Nexans 33kV CWS Indoor Outdoor Single Core Heat Shrinkable Termination Installation Guide

June 13, 2024
Nexans

Nexans 33kV CWS Indoor Outdoor Single Core Heat Shrinkable Termination Installation Guide
Nexans 33kV CWS Indoor Outdoor Single Core Heat Shrinkable
Termination

MONOi/MONOe-1

INDOOR/OUTDOOR SINGLE CORE HEAT SHRINKABLE TERMINATION INSTALLATION INSTRUCTION IM1778EI.3 ed. 15/09/2020

  • TYPE OF CABLE: Solid insulation (XLPE-HEPR)
  • SECTION: Up to 1600 mm² Cu/Al
  • TYPE OF SCREEN: Copper wires
  • VOLTAGE: Umax 36 kV

Instructions

ASSEMBLY OF THE TERMINATION

Prepare the cable and cut the exceeding length.

Remove the outer sheath for the length “L” (“L” see the table). Abrade the outer sheath for 100 mm and clean with solvent.
Assembly Terminations

TYPE INDOOR TYPE
SECTION RANGE (mm2) 25 ÷ 95
1000 800 ÷ 1200
L (mm) 400
TYPE OUTDOOR TYPE
--- ---
SECTION RANGE (mm2) 25 ÷ 95
1000 800 ÷ 1200
L (mm) 500

Apply a layer (20% overlap) of red mastic “MBA” for 30 mm length.

Red Mastic Mba

Fold back the copper screen wires and fix them temporarely at 150 mm from cut sheath with some turns of pvc tape.

Remove the semi-conductive layer leaving 40 mm out of the outer sheath taking care not to damag  the insulation.
Damag insulation

Bare the conductor for the length “C” (“C”= inside depth of lug) for bolted lug or “C+5mm” in case of compression lug.
Conductor Instructions

Position the lug and crimp it or break the screws in case of bolted lug following the manufacturer’s instructions.
Manufacturer’s Instructions

Apply a layer of red mastic “MBA” (20% overlap) over the screen wires covering the previous layer of “MBA”. Fill the cavities over the lug with red mastic “MBA
Red Mastic Mba

Wrap around the exposed conductor the red mastic “MBA” stretching it, wrap till reaching the lug barrel diameter. Wrap also the same mastic around the lug barrel.
Wrap Around

Remove the protective paper (the one with the printing) from the MACD pad.

Apply the stress relief mastic pad “MACD”, lightly stretched, starting from the cut outer sheath
Remove Protective

Slide the red tube “GT12” (stress control + insulation) till the TOP edge of red mastic “MBA” applied over the cable lug.
Cable Lug

Start heatshrinking from the top downwards.}
Start Heatshrinking

Remove the PVC tape previously applied on the screen wires and split them into two parts; wrap the wires at the bottom of shrunk tube (one round) making a ring.

Twist the screen wires, cut straight and crimp OR screw the grounding lug.

INDOOR TERMINATION IS FINISHED

Product Overawe

Adjust torch to give a soft blue flame with yellow tip.

Heatshrink tubes uniformly avoiding wrinkles along the surface.

Keep the flame moving continuously and maintain adequate distance to avoid over heating.

This product should be installed by competent personnel familiar with electrical equipment and safe operating practices. Parts contained in this kit should be visually inspected for possible damage, and installed in accordance with these instructions. These instructions are not intended as a substitute for adequate training and experience.

Please dispose of all waste according to environmental regulations.

The company reserves the right to alter without notice the information contained in this installation manual.

Nexans Italia S.p.A.
nexans.com/power_accessories
[email protected]

****

****

Nexans Logo

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Nexans User Manuals

Related Manuals