademark of Legrand AV Inc.
DEFINITIONS
MOUNTING SYSTEM: A MOUNTING SYSTEM is the
primary Chief product to which an accessory and/or component is attached.
ACCESSORY: AN ACCESSORY is the secondary Chief
product which is attached to a primary Chief product, and may have a component
attached or setting on it.
COMPONENT: A COMPONENT is an audiovisual item
designed to be attached or resting on an accessory or mounting system such as
a video camera, CPU, screen, display, projector, etc.
WARNING: The TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 LED wall mounts are designed
for use with LED panels only. Exceeding the weight capacity (listed) can
result in serious personal injury or damage to equipment! Do NOT attach LED
panels to TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 LED video wall mounts that
exceed 20 lbs (9.07 kg) regardless of the size or design of the configuration.
See figure below for examples.
TILD1X3LG2 (example)
TILD1X4LG2 (example)
ONE LED PANEL 20 lbs (9.07 kg) maximum
WARNING: A WARNING alerts you to the possibility of serious injury or death if you do not follow the instructions.
CAUTION: A CAUTION alerts you to the possibility of damage or destruction of
equipment if you do not follow the
corresponding instructions.
ONE LED PANEL 20 lbs (9.07 kg) maximum
IMPORTANT SAFETY INSTRUCTIONS
WARNING: Failure to read, thoroughly understand, and follow all instructions
can result in serious personal injury, damage to equipment, or voiding of
factory warranty! It is the installer’s responsibility to make sure all
mounting systems are properly assembled and installed using the instructions
provided.
WARNING: Use this mounting system only for its intended use as described in
these instructions. Do not use attachments not recommended by the
manufacturer.
WARNING: Never operate this mounting system if it is damaged. Return the
mounting system to a service center for examination and repair.
WARNING: Failure to provide adequate structural strength for this mounting
system can result in serious personal injury or damage to equipment! It is the
installer’s responsibility to make sure the structure to which this mounting
system is attached can support five times the combined weight of all
equipment. Reinforce the structure as required before installing the mounting
system. The wall to which the mounting system is being attached may have a
maximum drywall thickness of 5/8″ (1.6cm). Do not install drywall anchors into
the seam between drywall pieces.
2
WARNING: Do not use this mounting system outdoors.
IMPORTANT ! : The TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 LED wall mounts are
designed to be mounted to:
· a bare 8″ concrete or 8″x8″x16″ concrete block wall; or · a 3/4″ thickness
plywood-backed, 2″ x 4″ wood studs
(16″ on center minimum) wall with a maximum drywall thickness of 5/8″; or · a
3/4″ thickness plywood-backed, steel stud wall covered with drywall having a
maximum thickness of 5/8″.
–SAVE THESE INSTRUCTIONS–
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
LEGEND
Tighten Fastener Apretar elemento de fijación Befestigungsteil festziehen
Apertar fixador Serrare il fissaggio Bevestiging vastdraaien Serrez les
fixations
Loosen Fastener Aflojar elemento de fijación Befestigungsteil lösen Desapertar
fixador Allentare il fissaggio Bevestiging losdraaien Desserrez les fixations
Phillips Screwdriver Destornillador Phillips Kreuzschlitzschraubendreher Chave
de fendas Phillips Cacciavite a stella Kruiskopschroevendraaier Tournevis à
pointe cruciforme
Open-Ended Wrench Llave de boca Gabelschlüssel Chave de bocas Chiave a punte
aperte Steeksleutel Clé à fourche
By Hand A mano Von Hand Com a mão A mano Met de hand À la main
Hex-Head Wrench Llave de cabeza hexagonal Sechskantschlüssel Chave de cabeça
sextavada Chiave esagonale Zeskantsleutel Clé à tête hexagonale
3
Installation Instructions
Pencil Mark Marcar con lápiz Stiftmarkierung Marcar com lápis Segno a matita
Potloodmerkteken Marquage au crayon
Drill Hole Perforar Bohrloch Fazer furo Praticare un foro Gat boren Percez un
trou
Adjust Ajustar Einstellen Ajustar Regolare Afstellen Ajuster
Remove Quitar Entfernen Remover Rimuovere Verwijderen Retirez
Optional Opcional Optional Opcional Opzionale Optie En option
Security Wrench Llave de seguridad Sicherheitsschlüssel Chave de segurança
Chiave di sicurezza Veiligheidssleutel Clé de sécurité
Installation Instructions
TOOLS REQUIRED FOR INSTALLATION
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
[Small level]
7/32″ 3/8″ 1/2″
[Laser level]
String M3
2
PARTS
3/4″ deep well socket
Ratchet or T-handle for use with deep well socket
Mounting Hardware Kit (Qty per bag) TiLDUS Hardware Kit (Qty per bag)
Level [4+ ft. long]
A – Left (1)
or B – Right (1)
[Adjustment washers]
C (2) [UX10x60R anchor]
F (10) #10 x 1/2″
G (4) #10-24 x 1″
D (2) 5/16 x 2-1/2″
H (1) #10 x 2 1/2″
E (2) 5/16″
TILVABPT Vertical Connector Kit [Sold separately]
J (8) 1/4-20 x 1/2″
K (2) [Vertical connector]
Spacer Plate Kit (Qty per bag) (not included w/TILD1xXLG2-R)
P (1) [Spacer plate]
Q (4) #10-24 x 1/2″
L (1)
[Left upright TILD1X3LG2-L-shown]
M (1) [Middle upright
–
TILD1X3LG2-M shown]
N (1) [Right upright –
TILD1X3LG2-R-shown]
4
Installation Instructions
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
INSTALLATION
Preinstallation IMPORTANT ! : Reference the LED screen installation manual for
specific instructions regarding care, handling, cabling and installation of
the LED screens.
CAUTION: Handle the LED screens with care, being careful to not impact or drop
the LED screen.
CAUTION: There is a magnetic surface on the front of the LED screen. To
prevent damage ensure that no metallic object is pulled onto the LED screen.
NOTE: When planning the installation, remember the requirement to run power
and signal to the video wall.
Site Assessment
Before beginning any installation the site should be assessed in several areas
to help avoid any issues during the actual installation.
· Wall Structure – It is recommended that a 3/4″ furniture-grade plywood-
backed wall be used in most LED video walls. The use of a wood stud wall is
not appropriate since the studs won’t be in the proper location for an LED
video wall.
· Wall High/Low Points – Locate any high or low points on the wall that may
cause problems, and try to set up install so that these points can be avoided,
if possible.
· Flatness/Plumb of Wall – Learn how much depth adjustment will be needed
across the LED video wall mounting area.
· Power/Cable – Locate all power outlets and cable access holes that need to
be cleared by the installation. Plan appropriately for those holes.
· Installing in a Recess – Verify the level and squareness of the recessed
area. Since these areas are rarely perfect you may need to decide what to use
as a reference point. · The recess top or bottom may not be level so the video
wall may need to be installed to align with the recess, rather than being
level with the wall. · If the recess is not square the sides may make the
recess look crooked. If possible, the recess should be fixed. If repairing the
recess isn’t an option it may be best to “split the difference” between the
recess sides to make the video wall appear level.
· Where to Begin the Video Wall – The installer should make the decision
whether the video wall will be started at the top, bottom, left, right or
center. · If a lower bottom reference is given in the specifications, it may
make sense to start at the bottom of the video wall to ensure that this
specification is met from the start of installation. · If building inside of a
recess, it may be easier to start in the center of the space since the video
wall will most likely need to be centered within the recess.
· Vertical Connector Brackets – If creating a video wall with more than a
single row, you will be using the vertical connectors which are sold
separately. · Vertical Connector Brackets [sold separately] If the video wall
requires multiple rows, decide on whether the installation will start with the
top or
bottom row. This determines to which end (top or bottom) the vertical
connector brackets are attached.
Just a tip – For larger LED walls it is helpful to
check placement and alignment of the mounts by putting a few cabinets without
the LED’s in place in the bottom row of the installed mounts (referencing the
LED screen installation manual for specific instructions) during the mount
installation, verifying that everything is staying aligned and level, and then
continuing the mount installation.
Just a tip – The horizontal slots located along
the vertical mount pieces (and vertical slots located along the horizontal
mount pieces) are the center-of-screen indicators to illustrate where the
center of each LED screen will be located, and can be used to hold a tape
measure tab while measuring. (See Figure 1)
[TILD1X3LG2 shown as example]
Center of screen indicators
Tape
Measure
= Center-of-screen indicators = Slots to hold tape measure blade
Figure 1
5
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Installation Instructions
Connecting Mounting Uprights
1. Use eight 10-24 x 1/2″ flathead Phillips screws (Q) to secure two spacer
plates (P) to mounting uprights (L and M or M and M). (See Figure 2) or (See
Figure 3)
IMPORTANT ! : If installing from left to right, first attach left upright (L)
to middle upright (M). If installing from the middle out, first attach two
middle uprights (M) to each other.
(TILD1X3LG2 shown – left to right)
(P) X 2
(L) (M)
Determining Installation Site
IMPORTANT ! : The top of the LED screen is 4.75″ above the center line of the
mounting lags in the upper mounting slots. (See Figure 4) IMPORTANT ! : The
bottom of the LED screen is 6″ below the center line of the mounting lags in
the lowest mounting slots.
NOTE: Refer to dimensions drawings on pages 16-19 for further details on
installation locations
NOTE: If desired, the mount installation may be started in the middle of the
video wall, attaching mounts out from the center to the left and right ends.
Installation on smaller walls may be easier if started at the left side of the
video wall using the following instructions.
1. Determine location for the top left corner of the LED wall. (See Figure 4)
2. Make a mark 4.75″ below the planned top left corner of the LED wall. (See
Figure 4)
3. Using a level, mark a horizontal line across width of LED wall from the
mark made in Step 2.
NOTE: This line will indicate the center line for the location of the mounting
lags in the mounting slots for the top mount(s) in the video wall. The
oversize mounting slots will allow some upward adjustment as needed. (See
Figure 4) and (See Figure 5)
1
(Q) x 8
Figure 2 (TILD1X3LG2 shown – from middle out)
(M) x 2
(P) x 2
1 Location for top left corner of LED wall
4.75″
3
2 Figure 4
[TILD1X3LG2 shown as example]
3
Mounting slot center line
1 6
(Q) x 4 Figure 3
Figure 5
Installation Instructions
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
(OPTIONAL) Adding Vertical Connector Kit (Sold Separately) NOTE: If more LED
screens will need to be added to the top or
bottom of the screen configuration, add TILVABPT vertical connector kit to top
or bottom of wall mount using the following instructions. If you are NOT
adding the TILVABPT connector kit, proceed to Installing First Mount section.
IMPORTANT ! : It is easier to install the vertical connector kit BEFORE the
mounts are attached to the wall. However, it can also be installed after the
mounts are attached to the wall. 1. Add the vertical connector (K) to the top
or bottom of the
mount, and fasten with four 1/4-20 x 1/2″ Phillips pan head screws (J) per
vertical connector (K). (See Figure 6)
2. Partially install two 1/4-20 x 1/2″ Phillips pan head screws (J) into top
or bottom screw holes on connectors (K). (See Figure 6)
3. Connect another wall mount to the other end of the vertical connector (K)
by placing open slot over partially installed screws (J). (See Figure 6) and
(See Figure 7)
4. Install two 1/4-20 x 1/2″ Phillips pan head machine screws (J) into inside
holes on connectors (K). (See Figure 7)
5. Tighten screws partially installed in Step 2 to secure mount to connectors
(K). (See Figure 7)
Top mount
place open slot over partially installed Phillips head screw (J) and tighten both screws (J).
4
(J) x 2
Lower mount
2
(J) x 2
Figure 7
3
(K) x 2
1
(J) x 4
Figure 6 NOTE: When connecting a mount to the bottom of an installed
mount, the lower mount may be hung by its open slot on the partially installed
Phillips head screw (J) before tightening the connection. (See Figure 7) NOTE:
When connecting a mount above an already installed mount, the upper mount may
be slid down and attached to the connector in the top of the already installed
mount.
7
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Installation Instructions
Installing First Mount
The TILD1X3LG2 / TILD1X4LG2 /TILD1X5LG2 LED wall mounts are designed to be
mounted to a bare 8″ concrete wall or 8″x 8″x 16″ concrete block wall
Table 1: Fastener Information
WALL TYPE
Drywall attached to plywoodbacked walls /Steel studs Drywall attached to
plywoodbacked walls /Wood studs
Concrete or concrete block
PILOT FASTENERS (see PARTS HOLE drawing)
1/2″
– 1/4-20 x 2-1/2″ hex head lag (not
included)
– 1/4″ washer (not included)
– 1/4-20 Toggler Snaptoggle BB (not included)
7/32″ x 3″
– 5/16 x 2-1/2″ flanged hex head lag (D)
– 5/16″ washer (E)
– Adjustment washer (A, B)
3/8″ x 3″
– 5/16 x 2-1/2″ flanged hex head lag (D)
– 5/16″ washer (E)
– Adjustment washer (A, B)
– Fischer Anchor UX10x60R (C)
1. Hold furthest left, top wall mount against wall ensuring that mounting slot is lined up with center line marked on the wall in Determining Installation Site section. Double-check with a level. (See Figure 8)
2. Mark mounting holes in two top mounting slots along the horizontal line marked in Step 3. (See Figure 8)
NOTE: The mounting holes are 16.87″ apart on-center for left (L) and center (M) or 16.01″ for left (L) and right (N). The hole on the left will be 3.8″ from the left edge of panels. (See Figure 8)
3.8″ from left edge of panels 16.87″
(left and middle shown)
4. Partially install two lag screws into wall, but do NOT completely tighten
to wall. (See Figure 9)
NOTE: (OPTIONAL) If more LED screens need to be added to the top or bottom of
the screen configuration, add TILVABPT vertical connector kit (not included)
to top or bottom of wall mount following instructions in the (OPTIONAL) Adding
Vertical Connector Kit. If you are NOT adding the TILVABPT connector kit,
proceed to Step 5.
(TILD1X3LG2 shown) 5
4
x 2
Figure 9 5. Hang wall mount, aligning upper mounting slots over
fasteners, and adjust side-to-side for proper location, but do NOT completely
tighten to wall. (See Figure 9) 6. Place a level across front of the mount at
bottom of teardrop slots. (See Figure 10) 7. Check the level of the mount at
the bottom of the teardrop slots. (See Figure 10)
Mount teardrop slots
6 Levels
Line showing
center of
2
3
mounting slots
for mounts in LED
Figure 8 3. Drill two pilot holes (see Table 1 for size) at each location
marked in Step 2 (See Figure 8) and follow fastener information located in
Table 1. IMPORTANT ! : Refer to Fastener Installation Methods (located in
Appendix at end of Installation Instructions) for details on installing
product into various wall types.
8
7 Figure 10
Installation Instructions
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
8. Slide the left (A-Left) and right (B-Right) adjustment washers into place behind the partially installed lag screws. (See Figure 11) A (left) B (right)
12. Drill pilot holes in centerline of lower slots (see Table 1 for size) and
follow fastener information (appropriate for wall type) located in Table 1.
(See Figure 13)
13. Double check the level of the mount along the side of the mount. (See
Figure 13)
14. Fully tighten the 5/16 x 2-1/2″ lag screws (D) through the 5/16″ fender
washers (E). (See Figure 13)
13 Level
8 (E) x 2
Figure 11 9. Check the level of the mount at the bottom of the teardrop
slots. (See Figure 12)
10. If the mount is not level, slide or use a dead blow hammer to lightly tap
the spacer into place. This will lift the mount up as the lag screw rides in
the washer’s angled slot. (See Figure 12)
Just a tip – Tighten down the lag screw on the
side that does NOT need to be raised. This creates a pivot point for when the
opposite adjustment washer is tapped into place, and allows that correct side
of the mount to move up.
11. When the mount is leveled, tighten the lag screws (D). (See Figure 12)
14
(D) x 2
12
x 2
Figure 13
Adding Additional Uprights
1. Use four 10-24 x 1/2″ flathead Phillips screws (Q) to secure two spacer
plates (P) to mounting uprights (M or N). (See Figure 14)
NOTE: Add uprights (M or N) one by one from left to right as the mounting
system is being built on the wall.
(TILD1X3LG2 shown)
11
(D) x 2
(P) x 2
(M or N)
10 Dead blow
hammer
9 Level
Figure 12
1
(Q) x 4
Figure 14
2. Lay levels across flat of the mounting holes and center-ofscreen
indicators, and vertically along side of mount to ensure wall mount is square
and level.
NOTE: Lift up slightly on the far side of the second mount to help level the
mount.
9
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Installation Instructions
3. Mark mounting hole in top mounting slot along the horizontal line marked
in Step 3 of Installing First Mount Section. (See Figure 15)
NOTE: The mounting holes are 23.62″ apart on-center for center (M) and center
(M) or 22.76″ for center (M) and right (N) uprights. (See Figure 15)
5
(C)
or2232.6.726″ “cecennteter rtotoceringthetr
x x
3
4
10. Install two fasteners through lower part of mount and tighten.
IMPORTANT ! : For larger LED walls it is helpful to check placement and
alignment of the mounts by putting a few LED housings in place in the bottom
row of the installed mounts (referencing the LED screen installation manual
for specific instructions) during the mount installation, checking alignment
before removing the housings, and then continuing the installation. IMPORTANT
! : Continually recheck the alignment and overall flatness of the wall mounts
during the installation process.
11. Continue the installation process until all wall mounts are attached.
12. Install one #10-24 x 1″ Phillips tapping screw (G) into left upper LED
mounting button hole for each LED screen space. Install the tapping screws
ONLY on the furthest left column of mounts. (See Figure 17)
9
(G)
Figure 15 4. Drill pilot hole (see Table 1 for size) at each location marked
in Step 3 (See Figure 15) 5. Loosely install lag screws (D) into drilled holes
following
fastener information located in Table 1. (See Figure 15) 6. Hang upright (M or
N) with spacer (P) onto lag screw (C).
(See Figure 16) 7. Use four 10-24 x 1/2″ flathead Phillips screws (Q) to
secure
two spacer plates (P) to mounting uprights (M). (See Figure 16)
hang over lag screws
6
7
(Q) x 4
Figure 16 8. Hold the adjustment washers in place by hand and tighten
the fasteners at the top of the mount. (See Figure 11) and (See Figure 12) 9.
Drill lower pilot holes at attachment locations and use same fasteners used at
top of mount. (See Figure 13)
10
[TILD1X3LG2 shown as example]
Model
Fastener
TILD1X3LG2
3
TILD1X4LG2
4
TILD1X5LG2
5
Figure 17
IMPORTANT ! : The tapping screws keep the LED screens from moving left and
right after the panels are installed, and are ONLY installed on the furthest
left column of mounts.
13. Using a drill driver makes installation of the tapping screws (G) easier.
14. Install the remaining #10-24 x 1″ self-tapping screws (G) on the mount,
as necessary, to assist in centering the LED housings. (See Figure 18)
15. Run a string between the self-tapping screws installed in Step 12 to
assist with alignment across long sections of mounts. (See Figure 18)
16. Adjust upright depth as needed following Steps in the Depth adjustment
section.
Installation Instructions
14 Circles indicate tapping screw hole locations for attaching string to
assist with alignment of mounts. Use locations nearest depth adjustment points
for best results.
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
[TILD5X5LG2 shown as example]
Use locations nearest
14
(G) depth adjustment points
for best results.
16
[TILD5X5LG2 with multiple middle columns shown as example for using string to assist with alignment.]
Stwriin1thg5atoligansmsiestnt
Figure 18 11
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Adjustments
Depth Adjust (Macroadjust)
2
1. Remove LED housings from mounting system.
2. Turn 3/4″ hex nuts near feet of mounting system to adjust depth as needed. (See Figure 19)
3. Replace LED housings onto mounting system.
Installation Instructions
M3 hex key
2
Figure 19 Depth Adjust (Microadjust) The depth of each wall mount section is
controlled by the screw in the mounting button, accessible only after removing
LED display from LED housing. 1. Remove LED module from LED housing. 2. Adjust
depth adjustment screw until LED housing is
adjusted to desired depth using an M3 hex key (not included). (See Figure 20)
3. Replace LED module into LED housing. IMPORTANT ! : It is best to make
adjustments in small increments to prevent any binding or torquing of the
mounts. Be sure to adjust the depth evenly for both sides of the mounts.
CAUTION: Over-torquing may cause damage. Do NOT use a drill to make the depth
adjustment.
Figure 20
Installing Housings and LED Screens
WARNING: The TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 LED wall mounts are designed
for use with LED panels only. Exceeding the weight capacity (listed) can
result in serious personal injury or damage to equipment! Do NOT attach LED
panels to TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 LED video wall mounts that
exceed 20 lbs (9.07 kg) regardless of the size or design of the configuration.
IMPORTANT ! : Reference the LED screen installation manual for specific
instructions regarding care, handling, cabling and installation of the LED
housings and screens. NOTE: Begin the installation of the housings in the
lower left
corner of the video wall. NOTE: One complete column of housings should be
installed
before proceeding to the next column. NOTE: Panels may be moved in either
direction for better
access as the panels are being installed.
12
Installation Instructions
LED Panels 3
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Wood Stud
IMPORTANT ! : The TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 LED wall mounts are
designed to be mounted to a 3/4″ thickness plywood-backed, 2″ x 4″ wood studs
(16″ on center minimum) wall with a maximum drywall thickness of 5/8″. 1. Use
one 5/16″ x 2-1/2″ hex flange head lag bolt (D) and one
5/16″ washer (E) through product and into pilot hole. (See Figure 22) 2.
Repeat for remaining pilot holes.
(E)
22
1
(D)
2
Begin LED housing install 1 in the lowest left corner of
the video wall [TILD1X3LG2 wall shown as example] Figure 21
1. Install the first LED housing in the lowest left-hand corner of the video
wall by aligning mounting buttons on the housing with the mounting holes on
the wall mount. (See Figure 21)
2. Move LED housing forward until all four mounting buttons are through
mounting holes in wall mount.
3. Continue with the next housing (directly above installed housing).
NOTE: Be sure to check the level and plumb of the housings often during the
housing installation.
4. AFTER the entire first column of housings are installed, slide the column
to the left side to allow clearance for installation of the second column.
5. After the second column of housings is installed, push to the left until
the first and second columns of housings are touching.
6. Repeat until all housings are installed.
7. Using levels, check the level and plumb of the housings installed on the
mounts and adjust as necessary following information in the Adjustments
section.
8. Connect housings following instructions included with LED screens.
9. Install LED screens following instructions included with screens
Fastener Installation Methods IMPORTANT ! : See Table 1 for appropriate
hardware and pilot hole sizes for various wall types. IMPORTANT ! : The
expanse of the LED wall will most likely mean that attachment of the wall
mounts will not all be in studs. The attachment method will most likely vary
throughout the installation, and more than one of the various methods outlined
here will most likely be used.
Figure 22
Concrete or Concrete Block
IMPORTANT ! : The TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 LED wall mounts are
designed to be mounted to a bare 8″ concrete or 8″x8″x16″ concrete block wall.
- Install one UX10X60R anchor (C) into each pilot hole using
a hammer, making sure that the anchor is flush with the wall. (See Figure 23)
2. Use one 5/16″ x 2-1/2″ hex flange head lag bolt (D) and one 5/16″ washer (E) through product into each anchor in wall. (See Figure 23)
NOTE: 5/16″ washers (E) may not be necessary if using adjustment washers (A and B) to install to wall.
3. Repeat for remaining pilot holes.
1
(C)
(E)
2
(D)
Figure 23
13
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Installation Instructions
Steel Stud
IMPORTANT ! : The TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 LED wall mounts are
designed to be mounted to a 3/4″ thickness plywood-backed, steel stud wall
covered with drywall having a maximum thickness of 5/8”.
IMPORTANT ! : See Site Requirements for Steel Stud Installation section before
proceeding with Steel Studs installation to ensure installation site meets
requirements! The drywall must have a minimum thickness of 1/2″!
1. Hold metal channel on anchor flat alongside plastic straps and slide
channel through hole. (See Figure 24)
Drywall
Plastic straps
1
Figure 24 2. Holding plastic straps on anchor, pull anchor away from wall
until channel rests flush behind wall making sure anchor channel is positioned
vertically on drywall, or steel stud (if present). (See Figure 25) 3. Slide
plastic cap on anchor towards wall until flange of cap is flush with wall.
(See Figure 25)
Plastic cap
Steel stud (if present)
Drywall
Steel stud (if present)
4
Drywall
Plastic cap
Plastic straps
(side view)
Anchor metal channel
Figure 26
5. Line up anchor with attachment point.
6. Insert 1/4-20 x 1-3/4″ Phillips pan head screw through 1/4″ washer, corresponding mounting hole in wall bracket and into anchor, and tighten until flush against wall bracket. DO NOT over tighten! (See Figure 27)
Drywall
Steel stud (if present)
Washer
6
Phillips screw
Wall bracket Anchor metal channel (side view)
Figure 27
2 3
(side view) Anchor metal channel Figure 25
4. Snap off plastic straps on anchor at wall by pushing side to side,
snapping off straps level with flange of plastic cap. (See Figure 26)
14
Installation Instructions
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Site Requirements for Wood or Steel Stud Installation
*Steel stud ONLY
If back side of wall is unfinished, drywall must be installed
to a minimum of one stud left and right of the stud(s) being used to install
the mount. Drywall must be secured to studs with screws a maximum of 12″
(305mm) apart down center of stud.
16″ or 24″ (on center) Studs
There must be a minimum of 1-7/8″ (48mm) clearance inside wall
Plywood
FRONT
3/4″ minimum thickness plywood covered with drywall having maximum thickness
of 5/8″
5/8″ maximum drywall thickness (Both Sides of Stud)
Stud
Steel Stud (2 x 4 / 25ga minimum) Stud type and structural strength must
conform to the North American Specification for the Design of Cold-Formed
Steel Structural Members.
[362 S 125 18, C-Shaped, S-Stud Section]
Security Screws (Optional)
Figure 28
NOTE: For increased security, #10 x 2 1/2″ Phillips screws (H) may be used to secure displays to outer uprights (L or N).
1. After all displays and mounted and leveled, install #10 x 2 1/2″ Phillips screws (H) until the screw contacts mounting buttons of LED displays. (See Figure 29)
1
(H)
Figure 29 15
Installation Instructions
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Configuration Examples
The following are just two examples of the many configurations which are possible with the LG2 Series wall mounts.
FRONT VIEW
STAtIiRldSTTilEdP CONFIGURATION
1.98 50.3 MIN DEPTH
2.56 65.1 MAX DEPTH
TILD1X4LG2-L
TILD1X4LG2-R SKU’s
4-TILD1X4LG2-L 4-TILD1X4LG2-R
BACK VIEW
16
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
5 X 5 configuration
FRONT VIEW NO PANELS
Installation Instructions
1.81 46.0 MIN DEPTH
2.56 65.1 MAX DEPTH
TILD1X5LG2-L
TIL D 1 X5 LG 2-M
TILD1X5LG2-M
TIL D 1 X5 LG 2-M
TILD1X5LG2-M
TIL D 1 X5 LG 2-R
BACK VIEW WITH PANELS
17
Installation Instructions
DIMENSIONS
FRONT VIEW NO PANELS
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
TIL1D1X3
1.81 46.0 MIN. DEPTH
2.56 65.1 MAX DEPTH
CORRESPONDS TO VERTICAL
C/L OF LED PANEL
3/4″ DEPTH ADJUST AT EACH LEVELING FOOT
TILD 1X 3LG 2-M TILD1X3LG2-L
TILD 1X 3 LG 2 -R BACK VIEW WITH PANELS
WITH THE LED PANELS REMOVED, YOU CAN ACCESS THE SCREW IN THE MOUNTING
BUTTON FROM THE FRONT. THE DEPTH CAN THEN BE
ADJUSTED SLIGHTLY UTILIZING AN M3 ALLEN KEY.
A 2-1/2″ SELF TAPPING SCREW ( IN C LU D ED )
CAN BE INSTALLED IN BOTH THE LEFT AND RIG HT SIDE TO COMPLETELY PREVENT THE
LED PANEL FROM BEING
LIFTED UP
DIMENSIONS: INCHES [MILLIMETERS] 18
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
DIMENSIONS…cont’d
FRONT VIEW NO PANELS
3.29 83.7 MIN DEPTH
4.04 102.7 MAX DEPTH
Installation Instructions
TILD1X3 (CONTINUED)
BACK VIEW WITH PANELS
TILD1X3LG2-R T IL D 1X 3 L G 2 – L
FRONT VIEW NO PANELS
CORRESPONDS TO V ER TIC AL
C/L OF LED PANEL
19
TIL D 1 X 4 LG 2 -L TILD 1X4LG 2-M
TILD1X4LG2-R
152.4
TILD1X4
1.81 46.0 MIN DEPTH
2.56 65.1 MAX DEPTH
3/4″ DEPTH ADJUST AT EACH LEVELING FOOT
DIMENSIONS: INCHES [MILLIMETERS]
Installation Instructions
DIMENSIONS…cont’d
BACK VIEW WITH PANELS
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
TILD1X4 (CONTINUED)
FRONT VIEW NO PANELS
WITH THE LED PANELS REMOVED, YOU CAN ACCESS THE SCREW IN THE MOUNTING
BUTTON FROM THE FRONT. THE DEPTH CAN THEN BE
ADJUSTED SLIGHTLY UTILIZING AN M3 ALLEN KEY.
A 2-1/2″ SELF TAPPING SCREW (INCLUDED)
CAN BE INSTALLED IN BOTH THE LEFT AND RIGHT SIDE TO COMPLETELY PREVENT THE LED
PANEL FROM BEING
LIFTED UP
3.29 83.7 MIN DEPTH
4.04 102.7 MAX DEPTH
BACK VIEW WITH PANELS
TILD1X4LG2-L
TILD 1 X4 LG 2-R
152.4
DIMENSIONS: INCHES [MILLIMETERS] 20
Installation Instructions
DIMENSIONS…cont’d
A
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
TILVABP2
TILVAB2 KIT INCLUDES 2 BRACKETS AND HARDWARE
LOOSELY INSTALL THE REAR UPPER SCREWS
SLIDE UPPER MOUNT UPRIGHTS DOWN FROM THE TOP AND INSERT
THE FRONT LOWER SCREWS
DETAIL A SCALE 1 : 1
INSTALL VERTICAL ATTACHMENT BRACKETS AT THE TOP OF THE LOWER UPRIGHTS
IT IS EASIER IF THIS IS DONE PRIOR TO INSTALLING THE MOUNTS ON THE WALL
ALIGN THE FRONT FACES OF THE MOUNTS BY PLACING A LEVEL
ACROSS THE FRONT THEN TIGHTEN SCREWS
C B
DETAIL B SCALE 1 : 2
DETAIL C SCALE 1 : 2.5
DIMENSIONS: INCHES [MILLIMETERS] 21
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Installation Instructions
22
Installation Instructions
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
23
TILD1X3LG2 / TILD1X4LG2 / TILD1X5LG2 / TILVAB2
Installation Instructions
8800-003354 Rev00 2022 Legrand | AV www.legrandav.com 06/2022
USA/International Europe Asia Pacific
A 6436 City West Parkway, Eden Prairie, MN 55344 P 800.582.6480 / 952.225.6000
F 877.894.6918 / 952.894.6918 A Franklinstraat 14, 6003 DK Weert, Netherlands
P +31 (0) 495 580 852 F +31 (0) 495 580 845 A Office No. 918 on 9/F, Shatin
Galleria
18-24 Shan Mei Street Fotan, Shatin, Hong Kong
P 852 2145 4099 F 852 2145 4477
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>