This luminaire is intended for installation in accordance with the National
Electrical Code and local regulations. To assure full compliance with local
codes and regulations, check with your local electrical inspector before
installation.
To prevent electrical shock, turn off electricity at fuse box before
proceeding. Allow fixture to cool before handling
Retain these instructions for maintenance reference
Installation
Installation for Rough-in section for non-IC new construction:
- 3RN
- 7RN
- 3SN
- 4RN
- 4SN
- 6RN
- 6SN
Caution (RISK OF FIRE)
This is a non-IC rated frame-in kit. Do not install insulation above or within 3 inches (76mm) of any part of luminaire. Use only with LED light modules and reflector trims provided by Signify. Use of other manufacturers trims may void the Underwriters Laboratories listing and could constitute a fire hazard.
May require minimum center-to-center spacing installation. Must reference light module instruction sheet IS-MS_IC.
Instructions for grid ceiling applications
Step 1
Preparation: Cut appropriately sized hole in ceiling tile (by others) at the
position desired and place ceiling tile in grid (by others) (Fig.A). Loosen
wing nuts on mounting bar clamps enough to allow free movement of mounting
bars (Fig.B).
Round
Square
Fig. A
Fig. B
Step 2
Position Frame: Place frame on top of ceiling tile and center the frame
aperture on the ceiling tile hole cut in step 1. Orient the frame to align
with the grid. Grasp the T-bar clips on each end, one in each hand, lift the
clips to the top of the adjustment slots in the end bracket, extend the end
brackets to contact the ceiling grid, and drop each T-bar clip over the grid
(Fig.C).
Fig. C
Step 3
Clamp to Grid and Lock Frame:
Making certain that the frame is still centered on the ceiling tile, tighten
the T-bar clip wing nuts to attach the frame to the ceiling grid. Re-tighten
the mounting bar clamps after the frame is positioned satisfactorily and is
locked to the ceiling grid.
Instructions for wood frame ceiling applications
Step 1
Preparation: Remove wing nuts on T-bar clips and remove clips from frame.
Discard both the clips and wing nuts (Fig.D). Loosen wing nuts on frame clamps
enough to allow free movement of mounting bars (Fig.B).
Fig. D
Step 2
Position and install frame: Position frame between joists with the end
bracket at one end placed against, and flush to, the bottom of the joist. When
positioned, fasten end bracket with nail or screw through any of the provided
holes in the bracket (Fig.E). Extend the end bracket at the opposite end of
the frame until it contact the opposite joist. Align and attach.
Slide the frame along the mounting bars until the aperture is in the desired
position and lock the frame in place by tightening the wing nuts on the
mounting bar clamps.
Fig. E
Note: The mounting bars may be readily adjusted to fit openings between 13″ (330mm) minimum and 24″ (610mm) maximum.
Instructions for metal furring / hat channel applications (1/2, 7/8, &
1-1/2)
Step 1
Preparation: Loosen wing nuts on mounting bar clamps enough to allow free
movement of mounting bars (Fig. F).
Fig. F
Step 2
Position and install frame: Each of the three size channels utilize one
of the three positioning slots located on each end of the mounting bar system
(Fig.F) and on the T-bar clips (Fig.G). Bend the slotted tabs on end of one of
the mounting bar system to approximately 45°from original position.
Place this prepared bar end onto one of the channels, then extend the other
bar end to the opposite channel, ensuring the slot chosen positions the frame
flush with the bottom of the channel. Bend the remaining two slotted tabs into
position it to align with the other channel. Drop both T-bar clips over the
edge of channel and tighten wing nut to secure.
Slide the frame along the mounting bars until the aperture is in the desired
position and lock the frame in place by tightening the wing nuts on the
mounting bar clamps.
Fig. G
Mounting system is designed to install into channel with a height dimension of 1/2″, 7/8″ or 1-1/2″.
Instructions for all applications
Wire in: Wire to supply leads. Wire neutral lead supply lead to white wire, hot supply lead to black wire, and bare copper and/or green wire must be connected to supply ground. Use wire nuts (local hardware item). Place all electrical connections in the j-box and close j-box door.
For luminaires with 0-10V dimming, or digital dimming: wire purple & gray leads to appropriate control wires. Additional orange wire is for future expansion and should remain capped off when not in use.
For square frames: adjustment of the position can be accomplished by loosening the wing nut clamp and rotating the inner square of the frame. Re- tighten the wing nut clamps when appropriately positioned.
For Color Kinetics iHue driver applications: wire the data conductor from
the Color Kinetics Data Enabler to the purple conductor.
The data conductor from the Color Kinetics Data Enabler provides a proprietary
control signal, that is required to operate the luminaire.
CAUTION – The data conductor is NOT isolated.
Data Enabler Pro
https://www.colorkinetics.com/global/products/pds/dataenablerpro
© 2019 Signify Holding. All rights reserved. This document may be subject to change. No representation or warranty as to the accuracy or completeness of the information included herein is given and any liability for any action in reliance thereon is disclaimed. All trademarks are owned by Signify Holding or their respective owners.
Signify Canada Ltd.
281 Hillmount Road.
Markham, ON. Canada L6C 2S3
Telephone 800-668-9008
Signify North America Corporation
200 Franklin Square Drive.
Somerset. NJ 08873
Telephone 855-486-2216
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>