PRIMO P421 Universal Junction Box Instruction Manual
- June 13, 2024
- PRIMO
Table of Contents
Installation instructions
P421 Universal junction box
P421 Universal Junction Box
|
---|---
Installation of in-situ concrete: Nail universal can to the formwork with
Primo Nagler. The integrated nail fixation allows easy installation.| Open
inserts for installation pipes M20/M25 with a step peeling drill or punching
pliers.
|
Introduce plumbing pipes. Up to eight installation pipes M20 / M25 can be
connected.| Screw the lid on the can body, place the second steel
reinforcement and concrete.
|
Assembly factory production: Attach the large universal socket to the control
table with hot glue or a magnet. When mounting the magnet, the universal large
socket can be precisely aligned.| Install steel reinforcement and concrete the
prefabricated part. After concreting, the magnets remain on the switchboard.
|
Unscrew the lid and open the inserts for installation pipes M20/M25 with a
step peeler drill or punching pliers.| Introduce plumbing pipes. Up to eight
installation pipes M20 / M25 can be connected.
|
Screw the lid, place steel reinforcement and concrete.| Installation after
concreting: Open the lid with a hammer.
|
Recording ceiling hook.|
P421
Documents / Resources
|
PRIMO P421 Universal Junction
Box
[pdf] Instruction Manual
P421 Universal Junction Box, P421, Universal Junction Box, Junction Box, Box
---|---