RUGGED RIDGE CJ-7 Roll Bar Top Installation Guide

June 13, 2024
RUGGED RIDGE

RUGGED RIDGE CJ-7 Roll Bar Top

RUGGED-RIDGE-CJ-7-Roll-Bar-Top-PRODUCT

Product Information

Product Name Roll Bar Top, CJ-7 & YJ
Part Number 13554.15
Manufacturer Rugged Ridge

Product Usage Instructions

Important Notice:

This Roll Bar Top installation requires drilling. Carefully read the instructions before attempting to install this product. Rugged Ridge is in no way responsible for any damage to the vehicle or personal injury that may occur during the installation or use of this product.

  1. Unfold the Roll Bar Top and lay it in direct sunlight for at least 30 minutes. For best results, the temperature should be over 70 degrees. If it is not, you can still install the Roll Bar Top but you will need to tighten the straps after use until stretches smoothly.
  2. Position the Plastic Bracket on the center of the roll bar, mark, and drill. The distance between the bottom center hole and the bottom of the roll bar should be approximately 16 inches. Note that the larger hole on the Plastic Bracket should face the outside of the Jeep.
  3. Repeat Step 2 for the opposite side.
  4. Attach the Straight Bar to the Curved Bars using the two Sheet Metal Screws provided.
  5. Using the two Headless Screws provided, attach the Plastic Feet to the Curved Bars.
  6. Once the Bow Assembly is complete, slide it through the Nylon Loops located on each rear corner of the Roll Bar Top.
  7. Attach the Bow Assembly to the Plastic Bracket (attached to the roll bar in Steps 2 and 3) using the two Large Bolts provided. Make sure the Snap on the Straight Bar is facing the outside of the Jeep.
  8. Pull the Roll Bar Top towards the front of the Jeep and lay it over the windshield channel.
  9. Fold the plastic strip under and insert it into the windshield channel. Center the Roll Bar Top in the channel by pulling from either side as necessary.
  10. Loosely wrap the Velcro straps around the roll bar.
  11. Pull the Roll Bar Top towards the rear of the Jeep and over the Bow Assembly.
  12. Insert the two Long straps through the J-Hooks and thread them through the Buckle, pulling them tight.
  13. Once the J-Hooks are attached to the rear harness, place the J-Hooks under the rear lip of the Jeep and tighten.
  14. Once the Rear Harness is tightened, fasten the Snap located on the center of the Bow Assembly.
  15. Now go back to the side straps and pull each of the side straps tight, working from the front of the vehicle towards the rear. It may be necessary to re-tighten the straps after driving.

IMPORTANT NOTICE:
This Roll Bar Top installation requires drilling. Carefully read the instructions before attempting to install this product. Rugged Ridge is in no way responsible for any damage to the vehicle or personal injury that may occur during the installation or use of this product.

INCLUDED COMPONENTS

  • 1 – Roll Bar Top
  • 2 – “J” Hooks
  • 2 – Curved Bars
  • 1 – Straight Bar
  • 2 – Plastic Feet
  • 2 – Plastic Brackets
  • 4 – Large Sheet Metal Screws
  • 2 – Sheet Metal Screws
  • 2 – Large Bolts
  • 2 – Small Headless Bolts

INSTALLATION INSTRUCTIONS

  1. Unfold the Roll Bar Top and lay it in direct sunlight for at least 30 minutes. For best results, the temperature should be over 70 degrees. If it is not you can still install the Roll Bar Top but you will need to tighten the straps after use until stretches smooth.
  2. Position the Plastic Bracket on the center of the roll bar, mark, and drill (Figure 1). Distance from the bottom center hole and the bottom of the roll bar should be approximately 16” inches. NOTE: The larger hole on the Plastic Bracket should face the outside of the Jeep.RUGGED-RIDGE-CJ-7-Roll-Bar-Top-FIG-1 \(1\)
  3. Repeat Step 2 for the opposite side.
  4. Attach the Straight Bar to the Curved Bars using the two Sheet Metal Screws provided (Figure 2).
  5. Using the two Headless Screws provided attach the Plastic Feet to the Curved Bars (Figure 3).RUGGED-RIDGE-CJ-7-Roll-Bar-Top-FIG-1 \(2\)
  6. Once the Bow Assembly is complete, slide it through the Nylon Loops located on each rear corner of the Roll Bar Top (Figure 4).
  7. Attach the Bow Assembly to the Plastic Bracket (attached to the roll bar in Steps 2 and 3) using the two Large Bolts provided (Figure 5).
    • NOTE: Make sure the Snap on the Straight Bar is facing the outside of the Jeep.
  8. Pull the Roll Bar Top towards the front of the Jeep and lay over windshie ld channel (Figure 6).
  9. Fold the plastic strip under and insert into windshield channel (Figure 7 & 8). Center the Roll Bar Top in the channel by pulling from either side as necessary.RUGGED-RIDGE-CJ-7-Roll-Bar-Top-FIG-1 \(6\)
  10. Loosely wrap the Velcro straps around the roll bar (Figure 9).
  11. Pull the Roll Bar Top towards the rear of the Jeep and over the Bow Assembly.
  12. Insert the two Long straps through the J-Hooks and thread through the Buckle pulling them tight (Figure 10).RUGGED-RIDGE-CJ-7-Roll-Bar-Top-FIG-1 \(7\)
  13. Once the J-Hooks are attached to the rear harness, place the J-Hooks under the rear lip of the Jeep and tighten (Figure 11).
  14. Once the Rear Harness is tightened, fasten the Snap located on the center of the Bow Assembly (Figure 12).
  15. Now go back to the side straps and pull each of the side straps tight, working from the front of the vehicle towards the rear. May be necessary to re-tighten the straps after driving.

CONTACT

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

RUGGED RIDGE User Manuals

Related Manuals