Tigo QSG 002-00119-00 3.0 EI Inverter
Order of Installation
Install an EI system in this order:
- Install TS4s and the Tigo Access Point (TAP) anytime before wiring the inverter.
- Mount the ATS and connect it to the grid. To enable household power pending commissioning, use the ATS manual bypass feature described in the ATS QSG.
- Mount the inverter and E-Stop rapid shutdown switch.
- Place the battery.
- Wire communications and power connections. You must install communications connections.
- Connect an antenna.
- Commission the system.
Inverter Bottom Panel
Communication Connections
Enclosure Mounting
Locate all EI enclosures:
- In a well-ventilated, easily accessible location.
- On a flat surface against a solid wall without tilt.
- Away from antennas and electromechanical interference.
- Sheltered from direct sunlight and precipitation with ambient temperature <50°C.
- Above potential flooding.
Inverter Grounding Points
- Enclosure grounding conductors: 10 – 8 AWG
- Equipment grounding conductor (EGC) busbar:
- Grounding electrode conductor (GEC) terminal:
Inverter – ATS
Power Connections
Use copper, non-stranded wire with ferrules.
E-Stop Rapid Shutdown Switch
- Required if using a battery.
- Mount the E-Stop switch within a few feet of the inverter or service entrance outside the residence. It must be clearly visible and accessible to first responders and maintenance workers.
- Affix the rapid shutdown label within 3ft of the E-Stop switch.
Commissioning
Commission the system after double-checking all connections and installing the Tigo EI mobile app.
- Turn ATS breakers and the inverter and battery DC disconnects to ON.
- Turn on disconnects/breakers between the grid and the ATS.
- Ensure the E-Stop shutdown button is not engaged.
- If the inverter does not start, force-start the battery by removing the start button cover and pressing until the green leaf status LED flashes rapidly.
- Ensure Bluetooth is enabled on your mobile device, open the Tigo EI app, and tap + to create a new system.
- Open Select Equipment, tap Scan and select EI Inverter.
- Complete the commissioning process in the Tigo EI app. For detailed instructions, visit the tigoenergy.com Help Center.
Inverter System Status Indicators
- Tigo Energy, Inc.
- 655 Campbell Technology Pkwy. Campbell, CA 95008
- +1 408 402 0802www.tigoenergy.com
References
- Intelligent Solar Energy Systems | Tigo Energy
- Intelligent Solar Energy Systems | Tigo Energy
- Tigo ATS
- Downloads & Documentation | Tigo Energy
- Intelligent Solar Energy Systems | Tigo Energy
- Connecting to the iTunes Store.
- Tigo EI Battery
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>