UTEPO Port 10G SFP+ L3 Managed Ethernet Switch Installation Guide
- June 12, 2024
- UTEPO
Table of Contents
- UTEPO Port 10G SFP+ L3 Managed Ethernet Switch
- Product Information
- Product Usage Instructions
- Packing List
- Safety Information
- Product Introduction
- Installations
- Connect the Power Supply
- Factory Settings
- Access Network Management
- Specifications
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
UTEPO Port 10G SFP+ L3 Managed Ethernet Switch
Product Information
The product is a switch that comes with various accessories and components. The packing list includes:
- Switch
- Power Cable
- Console cable
- Grounding cable
- Rack mount brackets (2)
- Rubber pads (4)
- Screw package
- Quick Installation Guide
- Warranty card
- QC card
Safety Information
Before operating the device, it is important to follow the safety instructions
and precautions provided:
- Only qualified and skilled personnel should install, configure, and unmount the device. It should not be disassembled.
- Obey local safety regulations while operating the device.
- Follow specific safety instructions in addition to the provided precautions.
- Installation and maintenance personnel should be aware of basic safety precautions.
- Ensure proper ventilation for the device by keeping a minimum distance of 5 cm from walls or objects that block ventilation.
- Operate the device within the recommended ambient temperature limits.
- Avoid operating the device in environments with inflammable and explosive air or fog.
- Follow local safety regulations during AC power supply installation.
- Wear a grounded electrostatic discharge (ESD) wrist strap before touching the device or hand-operating parts.
- Avoid looking directly at the optical fiber outlet without proper protection.
- Cutting and splicing fibers should only be done by trained personnel. Disconnect the fiber from the optical source before performing any operations.
Product Usage Instructions
Rack Mounted Installation
This switch supports 19 rack-mounted installations. Follow the steps below:
- Fix the provided rack-mounted hangers to the left and right side of the device using 4 screws each. Use the four holes on the left and right sides of the device.
Packing List
Please check the following items after unpacking, if any are missing, please contact your local dealer.
No. | Items | Quantity |
---|---|---|
1 | Switch | 1 |
2 | Power Cable | 1 |
3 | Console cable | 1 |
4 | Grounding cable | 1 |
5 | Rack mount brackets | 2 |
6 | Rubber pads | 4 |
7 | Screw package | 1 |
8 | Quick Installation Guide | 1 |
9 | Warranty card | 1 |
10 | QC card | 1 |
Safety Information
Before performing an operation, read the following operation instructions and precautions to be taken, and follow them to prevent accidents.
General Requirements
- Only qualified and skilled personnel must install, configure, and unmounts the device. The device must not be disassembled.
- When operating the device, obey the local safety regulations. The safety precautions provided in the document are supplementary and shall be in compliance with the local safety regulations.
- When operating the device, in addition to the precautions (please see the notes below), follow the specific safety instructions.
- The installation and maintenance personnel need to understand the basic safety precautions to be taken.
- Do not block the ventilation while the device is running. Keep a minimum distance of 5 cm from the ventilation to the walls or the other objects that block the ventilation.
- Do not operate the device in an area that exceeds the maximum recommended ambient temperature.
- Do not place the device in an environment that has inflammable and explosive air or fog. Do not perform any operation in this environment.
Electric Safety
- During the installation of the AC power supply facility, follow the local safety regulations. The personnel who install the AC facility must be qualified to perform high voltage and AC operations.
- Before touching the device or hand-operating parts, wear a grounded electrostatic discharge (ESD) wrist strap. It can prevent sensitive components from being damaged by static electricity in the human body.
Optical Safety
- When handling optical fibers, do not stand close to, or look at the optical fiber outlet directly with unaided eyes.
- Cutting and splicing fibers must be performed by trained personnel only.
- Before cutting or splicing a fiber, ensure the fiber is disconnected from the optical source. After disconnecting the fiber, use protecting caps to protect all the optical connectors.
Product Introduction
Overview
This series of switches is an enterprise-class stackable routing switch with
fixed, built-in 10GbE uplink ports. It has great performance on availability,
scalability, security, and energy efficiency. This fully managed switch
provides high switching capacity, supports wire-speed L2/L3 forwarding, and
high routing performance for IPv4 and IPv6 protocols. Thanks to the VSF
(Virtual Switch Framework), the management work for the network administrator
is simplified. Multiple switches can be virtualized into one logical device,
achieving the sharing of information and data tables between different
switches, which provides more reliability. It delivers high-performance,
hardware-based on IP routing. RIP, OSPF, and BGP provide dynamic routing by
exchanging routing information with other Layer 3 switches and routers. It is
ideal for aggregation or access layers for campus, enterprise, government, and
internet service provider networks.
Hardware Introduction
Front Panel
LED Indicators Instructions
LED Symbol | Status | Description |
---|---|---|
PWR | On (Green) | Power is operating normally |
Off | Power is not operating |
DIAG
| On(Green, blink)| System is loading
On (Green)| System is operating normally
RPS| On (Green)| DC power is operating normally
Off| DC power is not operating
MGMT
| On (Green)| The network management port is linking
Off| The network management port is not linking
Blink| Data forwarding
Installations
This series switch supports three installation modes:
- Rack mounted installation
- Desktop installation
- Wall mounted installation
Rack Mounted Installation
This switch supports a 19” rack-mounted installation. Following the
installation steps below.
Step 1: Fix the provided rack mounted hangers to the left and right side of
the device using 4 screws each. Use the four holes on the left and right side
of the device.| Accessories
---|---
|
Step 2: Install the switch to the rack. The distance between the devices in the rack should be more than 5cm.
Desktop Installations
This series of switches supports the desktop installation. Users can put this
product on the clean, stable, grounded workbench.
Please follow the steps below:
- Carefully put the device upside down, and clean the grooves on the chassis backplane with a soft cloth to make sure there is no oil or dust in it.
- Remove the stickers on the footpad, and paste the footpad on the four corners at the bottom of the switch.
- Carefully put the device upright on the workbench.
Wall-mounted Installations
Drill 4 holes on the wall where the device is installed according to the
dimensions of the switch and accessories. Insert an expansion anchor into each
hole drilled in the wall, and beat the top of it with a rubber hammer until
all the anchor is inserted into the wall.
Please follow the steps below:
- Fix the provided rack-mounted hangers to the left and right side of the device using 4 screws each. Use the four holes on the left and right side of the device.
- Fix the switch to the wall.
Connect the Power Supply
Note:
Ground the switch housing with the grounding screw on the side of the housing!
Always make the ground connection first and disconnect it at the end.
Use one end of the PGND cable to connect the M4 grounding connector of the switch, the other end to a ground point. The PGND of the switch is shorted to the copper protection ground bar provided by the user. The PGND cable used should be an alternating yellow and green plastic insulating one with a copper core, with a cross-sectional area greater than 2.5mm².
The figure below takes rack-mounted installation as an example.
Ground the switch housing
Power Supply
Use a power cable to connect the power connector of the switch. It is
recommended to use the power cable provided in the package. Connect the mains
supply to the building’s power supply network.
Please observe the following specifications:
Items | Specifications |
---|---|
Input Voltage | 100~240V AC, 50~60Hz |
12V DC
Starting Up
After the connection to the power supply, the switch starts automatically. LED
indicator “PWR” turns green, and after about 90s, the system is ready.
Note:
To switch off the device, always disconnect both the main and redundant power
supply.
Factory Settings
Note:
Please note that the factory settings may change with future firmware
versions. For this reason we recommend that you check the release notes for
information about any changes to the factory settings before carrying out a
firmware update.
The switch starts with its factory settings:
Items | Specifications |
---|
Management Interfaces
Console Port| Enabled
- Baud rate: 115200 bit/s Data bits: 8
- Parity: none
- Stop bits: 1
Flow control: none | |
---|---|
Web Manager | **Enable |
** Default static IP address: 192.168.1.200 Default subnet mask: 255.255.255.0 User: admin
- Password: admin
Telnet| Disable, To enable the Telnet, users should configure the IP addresses for the switch and start the Telnet Server function on the switch.
Access Network Management
After starting up successfully, connect the switch to your local network segment using a suitable cable to access the switch network management system. For details, please refer to the following document:
- Management Configuration Guide
Describes network management system configuration instructions.
Specifications
Items
Hardware Specifications
Downlink Port| 16*10/100/1000BASE-X SFP ports
8*1000Mbps Combo (RJ-45/SFP)
Uplink Port| 41/10GBASE-X SFP+
Cable| Cat5 or better
Dimensions (WDH)| 440mm240mm44mm
Single Package Dimensions| 530mm322mm*98mm
Single Package Weight| 3.95kg
Power Supply| AC: 100~240V AC, 50~60Hz DC: 12V DC
Power Consumption| <40W(Full load)
Material| Metal shell
Switch Property
Forwarding Modes| Store and Forward
Switching Capacity| 598Gbps/5.98Tbps
Packet Forwarding Rate| 166Mpps/252Mpps
Environments
Operating| 0°C~50°C, 10%~90% (Non-condensation)
Storage| -40°C~70°C, 10%~95% (Non-condensation)
24-Port Gigabit SFP(8-Port Gigabit Combo) 4- Port 10G SFP+ L3 Managed Ethernet Switch
Announcement
The information in this document is subject to change without notice. The
document is only used as an operation guide, except for other promises. No
warranties of any kind, either express or implied are made in relation to the
description, information or suggestion or any other contents of the manual.
The images shown here are indicative only. If there is an inconsistency between the image and the actual product, the actual product shall govern.
Version
V1.1. Released on 2023-04-03.
Change History
Updates between document issues are cumulative. Therefore, the latest document
issue contains all updates made in previous issues.
Version | State | Release Date | Description |
---|---|---|---|
V1.0 | Released | 2022-10-31 | Initial commercial release. |
V1.1 | Released | 2023-04-03 | Add “Single Package Weight” and “Single Package |
Dimensions”.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>