UTEPO Industrial 4 Port Gigabit PoE+ 2 Port SFP L2 Managed Ethernet Switch Installation Guide
- June 13, 2024
- UTEPO
Table of Contents
- UTEPO Industrial 4 Port Gigabit PoE+ 2 Port SFP L2 Managed Ethernet
- Packing List
- Packing List
- Safety Information
- Product Introduction
- Installations
- Connect the Power Supply
- Factory Settings
- Access Network Management
- Specifications
- Announcement
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
UTEPO Industrial 4 Port Gigabit PoE+ 2 Port SFP L2 Managed Ethernet
Switch
Packing List
No. | Items | Quantity |
---|---|---|
1 | Switch | 1 pc |
2 | Plug Connector | 1 pc |
3 | Quick Installation Guide | 1 pc |
Safety Information
- Only qualified and skilled personnel must install, configure, and unmount the device. The device must not be disassembled.
- When operating the device, obey the local safety regulations.
- The safety precautions provided in the document are supplementary and shall be in compliance with the local safety regulations.
- When operating the device, in addition to the precautions (please see the notes below), follow the specific safety instructions.
- The installation and maintenance personnel need to understand the basic safety precautions to be taken.
- Do not block the ventilation while the device is running. Keep a minimum distance of 5 cm from the ventilation to the walls or the other objects that block the ventilation.
- Do not place the device in the environment that has inflammable and explosive air or fog. Do not perform any operation in this environment.
Electric Safety
- Connect the unit only to DC power source that complies with the safety extra-low voltage (SELV) requirements in IEC62368-1 based safety standards.
- Before touching the device or hand-operating parts, wear a grounded electrostatic discharge (ESD) wrist strap. It can prevent the sensitive components from damage by the static electricity in the human body.
Optical Safety
- When handling optical fibers, do not stand close to, or look at the optical fiber outlet directly with unaided eyes.
- Cutting and splicing fibers must be performed by the trained personnel only.
- Before cutting or splicing a fiber, ensure the fiber is disconnected from the optical source. After disconnecting the fiber, use protecting caps to protect all the optical connectors.
Product Introduction Overview
- The switch is Industrial 4-Port Gigabit PoE+ 2-Port SFP L2 Managed Ethernet Switch.
- This switch provides 4 Gigabit Ethernet RJ-45 ports and 2 Gigabit SFP uplink ports. It meets IEEE 802.3af/at standard. All RJ-45 ports support Power-over-Ethernet (PoE+) and deliver up to 30W power per port.
- The switch has extensive L2 management functions, such as 802.1Q VLAN, 802.1P QoS, STP/RSTP, Link aggregation, DHCP and PoE control. It can be easily managed via a WEB GUI (http/https), CLI (telnet/ssh/console) or SNMP.
Hardware Introduction
- Front Panel
- Side Panel
- LED Indicators
Indicators | Status | Descriptions |
---|---|---|
Power 1 | On / Off | Indicator of Power 1 |
Power 2 | On / Off | Indicator of Power 2 |
RUN | Blink / On / Off | System indicator |
The system is working normally.
The system failure
Console Port: The device contains a RJ-45 interface as the console port for local management interface. For the console port, a standard RJ-45 connector is used. Use a RS-232 cable (Sub-D9 to RJ-45) to connect the console port with the COM port of a PC.
Packing List
Please check the following items after unpacking, if any missing, please contact your local dealer.
No. | Items | Quantity |
---|---|---|
1 | Switch | 1 pc |
2 | Plug Connector | 1 pc |
3 | Quick Installation Guide | 1 pc |
Safety Information
Before performing an operation, read the following operation instructions and
precautions to be taken, and follow them to prevent accidents.
General Requirements
- Only qualified and skilled personnel must install, configure, and unmount the device. The device must not be disassembled.
- When operating the device, obey the local safety regulations. The safety precautions provided in the document are supplementary and shall be in compliance with the local safety regulations.
- When operating the device, in addition to the precautions (please see the notes below), follow the specific safety instructions.
- The installation and maintenance personnel need to understand the basic safety precautions to be taken.
- Do not block the ventilation while the device is running. Keep a minimum distance of 5 cm from the ventilation to the walls or the other objects that block the ventilation.
- Do not operate the device in an area that exceeds the maximum recommended ambient temperature of 75°C.
- Do not place the device in the environment that has inflammable and explosive air or fog. Do not perform any operation in this environment.
Electric Safety
- Connect the unit only to DC power source that complies with the safety extra-low voltage (SELV) requirements in IEC62368-1 based safety standards.
- Before touching the device or hand-operating parts, wear a grounded electrostatic discharge (ESD) wrist strap. It can prevent the sensitive components from damage by the static electricity in the human body.
Optical Safety
- When handling optical fibers, do not stand close to, or look at the optical fiber outlet directly with unaided eyes.
- Cutting and splicing fibers must be performed by the trained personnel only.
- Before cutting or splicing a fiber, ensure the fiber is disconnected from the optical source. After disconnecting the fiber, use protecting caps to protect all the optical connectors.
Product Introduction
Overview
- The switch is Industrial 4-Port Gigabit PoE+ 2-Port SFP L2 Managed Ethernet Switch.
- This switch provides 4 Gigabit Ethernet RJ-45 ports and 2 Gigabit SFP uplink ports. It meets IEEE 802.3af/at standard. All RJ-45 ports support Power-over-Ethernet (PoE+) and deliver up to 30W power per port.
- The switch has extensive L2 management functions, such as 802.1Q VLAN, 802.1P QoS, STP/RSTP, Link aggregation, DHCP and PoE control. It can be easily managed via a WEB GUI (http/https), CLI (telnet/ssh/console) or SNMP.
Hardware Introduction Front Panel
Side Panel
LED Indicators
Indicators | Status | Descriptions |
---|
P1
| Indicator of Power 1| On| Power 1 is on.
Off| Power 1 is off.
P2
| Indicator of Power 2| On| Power 2 is on.
Off| Power 2 is off.
RUN
| System indicator| Blink| The system is working normally.
On/Off| The system failure
Console Port
- The device contains a RJ-45 interface as the console port for local management interface. For the console port, a standard RJ-45 connector is used. Use a RS-232 cable (Sub-D9 to RJ-45) to connect the console port with the COM port of a PC.
- See the default configuration in chapter “6 Factory Settings”.
Init Button
- The init button has two operating modes.
- By short pressing the button, the switch will be reset and the configuration is as previous setting saved.
- By pressing the button over 5s, the switch will be restored to the original factory default setting.
Installations
The switch supports DIN-rail installation.
Dimensions (mm) Switch
The DIN-rail hanger is fixed on the switch at the factory. Please Install the switch to the DIN rail directly.
Install the switch to the DIN rail
Connect the Power Supply
Note:
-
The equipment is intended to be grounded to comply with emission and immunity requirements. Ensure that the switch functional ground screw is connected to earth ground during normal use.
-
Use one end of GND cable to connect the M3 grounding connector of the switch, the other end to a ground point.
The GND of the switch is shorted to the copper protection ground bar provided by the user. -
The GND cable used is recommended to be plastic insulating one with copper core, with cross-sectional area greater than 1.5mm².
Ground the switch housing
- The switch is powered by a 48~57V DC power connection. It supports redundant power supply.
- It is possible to connect a second power source using the same voltage with the redundant power supply port. If one source fails, the alternative source takes over the power supply without interruption.
48~57V DC Supply
- The power supply connectors are equipped with 6-pin plug connectors (2 NC pins in the middle of the connector). Please observe the polarity.
- Use DC power cable to connect positive/negative wires of DC power separately to the “+” and “-” power terminals, using a screw driver to screwing stably. Connect the main supply to the building’s power supply network.
Connect DC power to the DC Power Connector
Please observe the following specifications:
Items | Specifications |
---|---|
Wire range | 24~12AWG |
Items | Specifications |
--- | --- |
Wire range | 24~12AWG |
Starting Up
- After connection to the power supply, the switch starts automatically and is ready for operation after approx. 90 s.
- LED indicators “P1” or “P2” turns green.
Note:
- To switch off the device, always disconnect both the main and redundant power supply.
Factory Settings
Note:
Please note that the factory settings may change with future firmware
versions. For this reason we recommend that you check the release notes for
information about any changes to the factory settings before carrying out a
firmware update.
The switch starts with its factory settings:
Items | Specifications |
---|
Management Interfaces
Console Port (Sub-D9 to RJ-45)| Enabled
Baud rate: 115200 bit/s Flow control: No flow control Parity: No parity check
Stop bits: 1
Data bits: 8
SSH| Enabled
Telnet| Enabled
SNMP| Enabled
Web Manager| Enabled
User level| User: admin Password: admin
Access privilege: 15 (Full access rights, This user can adjust all settings of the switch.)
IP Configuration
Default static IP address| 192.168.1.200
Default subnet mask| 255.255.255.0
Physical Ports
Ethernet RJ-45 ports| Ports 1~4
1000M bit/s operation enabled in VLAN 1
SFP ports| Ports 5~6
SFP inserted: 1000Base-X operation
Access Network Management
- After starting up successfully, connect the switch to your local network segment using a suitable cable to access the switch network management system. For details, please refer to one of the following documents:
- Web Configuration Guide
- Describes Web network management system configuration instructions.
- CLI Configuration Guide
- Describes CLI-based configuration instructions.
Specifications
Items | Specifications |
---|
Hardware Specifications
Downlink Ports| 410/100/1000Base-T PoE+ RJ-45
Uplink Ports| 21000Base-X SFP
Console Port| 1*RJ-45 console port
**** Init Button| Short press to restart the switch
Long press >5s to initialize the system
Led Indicators| 2power indicators 1system indicator
Cable| Cat5 or better
Dimensions (WDH)| 143.7mm103.8mm47.7mm
Net Weight| 0.65kg
Input Voltage
| Power 1 (Main): 48~57V DC Power 2 (Backup): 48~57V DC
---|---
Power Consumption| ≤5W (Full load, not including PoE)
Installation| DIN-rail
Material| Metal shell
Switch Property
Forwarding Modes| Store and Forward
Switching Capacity| 12Gbps / non-blocking
Packet Forwarding Rate| 8.9Mpps
MAC Table| 8k, supported auto learning
Packet Buffer| 4Mbit
Jumbo Frame| 9kB
PoE
PoE device| End-span
PoE Standard| IEEE 802.3af/at
PoE Pin Assignment| 1/2(+), 3/6(-)
PoE Power Output| 46~55V DC
PoE Budget
| 30W max for each port 120W max for whole switch
Standard Conformance
Standards Compliance
| IEEE 802.1p Priority Queuing IEEE 802.1Q VLAN tagging
IEEE 802.1D Spanning Tree Algorithm IEEE 802.1w Rapid Spanning Tree IEEE 802.1x Authentication
IEEE 802.3ad Link Aggregation IEEE 802.3x Flow Control IEEE 802.3 Ethernet
IEEE 802.3u Fast Ethernet IEEE 802.3z Gigabit Ethernet
IEEE 802.3af Power Over Ethernet
IEEE 802.3at Power Over Ethernet
EMC
EMC
| FCC 47 CFR Part 15 Class A EN55032 Class A
IEC61000-4-2,Level 3: Contact Discharge: ±8kV, Air Discharge: ±12kV
IEC61000-4-3,Level 3: 10V/m
IEC61000-4-4,Level 2: Power Port: ±4kV; Data Port:
±2kV
IEC61000-4-5,Power Port: Line to Line ±2kV, Line to Earth ±4kV; Data Port: ±2kV
IEC61000-4-6,3V (10kHz-150kHz); 10V (150kHz-80MHz)
LVD
LVD
| EN 62368-1:2014 EN 62328-A11:2017
Environments
Operating
| Temperature: -40℃~75℃
Relative Humidity: 5%~95% (Non-condensation)
Storage
| Temperature: -40℃~85℃
Relative Humidity: 5%~95% (Non-condensation)
Certifications
Certifications| CE, FCC
Announcement
- The information in this document is subject to change without notice.
- The document is only used as operation guide, except for other promises. No warranties of any kind, either express or implied are made in relation to the description, information or suggestion or any other contents of the manual.
- The images shown here are indicative only. If there is inconsistency between the image and the actual product, the actual product shall govern.
Version
- V1.0. Released on 2021.11.29.
Change History
- Updates between document issues are cumulative. Therefore, the latest document issue contains all updates made in previous issues.
Version | State | Release Date | Description |
---|---|---|---|
V1.0 | Released | 2021-11-29 | Initial commercial release. |
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>