PRIMO P421 Universal Junction Box Instruction Manual

June 13, 2024
PRIMO

PRIMO logo Installation instructions
P421 Universal junction box

P421 Universal Junction Box

PRIMO P421 Universal Junction Box - situ concrete|
---|---
Installation of in-situ concrete: Nail universal can to the formwork with Primo Nagler. The integrated nail fixation allows easy installation.| Open inserts for installation pipes M20/M25 with a step peeling drill or punching pliers.
|
Introduce plumbing pipes. Up to eight installation pipes M20 / M25 can be connected.| Screw the lid on the can body, place the second steel reinforcement and concrete.
|
Assembly factory production: Attach the large universal socket to the control table with hot glue or a magnet. When mounting the magnet, the universal large socket can be precisely aligned.| Install steel reinforcement and concrete the prefabricated part. After concreting, the magnets remain on the switchboard.
PRIMO P421 Universal Junction Box - punching pliers 2| PRIMO P421 Universal Junction Box - plumbing pipes
2
Unscrew the lid and open the inserts for installation pipes M20/M25 with a step peeler drill or punching pliers.| Introduce plumbing pipes. Up to eight installation pipes M20 / M25 can be connected.
PRIMO P421 Universal Junction Box - Screw the lid 2| PRIMO P421 Universal Junction Box - after
concreting
Screw the lid, place steel reinforcement and concrete.| Installation after concreting: Open the lid with a hammer.
PRIMO P421 Universal Junction Box - Recording ceiling
hook|
Recording ceiling hook.|

PRIMO logo P421

Documents / Resources

| PRIMO P421 Universal Junction Box [pdf] Instruction Manual
P421 Universal Junction Box, P421, Universal Junction Box, Junction Box, Box
---|---

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals