VEVOR Walk In Tunnel Greenhouse Portable Plant Instructions
- June 13, 2024
- VEVOR
Table of Contents
VEVOR Walk In Tunnel Greenhouse Portable Plant
ASSEMBLY INSTRUCTIONS
Step 1
Assemble each 4 sets No.5+No.5 together, make them into one part first, use the shorter bolts, put the curved tube on the flat ground, make both tubes horizontal then tighten the nuts. And assemble for 4 sets No.5+No.6 in the same way.
Assemble for 2 sets of floor tubes No3+No4 using the shorter bolts, and the horizontal frame No4+No3+No3 together
Assemble for 2 sets support diagonal tubes No7 + No7A use the shorter bolts
Step 2
Loosely assemble the complete frame, before tightening all bolts in the final position.
Step3
Loosely assemble the complete frame before tightening all bolts in the final position.
Step4
Loosely assemble the completed frame before tightening all bolts in the final position.
Step 5
For maximum stability of your polytunnel,we recommend digging a 20cm width trench around the base or the port tunnel and back
Put the frame inside the trench, filling with soil
Step 6
- Tied the string in the back of the cover to the frame.
- Use the ropes and stakes for four cormers of the greenhouse, to reinforce the stability of it.
WARNING: Covering the roof carefully makes all places in the right
position. as possible so as not to make the frame structure of the greenhouse
out of shape.
DO NOT USE IN BAD WEATHER CONDITIONS, such as rainstorms, hailstone, heavy
snow, and heavy wind.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>