Plastica SSW LIN 12 Chop Saw Wall to Floor Machines
Product Information
The Wall to Floor machine is a specialized equipment designed for welding liners onto walls and floors. It is primarily used in construction and maintenance projects. The machine ensures efficient and precise welding, contributing to the overall quality and durability of the liner installation. Key Features:
- Designed for wall to floor welding
- Allows for team collaboration with two operators
- Promotes adherence to safety guidelines during the Coronavirus outbreak
- Requires regular cleaning and maintenance
- Ensures a safe working environment with the implementation of safe distancing practices
- Requires operators to wear appropriate personal protective equipment (PPE)
Product Usage Instructions
- Supervisor Responsibilities:
- Speak to all team members at the beginning of each day and inquire about any Coronavirus symptoms since starting work.
- If any team member has symptoms, they should follow PHE guidelines.
- Ensure all staff are aware of their responsibility for others’ safety and advise them to report any symptoms they may have.
- Attendance and Reporting:
- Do not come to work if experiencing any symptoms. Inform the supervisor by phone about your absence.
- Team Collaboration:
- A team of two operators should work together to fully complete one liner.
- If required, another team of two can weld a different liner, but they must use a separate wall to floor welding machine.
- Maintenance and Hygiene:
- Keep each machine clean by the operating team.
- Regularly wash hands and clean machine controls.
- Work Schedule:
- Each team should weld for a maximum of 45 minutes.
- After 45 minutes, the team should separate and engage in other work for 15 minutes while maintaining a safe distance of 2 meters from all staff.
- After the 15-minute break, the team can resume welding the same liner on their dedicated welding machine for another 45 minutes.
- Repeat this cycle until the liner is complete. If needed, the team can start a new liner on their dedicated welding machine.
- Safe Distance:
- Maintain a safe distance at all times when welding.
- If a team member needs to lean across the table, the other team member should walk away from the table and maintain a safe distance of 2 meters until the process is completed.
- Once the process is complete, the team member can return to their seat and continue welding the liner.
- Personal Protective Equipment (PPE):
- All operators must wear a face visor or an FFP3 reusable mask when using the Wall to Floor machine.
- Cleaning:
- At the end of each day, clean all welding machines to ensure their proper functioning.
I confirm that I have received the necessary training and understand all the points explained above. I will comply with the provided instructions, wear the required PPE, and prioritize my safety. If I encounter any issues with the machinery, I will promptly inform the Supervisor or Manager and seek further training if needed.
- Name:………………………………………………………………………………………………………….
- Signed: ………………………………………………………………..
- Date:…………………………………
Safe System of Work
OPERATING AND SAFETY INSTRUCTIONS FOR USING WALL TO FLOOR MACHINES DURING
CORONAVIRUS OUTBREAK
- Name: …………………………………………….………….
- Training Date:…..…………………………
Instruction
| Instruction| Understood
or
---|---|---
1| Supervisor to speak to all team members at the beginning of each day and
ask if they have any Coronavirus symptoms since starting work. If anyone does,
they will be told to follow PHE guidelines.
All staff are responsible for others safety and must advise if they have any symptoms.
As a reminder, staff must not come to work if they are experiencing any symptoms and phone to advise they will not be coming to work.
|
2| Providing all members are well, a team of 2 to work together and fully
complete one liner.|
3| Another team of 2 can weld a different liner if required but this must be
on another wall to floor welding machine.|
4| Each machine must be kept clean by the operating team and regular hand
washing and cleaning of controls to take place.|
5| Each team to weld for a maximum of 45 minutes and that team to then
separate and do other work for 15 minutes keeping a safe distance of 2m from
all staff.|
6| After 15 minutes this team can resume welding the same liner on their
dedicated welding machine and continue for another 45 minutes.
Repeat no 5 until the liner is complete. If required, a new liner can then be started by this team on their dedicated welding machine.
|
7| Safe distance must be kept at all times when welding but if a team member
must lean across the table, the other team member must walk away from the
table and practice a safe distance of 2m until the process is completed. Once
complete, the team member can return to their seat and continue welding the
liner.|
8| All operators must wear a face visor or an FFP3 reusable mask when using
the Wall to Floor machine.|
9| At the end of each day, all welding machines to be cleaned.|
I have received the above training and fully understand every point that was explained to me. I confirm that I will wear the required PPE equipment when using the above machinery and take all steps to ensure my own safety. I will ask for further training if I need to and will immediately inform the Supervisor or Manager if there are any issues with the machinery.
- Name: ………………………………………………………………………………………………………….
- Signed: ………………………………………………………………..
- Date:…………………………………
I confirm that I have trained the aforementioned person and that they fully understand how to use the above machinery, have received the required PPE equipment and know to inform me immediately of any issues with the machinery or if they require further training. I authorize this person to use the machinery detailed above.
- Name: …………………………………………………………………….……………(Authorised Trainer)
- Signed ……………………………………………………………………
- Date: …………………………