LIGHTOLIER IS-CASK Calculite Cylinder Pendant Stem Kit Instructions
- June 13, 2024
- LIGHTOLIER
Table of Contents
LIGHTOLIER IS-CASK Calculite Cylinder Pendant Stem
Read and Understand these instructions before proceeding.
This fixture is intended for installation in accordance with the National Electrical Code and Local Regulations. To assure full compliance with local codes and regulations, check with your local electrical inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding. Allow fixture to cool before handling.
NOTE: When installing CASK stem kit with 3DPI series, use Installation Instructions supplied with the 3DPI series pendant.
Retain these instructions for maintenance reference.
Installation Instructions for:
- CASKAL
- CASKBK
- CASKWH
Instructions for Stem Kit (CASKXX)
Step 1
Stem Adjustment (optional): Cut Stem to desired length and deburr inside edge. Insert Swivel Ball casting onto the Stem with the edge of the cut even with the back of the cast ball (Fig. A). Install one Set Screw so that it “bites” onto the Stem using supplied Allen Wrench (Fig. B).
Drill a 1/8” hole (drill bit not provided) in the Stem through the tapped hole, opposite the Set Screw installed (Fig. A). Always use eye protection.
Loosen the Set Screw in the casting and rotate Swivel Ball 180⁰ placing the Set Screw into the newly drilled hole for alignment. Drill a second 1/8” hole in the Stem through the opposite tapped hole. Deburr any sharp edges on the inside of the Stem due to drilling operation (Fig. A).
Insert and tighten second Set Screw into tapped hole with supplied Allen
Wrench (Fig. B). Pins fom both Set Screws should engage the Stem through
the drilled holes (Fig. C).
Step 2
Preparation: Install 5 wires through Stem with Swivel Ball installed. Insert
Stem through Half Ball Mounting Plate. Insert Bushing into Retaining Clip.
Slide Retaining Clip onto Half Ball Mounting Plate, threading wires through
Bushing (Fig. D).
Install Round Crossbar Plate to J-Box using 2 Mounting Screws (not provided)
(Fig. E).
Fig. E
Step 3
Wire In – Canopy: Wire to supply leads. Wire neutral supply lead to white
wire, hot supply lead to black wire, and bare copper and/or green wire must be
connected to supply ground. Use wire nuts supplied. For 0-10V dimming, or
digital dimming: wire purple & gray leads to appropriate control wires. Place
electrical connections in J-Box.
Step 4
Install Canopy: Take assembly from Step 2 and insert the Half Ball Mounting Plate through the Round Crossbar Plate at an angle. Push the remaining side up and slide into place. Use Locking Screw to secure in place (Fig. F).
Slide Canopy Cover over the stem from the bottom up to the ceiling until
secure (Fig. G).
Step 5
Install: Mount Stem on top of Luminaire (Example: Top Cover) using the
supplied Hex Nut to secure (Fig. H).
Step 6
Wire In: Wire Stem supply leads to luminaire. Wire neutral supply lead to
white wire, hot supply lead to black wire, and bare copper and/or green wire
must be connected to supply ground.
Use wire nuts supplied. For 0-10V dimming, or digital dimming: wire purple &
gray leads to appropriate control wires. (Fig. D) Place all electrical
connections in Cylinder.
Align Cylinder Top Cover bolt pattern and use the supplied Cover Screws to secure fixture. (See Luminaire Instructions)
This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
Signify North America Corporation
400 Crossing Blvd, Suite 600
Bridgewater, NJ 08807, USA
Téléphone: 855-486-2216
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>