OZOTECH EOG Enhanced Oxidation Generator Installation Guide
- June 12, 2024
- OZOTECH
Table of Contents
OZOTECH EOG Enhanced Oxidation Generator
Product Information
The product mentioned in the user manual is OzotechEOG. It is a device that is
used in conjunction with a control valve to program ozone start and end
schedules.
Product Usage Instructions
- Disconnect power to the control valve.
- Remove the front cover from the valve backplate.
- Release the control board bracket from the backplate.
- Replace the control valve front cover.
- Plug the supplied wall transformer into a wall outlet.
- Plug the male DC plug into the female DC jack located at the back of the OzotechEOG.
- Program ozone start and end schedule using the control valve PCB:
- Enter cycle programming mode.
- Set backwash to 14 minutes.
- Set draw time to 40 minutes.
- Turn off the fill.
- Turn off the rinse.
- Set the relay to on.
- Set the relay on time to 15 minutes (one minute longer than backwash).
- Set the relay duration for 38 minutes (2 minutes less than the draw time).
- Return to service.
- Press the regeneration button to lock in timing.
EOG Installation Pre-Field Install
- Mount the OzotechEOG to the Clack® control valve. A #2 Philips screwdriver will be required.
- Install clamp ring into OzotechEOG backplate receiver.
- Install port clip into OzotechEOG backplate receiver.
- Loosen the clamp screw, and slide the clamp over the valve injector cap.
- Rotate OzotechEOG counterclockwise to secure the port clip. Tighten the clamp screw.
- Disconnect power to the control valve. Remove the front cover from the valve backplate. Release the control board bracket from the backplate.
- Route the grey control wire from the OzotechEOG into the Clack® valve housing through the hole in the backplate, and through the strain relief channel above to keep the wiring in place.
- Leave enough wire length to connect to the signal relay terminal block of the control circuit board. Make sure the wire is flush in the channel for proper bracket installation.
- Replace the control board bracket into the backplate until it “snaps” into place.
- Secure red wire into RLY 1 terminal, and black wire into +COM the terminal on the Clack® control board.
- Replace the control valve front cover.
- Plug the supplied wall transformer into a wall outlet. Plug the male DC plug into the female DC jack located at the back of the OzotechEOG.
- Program ozone start and end schedule using control valve PCB.
- Enter cycle programming mode
- Set backwash to 14 minutes
- Set draw time to 40 minutes
- Turn off fill
- Turn off rinse
- Set relay to “on”
- Set the relay on time to 15 minutes (one minute longer than backwash)
- Set the relay duration for 38 minutes (2 minutes less than the draw time)
- Return to service
- Press the regeneration button to lock in the timing
Ozotech, Inc. 1015 South Main Street, Yreka, CA 96097 Ph. 530.842.4189 ozotech.com
References
Read User Manual Online (PDF format)
Loading......